Refine
Year of publication
Institute
- Fachbereich Bauingenieurwesen (711) (remove)
Document Type
- Article (333)
- Conference Proceeding (139)
- Book (118)
- Part of a Book (86)
- Report (19)
- Doctoral Thesis (6)
- Contribution to a Periodical (2)
- Course Material (2)
- Patent (2)
- Working Paper (2)
Keywords
- Kanalisation (4)
- Wasserbau (4)
- Wasserwirtschaft (4)
- metal structure (4)
- steel (4)
- Aachen / Fachhochschule Aachen / Fachbereich Bauingenieurwesen (3)
- Absolvententreffen (3)
- Alfha.net (3)
- Alumni (3)
- Fließgewässer (3)
Untersuchungen zur Tragfähigkeit und Steifigkeit eines neuartigen Wandelements in Holzbauweisen
(2018)
New information regarding the influence of a stepped chute on the hydraulic performance of the United States Bureau of Reclamation (Reclamation) Type III hydraulic jump stilling basin is presented for design (steady) and adverse (decreasing tailwater) conditions. Using published experimental data and computational fluid dynamics (CFD) models, this paper presents a detailed comparison between smooth-chute and stepped-chute configurations for chute slopes of 0.8H:1V and 4H:1V and Froude numbers (F) ranging from 3.1 to 9.5 for a Type III basin designed for F = 8. For both stepped and smooth chutes, the relative role of each basin element was quantified, up to the most hydraulic extreme case of jump sweep-out. It was found that, relative to a smooth chute, the turbulence generated by a stepped chute causes a higher maximum velocity decay within the stilling basin, which represents an enhancement of the Type III basin’s performance but also a change in the relative role of the basin elements. Results provide insight into the ability of the CFD models [unsteady Reynolds-averaged Navier-Stokes (RANS) equations with renormalization group (RNG) k-ϵ turbulence model and volume-of-fluid (VOF) for free surface tracking] to predict the transient basin flow structure and velocity profiles. Type III basins can perform adequately with a stepped chute despite the effects steps have on the relative role of each basin element. It is concluded that the classic Type III basin design, based upon methodology by reclamation specific to smooth chutes, can be hydraulically improved for the case of stepped chutes for design and adverse flow conditions using the information presented herein.
Vectrino profiler spatial filtering for shear flows based on the mean velocity gradient equation
(2018)
A new methodology is proposed to spatially filter acoustic Doppler velocimetry data from a Vectrino profiler based on the differential mean velocity equation. Lower and upper bounds are formulated in terms of physically based flow constraints. Practical implementation is discussed, and its application is tested against data gathered from an open-channel flow over a stepped macroroughness surface. The method has proven to detect outliers occurring all over the distance range sampled by the Vectrino profiler and has shown to remain applicable out of the region of validity of the velocity gradient equation. Finally, a statistical analysis suggests that physically obtained bounds are asymptotically representative.
Schalung und Gerüste
(2019)
Die grundsätzliche Planung von Schalungsaufgaben wird heute in der Regel im Rahmen der Arbeitsvorbereitung von den entsprechenden Stabsabteilungen oder als Serviceleistung von den Schalungsherstellern mit Anwendung von spezieller Software und den technischen Unterlagen für die jeweiligen Schalungsgeräte durchgeführt. Diese Programme und technischen Unterlagen stehen in der Regel auch den Mitarbeitern in der Bauleitung zur Verfügung, werden dort aber eher seltener genutzt. Zur Anwendung auf der Baustelle stellen die Schalungshersteller neben den technischen Unterlagen Bemessungstabellen zur Verfügung, welche die Auswahl und Dimensionierung einzelner Schalungen wesentlich erleichtern.
Die nachfolgend aufgeführten Beispiele aus dem Bereich Schalung und Gerüste beschreiben Aufgaben, die im Baustellenbetrieb auf die Bauleitung zu kommen können und auch ohne Unterstützung einer Stabsabteilung gelöst werden können.
Vermessung
(2019)
Der baurechtliche Vertrag
(2019)
Anhand von kurzen theoretischen Einführungen werden anhand von Beispielen die wesentlichen Aspekte des baurechtlichen Vertrages erläutert. Nach einer Einführung über das Zustandekommen von (Bau-) Verträgen wird die für Streitfälle unerlässliche Dokumentation auf Baustellen erläutert. Hierbei werden Hinweise zur Erstellung von Protokollen, zum E-Mail bei Großprojekten und zur Dokumentation von Stundenlohnarbeiten gegeben. Des Weiteren wird eine Schriftverkehrsliste vorgestellt, die zur Nachverfolgung des Schriftverkehrs bei Großprojekten unerlässlich ist.
Anschließend werden die typischen Vertragsarten vorgestellt, die bei der Abwicklung von Großprojekten zu beachten sind und die Unterschiede werden durch Fallbeispiele erläutert.
Einen Schwerpunkt des Kapitels bilden auftragsnehmerseitige Verzüge sowie mangelbehaftete Leistungen. Hier werden Hinweise gegeben, wie in den entsprechenden Situationen zu reagieren ist.
Baukosten und Finanzierung
(2019)
Boden, Baugrube, Verbau
(2019)
Im folgenden Kapitel werden die wichtigsten geotechnischen Nachweise sowie praxisnahe Beispiele für den Baubetrieb aufgeführt. Es wird im Wesentlichen auf die Bodenbeschreibung und Klassifikation nach DIN 18196 sowie nach DIN 18300 eingegangen, welche sowohl für die weiteren Berechnungen als auch für die Kalkulation von großer Bedeutung sind.
Die aus der Praxis aufgeführten Beispiele verdeutlichen verschiedene Untersuchungs- und Auswertungsmethoden für direkte und indirekte Aufschlüsse, diese enthalten Labor- und Feldversuche, mit denen man die Verdichtbarkeit von Böden auswertet und quantifiziert, sowie viele andere Themenbereiche wie Erddruckberechnungen sowie Spannungs- und Setzungsberechnungen.
Darüber hinaus werden exemplarisch bestimmte Verbauarten bezüglich ihrer Bemessung erläutert. Es wird ebenfalls auf das Thema Wasserhaltung eingegangen und die erforderlichen Maßnahmen beschrieben, um bestimmte Versagensmechanismen - wie z.B. den hydraulischen Grundbruch - zu verhindern.
Arbeitssicherheit
(2019)
Übungsaufgaben und Berechnungen für den Baubetrieb: Klausurvorbereitung mit ausführlichen Lösungen
(2019)
Übungsaufgaben und Berechnungen für den Baubetrieb: Klausurvorbereitung mit ausführlichen Lösungen
(2019)
Betriebsorganisation
(2019)
Übungsaufgaben und Berechnungen für den Baubetrieb: Klausurvorbereitung mit ausführlichen Lösungen
(2019)
Kalkulation
(2019)
Baumaschinen
(2019)
We present first results from a newly developed monitoring station for a closed loop geothermal heat pump test installation at our campus, consisting of helix coils and plate heat exchangers, as well as an ice-store system. There are more than 40 temperature sensors and several soil moisture content sensors distributed around the system, allowing a detailed monitoring under different operating conditions.In the view of the modern development of renewable energies along with the newly concepts known as Internet of Things and Industry 4.0 (high-tech strategy from the German government), we created a user-friendly web application, which will connect the things (sensors) with the open network (www). Besides other advantages, this allows a continuous remote monitoring of the data from the numerous sensors at an arbitrary sampling rate.Based on the recorded data, we will also present first results from numerical simulations, taking into account all relevant heat transport processes.The aim is to improve the understanding of these processes and their influence on the thermal behavior of shallow geothermal systems in the unsaturated zone. This will in turn facilitate the prediction of the performance of these systems and therefore yield an improvement in their dimensioning when designing a specific shallow geothermal installation.
Membrane contactors are a promising alternative for nitrogen removal and recovery from process water compared to other physicochemical and biological sidestream treatment processes. Münster wastewater treatment plant (WWTP) is the first municipal WWTP in Germany operating a full-scale membrane contactor system to improve the nitrogen elimination and recovery efficiency. Factors influencing the operation and membrane performance are investigated in an accompanying research project. Additional operational aspects of the applied membrane modules are investigated in detail using a bench-scale membrane contactor. First results of the full-scale application demonstrate a high nitrogen removal efficiency of >95%.
Different analytical approaches exist to describe the structural substance or wear reserve of sewer systems. The aim is to convert engineering assessments of often complex defect patterns into computational algorithms and determine a substance class for a sewer section or manhole. This analytically determined information is essential for strategic rehabilitation planning processes up to network level, as it corresponds to the most appropriate rehabilitation type and can thus provide decision-making support. Current calculation methods differ clearly from each other in parts, so that substance classes determined by the different approaches are only partially comparable with each other. The objective of the German R&D cooperation project ‘SubKanS’ is to develop a methodology for classifying the specific defect patterns resulting from the interaction of all the individual defects, and their severities and locations. The methodology takes into account the structural substance of sewer sections and manholes, based on real data and theoretical considerations analogous to the condition classification of individual defects. The result is a catalogue of defect patterns and characteristics, as well as associated structural substance classifications of sewer systems (substance classes). The methodology for sewer system substance classification is developed so that the classification of individual defects can be transferred into a substance class of the sewer section or manhole, eventually taking into account further information (e.g. pipe material, nominal diameter, etc.). The result is a validated methodology for automated sewer system substance classification.
Energy saving ordinances requires that buildings must be designed in such a way that the heat transfer surface including the joints is permanently air impermeable. The prefabricated roof and wall panels in lightweight steel constructions are airtight in the area of the steel covering layers. The sealing of the panel joints contributes to fulfil the comprehensive requirements for an airtight building envelope. To improve the airtightness of steel sandwich panels, additional sealing tapes can be installed in the panel joint. The influence of these sealing tapes was evaluated by measurements carried out by the RWTH Aachen University - Sustainable Metal Building Envelopes. Different installation situations were evaluated by carrying out airtightness tests for different joint distances. In addition, the influence on the heat transfer coefficient was also evaluated using the Finite Element Method (FEM). The combination of obtained air volume flow and transmission losses enables to create an "effective heat transfer coefficient" due to transmission and infiltration. This summarizes both effects in one value and is particularly helpful for approximate calculations on energy efficiency.
Die Versorgung von Neubauten soll möglichst weitgehend unabhängig von fossilen Energieträgern erfolgen. Erneuerbare Energien spielen dafür eine gewichtige Rolle. Eine gute Möglichkeit, erneuerbare Energien ohne viel zusätzlichen Aufwand nutzbar zu machen, ist, bereits vorhandenen Komponenten im Gebäude zusätzliche Funktionen zu geben. Hier kann bspw. die Fassade oder das Dach solarthermisch aktiviert oder durch Fotovoltaikmodule ergänzt werden. Auch Tiefgründungen können neben der statischen Funktion noch eine geothermische Funktion zur Aufnahme oder Abgabe von Wärme erhalten. Neben der Erzeugung bietet sich auch für die Verteilung der Wärme oder Kälte im Gebäude die Integration in Bauteile an. Hier kann bspw. der Boden durch eine Fußbodenheizung oder die Decke durch Deckenstrahlplatten aktiviert werden.
Im Rahmen der Veröffentlichung wird auf die thermische Aktivierung von Stahlkomponenten eingegangen. Es wird eine Lösung vorgestellt, die vorgehängte hinterlüftete Stahlfassade (VHF) solarthermisch zu aktivieren. Außerdem werden zwei Möglichkeiten zur geothermischen Aktivierung von Tiefgründungen mittels Stahlpfählen gezeigt. Zuletzt wird ein System zur thermischen Aktivierung von Stahltrapezprofilen an der Decke erläutert, welches Wärme zuführen oder bei Bedarf abführen kann.
Robust estimators for free surface turbulence characterization: A stepped spillway application
(2020)
Robust estimators are parameters insensitive to the presence of outliers. However, they presume the shape of the variables’ probability density function. This study exemplifies the sensitivity of turbulent quantities to the use of classic and robust estimators and the presence of outliers in turbulent flow depth time series. A wide range of turbulence quantities was analysed based upon a stepped spillway case study, using flow depths sampled with Acoustic Displacement Meters as the flow variable of interest. The studied parameters include: the expected free surface level, the expected fluctuation intensity, the depth skewness, the autocorrelation timescales, the vertical velocity fluctuation intensity, the perturbations celerity and the one-dimensional free surface turbulence spectrum. Three levels of filtering were utilised prior to applying classic and robust estimators, showing that comparable robustness can be obtained either using classic estimators together with an intermediate filtering technique or using robust estimators instead, without any filtering technique.