Refine
Year of publication
- 2011 (328) (remove)
Institute
- Fachbereich Medizintechnik und Technomathematik (82)
- Fachbereich Elektrotechnik und Informationstechnik (40)
- INB - Institut für Nano- und Biotechnologien (37)
- Fachbereich Wirtschaftswissenschaften (34)
- IfB - Institut für Bioengineering (34)
- Fachbereich Energietechnik (29)
- Fachbereich Chemie und Biotechnologie (28)
- Fachbereich Bauingenieurwesen (24)
- Fachbereich Maschinenbau und Mechatronik (24)
- Fachbereich Luft- und Raumfahrttechnik (23)
Document Type
- Article (182)
- Conference Proceeding (76)
- Book (24)
- Part of a Book (21)
- Report (7)
- Patent (5)
- Conference: Meeting Abstract (3)
- Other (3)
- Doctoral Thesis (2)
- Part of a Periodical (2)
Keywords
- Aachen / Fachhochschule Aachen (3)
- Aachen University of Applied Sciences (3)
- Aktionskunst (3)
- FH Aachen (2)
- Illustration (2)
- Interaktive Kunst (2)
- Kommunikationsguerrilla (2)
- Pflanzenphysiologie (2)
- Pflanzenscanner (2)
- Stadtgestaltung (2)
In our case the double-side-method is used to minimize the complexity of a matrix-readout. Here the number of channels is reduced to 2√N̅. It is also possible to benefit from the method in a single pixel readout system. One signal can be used to measure position and energy of the event, the other one can be applied to a fast trigger-circuit at the same time. In a next step we will investigate timing behavior and electrical crosstalk of the circuit.
Purpose:
At 1.5 T, real-time MRI of joint movement has been shown to be feasible. However, 7 T, provides higher SNR and thus an improved potential for parallel imaging acceleration. The purpose of this work was to build an open, U-shaped eight-channel transmit/receive microstrip coil for 7 T MRI to enable high-resolution and real-time imaging of the moving ankle joint.
Methods:
A U-shaped eight-channel transmit/receive array for the human ankle was built.urn:x-wiley:00942405:mp3399:equation:mp3399-math-0001-parameters and urn:x-wiley:00942405:mp3399:equation:mp3399-math-0002-factor were measured. SAR calculations of different ankle postures were performed to ensure patient safety. Inhomogeneities in the transmit field consequent to the open design were compensated for by the use of static RF shimming. High-resolution and real-time imaging was performed in human volunteers.
Results:
The presented array showed good performance with regard to patient comfort and image quality. High acceleration factors of up to 4 are feasible without visible acceleration artifacts. Reasonable image homogeneity was achieved with RF shimming.
Conclusions:
Open, noncylindrical designs for transmit/receive coils are practical at 7 T and real-time imaging of the moving joint is feasible with the presented coil design.
Preclinical development of highly effective and safe DNA vaccines directed against HPV 16 E6 and E7
(2011)
Flight times to the heliopause using a combination of solar and radioisotope electric propulsion
(2011)
We investigate the interplanetary flight of a low-thrust space probe to the heliopause,located at a distance of about 200 AU from the Sun. Our goal was to reach this distance within the 25 years postulated by ESA for such a mission (which is less ambitious than the 15-year goal set by NASA). Contrary to solar sail concepts and combinations of allistic and electrically propelled flight legs, we have investigated whether the set flight time limit could also be kept with a combination of solar-electric propulsion and a second, RTG-powered upper stage. The used ion engine type was the RIT-22 for the first stage and the RIT-10 for the second stage. Trajectory optimization was carried out with the low-thrust optimization program InTrance, which implements the method of Evolutionary Neurocontrol,using Artificial Neural Networks for spacecraft steering and Evolutionary Algorithms to optimize the Neural Networks’ parameter set. Based on a parameter space study, in which the number of thrust units, the unit’s specific impulse, and the relative size of the solar power generator were varied, we have chosen one configuration as reference. The transfer time of this reference configuration was 29.6 years and the fastest one, which is technically
more challenging, still required 28.3 years. As all flight times of this parameter study were longer than 25 years, we further shortened the transfer time by applying a launcher-provided hyperbolic excess energy up to 49 km2/s2. The resulting minimal flight time for the reference configuration was then 27.8 years. The following, more precise optimization to a launch with the European Ariane 5 ECA rocket reduced the transfer time to 27.5 years. This is the fastest mission design of our study that is flexible enough to allow a launch every
year. The inclusion of a fly-by at Jupiter finally resulted in a flight time of 23.8 years,which is below the set transfer-time limit. However, compared to the 27.5-year transfer,this mission design has a significantly reduced launch window and mission flexibility if the
escape direction is restricted to the heliosphere’s “nose".
Möglichkeiten und Grenzen der Anwendbarkeit statisch nichtlinearer Verfahren nach DIN EN 1998-1
(2011)
This paper presents a novel numerical procedure for computing limit and shakedown loads of structures using a node-based smoothed FEM in combination with a primal–dual algorithm. An associated primal–dual form based on the von Mises yield criterion is adopted. The primal-dual algorithm together with a Newton-like iteration are then used to solve this associated primal–dual form to determine simultaneously both approximate upper and quasi-lower bounds of the plastic collapse limit and the shakedown limit. The present formulation uses only linear approximations and its implementation into finite element programs is quite simple. Several numerical examples are given to show the reliability, accuracy, and generality of the present formulation compared with other available methods.
Bio-feedstocks
(2011)
The proposed Den Haag Zuidwest district heating system of the city of The Hague consists of a deep doublet in a Jurassic sandstone layer that is designed for a production temperature of 75 °C and a reinjection temperature of 40 °C at a flow rate of 150 m3 h−1. The prediction of reservoir temperature and production behavior is crucial for success of the proposed geothermal doublet. This work presents the results of a study of the important geothermal and geohydrological issues for the doublet design. In the first phase of the study, the influences of the three-dimensional (3D) structures of anticlines and synclines on the temperature field were examined. A comprehensive petrophysical investigation was performed to build a large scale 3D-model of the reservoir. Several bottomhole temperatures (BHTs), as well as petrophysical logs were used to calibrate the model using thermal conductivity measurements on 50 samples from boreholes in different lithological units in the study area. Profiles and cross sections extracted from the calculated temperature field were used to study the temperature in the surrounding areas of the planned doublet. In the second phase of the project, a detailed 3D numerical reservoir model was set up, with the aim of predicting the evolution of the producer and injector temperatures, and the extent of the cooled area around the injector. The temperature model from the first phase provided the boundary conditions for the reservoir model. Hydraulic parameters for the target horizons, such as porosity and permeability, were taken from data available from the nearby exploration wells. The simulation results are encouraging as no significant thermal breakthrough is predicted. For the originally planned location of the producer, the extracted water temperature is predicted to be around 79 °C, with an almost negligible cooling in the first 50 years of production. When the producer is located shallower parts of the reservoir, the yield water temperatures is lower, starting at ≈76 °C and decreasing to ≈74 °C after 50 years of operation. This comparatively larger decrease in temperature with time is caused by the structural feature of the reservoir, namely a higher dip causes the cooler water to easily move downward. In view of the poor reservoir data, the reservoir simulation model is constructed to allow iterative updates using data assimilation during planned drilling, testing, and production phases. Measurements during an 8 h pumping test carried out in late 2010 suggest that a flow rate of 150 m3 h−1 is achievable. Fluid temperatures of 76.5 °C were measured, which is very close to the predicted value.
Air-pulse corneal applanation signal curve parameters for the characterisation of keratoconus
(2011)
The magnetic forces of fringe magnetic fields of MR systems on ferromagnetic components can impose a severe patient, occupational health and safety hazard. MRI accidents are listed as number 9 of the top 10 risks in modern medicine. With the advent of ultrahigh field MR systems including passively shielded magnet versions, this risk, commonly known as the missile or projectile effect is even more pronounced. A strategy employing magnetic field sensors which can be attached to ferromagnetic objects that are commonly used in a clinical environment is conceptually appealing for the pursuit of reducing the risk of ferromagnetic projectile accidents.
Objective
The purpose of this study is to (i) design a small and mobile Magnetic field ALert SEnsor (MALSE), (ii) to carefully evaluate its sensors to their consistency of activation/deactivation and sensitivity to magnetic fields, and (iii) to demonstrate the applicability of MALSE in 1.5 T, 3.0 T and 7.0 T MR fringe field environments.
Methods
MALSE comprises a set of reed sensors, which activate in response to their exposure to a magnetic field. The activation/deactivation of reed sensors was examined by moving them in/out of the fringe field generated by 7TMR.
Results
The consistency with which individual reed sensors would activate at the same field strength was found to be 100% for the setup used. All of the reed switches investigated required a substantial drop in ambient magnetic field strength before they deactivated.
Conclusions
MALSE is a simple concept for alerting MRI staff to a ferromagnetic object being brought into fringe magnetic fields which exceeds MALSEs activation magnetic field. MALSE can easily be attached to ferromagnetic objects within the vicinity of a scanner, thus creating a barrier for hazardous situations induced by ferromagnetic parts which should not enter the vicinity of an MR-system to occur.
An Interstellar – Heliopause mission using a combination of solar/radioisotope electric propulsion
(2011)
There is common agreement within the scientific community that in order to understand our local galactic environment it will be necessary to send a spacecraft into the region beyond the solar wind termination shock. Considering distances of 200 AU for a new mission, one needs a spacecraft travelling at a speed of close to 10 AU/yr in order to keep the mission duration in the range of less than 25 yrs, a transfer time postulated by ESA.Two propulsion options for the mission have been proposed and discussed so far: the solar sail propulsion and the ballistic/radioisotope electric propulsion. As a further alternative, we here investigate a combination of solar-electric propulsion and radioisotope-electric propulsion. The solar-electric propulsion stage consists of six 22 cm diameter “RIT-22”ion thrusters working with a high specific impulse of 7377 s corresponding to a positive grid voltage of 5 kV. Solar power of 53 kW BOM is provided by a light-weight solar array. The REP-stage consists of four space-proven 10 cm diameter “RIT-10” ion thrusters that will be operating one after the other for 9 yrs in total. Four advanced radioisotope generators provide 648 W at BOM. The scientific instrument package is oriented at earlier studies. For its mass and electric power requirement 35 kg and 35 W are assessed, respectively. Optimized trajectory calculations, treated in a separate contribution, are based on our “InTrance” method.The program yields a burn out of the REP stage in a distance of 79.6 AU for a usage of 154 kg of Xe propellant. With a C3 = 45,1 (km/s)2 a heliocentric probe velocity of 10 AU/yr is reached at this distance, provided a close Jupiter gravity assist adds a velocity increment of 2.7 AU/yr. A transfer time of 23.8 yrs results for this scenario requiring about 450 kg Xe for the SEP stage, jettisoned at 3 AU. We interpret the SEP/REP propulsion as a competing alternative to solar sail and ballistic/REP propulsion. Omiting a Jupiter fly-by even allows more launch flexibility, leaving the mission duration in the range of the ESA specification.
Originalausgabe: Orthopädische Praxis Jg. 47. 2011 H. 11; S. 536-543. Mit freundlicher Genehmigung des Verlags Zusammenfassung: Auf der Basis von Patientenabfragen mittels Fragebogen zum Schmerzempfinden und zur Einschränkung bei Aktivitäten des alltäglichen Lebens wird die Langzeitwirkung der MBST® KernspinResonanz-Therapie bei Gonarthrose untersucht. An der Studie nahmen 39 Patienten teil, bei denen die Therapie bis zu vier Jahre zurückliegt. Neben einer Gesamtbetrachtung wird der Erfolg auch in Abhängigkeit von Alter, Geschlecht und sportlicher Aktivität analysiert. Insgesamt weist die Studie auf eine anhaltende Verbesserung des Gesundheitszustands mit zum Teil deutlicher Schmerzlinderung auch noch nach vier Jahren hin, jedoch mit einer leichten Schmerzzunahme gegen Ende des Untersuchungszeitraums von vier Jahren. Eine tendenziell positivere Wirkung bei Frauen, älteren Menschen oder auch sportlich nicht-aktiven Patienten lässt auf eine mögliche Beeinflussung des Erfolgs der Therapie durch (Über-)Belastung im Alltag schließen. Ein zusätzlich positiver Effekt der Therapie auf die Knochendichte ist ebenfalls denkbar, dies bleibt jedoch offen.