Refine
Year of publication
- 2006 (276) (remove)
Institute
- Fachbereich Medizintechnik und Technomathematik (46)
- Fachbereich Wirtschaftswissenschaften (42)
- Fachbereich Bauingenieurwesen (39)
- Fachbereich Luft- und Raumfahrttechnik (31)
- Fachbereich Energietechnik (29)
- Fachbereich Elektrotechnik und Informationstechnik (27)
- Fachbereich Maschinenbau und Mechatronik (25)
- IfB - Institut für Bioengineering (20)
- Fachbereich Chemie und Biotechnologie (17)
- INB - Institut für Nano- und Biotechnologien (17)
Has Fulltext
- no (276) (remove)
Document Type
- Article (178)
- Conference Proceeding (53)
- Book (29)
- Patent (6)
- Part of a Book (5)
- Other (2)
- Report (2)
- Master's Thesis (1)
Keywords
- Asteroid Deflection (1)
- Planetary Protection (1)
- Solar Sail (1)
- Trajectory Optimization (1)
Betoninstandsetzung
(2006)
Bauwirtschaft und Baurecht
(2006)
Der Modell-Roller
(2006)
Die Hamburger Hochbahn AG benötigte im Rahmen der Überarbeitung einer langfristigen Instandhaltungs- und Erneuerungsstrategie für ihre U-Bahn-Infrastruktur eine belastbare Aussage über die Restlebensdauer der Holzschwellen im Tunnel. Aus diesem Grunde beauftragte sie das Institut für Verkehrswesen, Eisenbahnbau und -betrieb (IVE) der Universität Hannover mit der Erstellung eines entsprechenden Gutachtens. Das Ergebnis führte zu der gesicherten Aussage einer erheblich längeren Restlebensdauer der Tunnelschwellen gegenüber den bisherigen, geschätzten Annahmen.
Under DLR-contract, Giessen University and DLR Cologne are studying solar-electric propulsion missions (SEP) to the outer regions of the solar system. The most challenging reference mission concerns the transport of a 1.35-tons chemical lander spacecraft into an 80-RJ circular orbit around Jupiter, which would enable to place a 375 kg lander with 50 kg of scientific instruments on the surface of the icy moon "Europa". Thorough analyses show that the best solution in terms of SEP launch mass times thrusting time would be a two-stage EP module and a triple-junction solar array with concentrators which would be deployed step by step. Mission performance optimizations suggest to propel the spacecraft in the first EP stage by 6 gridded ion thrusters, running at 4.0 kV of beam voltage, which would save launch mass, and in the second stage by 4 thrusters with 1.25 to 1.5 kV of positive high voltage saving thrusting time. In this way, the launch mass of the spacecraft would be kept within 5.3 tons. Without a launcher's C3 and interplanetary gravity assists, Jupiter might be reached within about 4 yrs. The spiraling-down into the parking orbit would need another 1.8 yrs. This "large mission" can be scaled down to a smaller one, e.g., by halving all masses, the solar array power, and the number of thrusters. Due to their reliability, long lifetime and easy control, RIT-22 engines have been chosen for mission analysis. Based on precise tests, the thruster performance has been modeled.
Development of an optimized LSO/LuYAP phoswich detector head for the Lausanne ClearPET demonstrator
(2006)
This paper describes the LSO/LuYAP phoswich detector head developed for the ClearPET small animal PET scanner demonstrator that is under construction in Lausanne within the Crystal Clear Collaboration. The detector head consists of a dual layer of 8×8 LSO and LuYAP crystal arrays coupled to a multi-anode photomultiplier tube (Hamamatsu R7600-M64). Equalistion of the LSO/LuYAP light collection is obtained through partial attenuation of the LSO scintillation light using a thin aluminum deposit of 20-35 nm on LSO and appropriate temperature regulation of the phoswich head between 30°C to 60°C. At 511keV, typical FWHM energy resolutions of the pixels of a phoswich head amounts to (28±2)% for LSO and (25±2)% for LuYAP. The LSO versus LuYAP crystal identification efficiency is better than 98%. Six detector modules have been mounted on a rotating gantry. Axial and tangential spatial resolutions were measured up to 4 cm from the scanner axis and compared to Monte Carlo simulations using GATE. FWHM spatial resolution ranges from 1.3 mm on axis to 2.6 mm at 4 cm from the axis.
Strategien zur Zustandserfassung von Kanalisationen. Aachener Schriften zur Stadtentwässerung. Bd 7
(2006)
Bauhaus Europa: Die Genese
(2006)
Unfallverhütung
(2006)
Kalkulation
(2006)