Refine
Year of publication
Institute
- Fachbereich Bauingenieurwesen (139) (remove)
Document Type
- Conference Proceeding (139) (remove)
Keywords
- Kanalisation (4)
- Aachen / Fachhochschule Aachen / Fachbereich Bauingenieurwesen (3)
- Absolvententreffen (3)
- Alfha.net (3)
- Alumni (3)
- Fließgewässer (3)
- Geodatenbank (3)
- Geodatenhaltung (3)
- Geoinformationen (3)
- Geoinformationssystem (3)
Is part of the Bibliography
- no (139)
Dr.-Ing. Oliver Stoschek [u.a.] DHI Wasser und Umwelt GmbH, Syke. 14 S. (S. 45-58). Beitrag zum 2. Aachener Softwaretag in der Wasserwirtschaft <2, 2009, Aachen> Ökologische Modelle zur Berechnung der Temperaturveränderung und den Einfluss von Kühlwasser auf die Wassertemperatur der Elbe. Die vorgelegte Arbeit wurde beauftragt und unterstützt von der ARGE Elbe im Zuge der Neuauflage des Wärmelastplans Elbe.
Die ökologische Umgestaltung der Dhünn in Leverkusen – Ein Beispiel für die praktische Planung
(2009)
Dipl.-Ing. (FH) Dieter Stein M.Sc (Environmental Engineering) - Landschaftsarchitekt AKNW, Grevenbroich. 14 Seiten ( S. 78-91). Beitrag zum 2. Aachener Softwaretag in der Wasserwirtschaft <2, 2009, Aachen>. Zusammenfassung [des Autors] Unter Berücksichtigung vorhandener örtlicher Gegebenheiten und technischer Einrichtungen (wie z.B. Verkehrstrassen, Versorgungsleitungen, Einlaufbauwerke etc.) hat die Dhünn innerhalb der Deiche mehr Bewegungsfreiheit erhalten. Der Hochwasserschutz bleibt dabei weiterhin gewährleistet. Die Gehölzstrukturen im Uferbereich wurden weitgehend erhalten. Dort, wo die Bauarbeiten eine Entfernung von Gehölzen erforderlich machten, wurden die Flächen bewusst einer eigenständigen Entwicklung überlassen. In diesen Bereichen werden sich im Laufe der Zeit von selbst neue Pflanzen und Gehölze ansiedeln. Mit der naturnahen Umgestaltung der Dhünn als "Starthilfe" kann die Natur die weitere Entwicklung übernehmen: Tier- und Pflanzenarten können sich das ehemals kanalartig ausgebaute Gewässer "zurückerobern", Fische und Kleintiere finden Nahrung und Ruheplätze. Für die Menschen entsteht ein wertvoller Erholungsraum mitten in der Stadt. Trotz zahlreicher Akteure und erheblicher Restriktionen konnte das Projekt in relativ kurzer Zeit realisiert werden. Dem Wupperverband (Untere Lichtenplatzer Str. 100; 42289 Wuppertal) und hier vor allem den Projektleitern Herrn Arnim Lützenberger und Herrn Andreas Oberborbeck sei an dieser Stelle besonders für eine hervorragende Zusammenarbeit gedankt.
Abstract des Beitrags zum 1. Aachener Softwaretag in der Wasserwirtschaft <1, 2007, Aachen> 1 S. : Bereits seit Jahrzehnten werden verschiedenste Injektions-Verfahren, welche teilweise aus den Vereinigten Staaten lizenziert wurden, in Deutschland angewendet, um Abwasserkanäle zu ertüchtigen. Die Resultate sind teilweise sehr umstritten, nicht zuletzt aufgrund unzureichender Materialeigenschaften in den Anfangsjahren der Anwendung. Viele Methoden sind darüber völlig aus dem Gebrauch gekommen und haben manchmal das ganze Verfahrensprinzip in Verruf gebracht. Mittlerweile wurden sowohl Verfahren als auch Materialien weiterentwickelt und sind nun in der Lage auch den aktuellen strengen und praxisnahen Testverfahren mittels Säuleninjektionsversuchen zur Beurteilung Umweltverträglichkeit zu genügen. Es wird ein kurzer Überblick über die derzeit am Markt befindlichen/üblichen Regelwerke, Verfahren und Materialien gegeben und die Grenzen und Möglichkeiten im Rahmen der Kanalsanierung aufgezeigt.
The worldwide Corona pandemic has severely restricted student projects in the higher semesters of engineering courses. In order not to delay the graduation, a new concept had to be developed for projects under lockdown conditions. Therefore, unused rooms at the university should be digitally recorded in order to develop a new usage concept as laboratory rooms. An inventory of the actual state of the rooms was done first by taking photos and listing up all flaws and peculiarities. After that, a digital site measuring was done with a 360° laser scanner and these recorded scans were linked to a coherent point cloud and transferred to a software for planning technical building services and supporting Building Information Modelling (BIM). In order to better illustrate the difference between the actual and target state, two virtual reality models were created for realistic demonstration. During the project, the students had to go through the entire digital planning phases. Technical specifications had to be complied with, as well as documentation, time planning and cost estimate. This project turned out to be an excellent alternative to on-site practical training under lockdown conditions and increased the students’ motivation to deal with complex technical questions.
In the context of the Corona pandemic and its impact on teaching like digital lectures and exercises a new concept especially for freshmen in demanding courses of Smart Building Engineering became necessary. As there were hardly any face-to-face events at the university, the new teaching concept should enable a good start into engineering studies under pandemic conditions anyway and should also replace the written exam at the end. The students should become active themselves in small teams instead of listening passively to a lecture broadcast online with almost no personal contact. For this purpose, a role play was developed in which the freshmen had to work out a complete solution to the realistic problem of designing, construction planning and implementing a small guesthouse. Each student of the team had to take a certain role like architect, site manager, BIM-manager, electrician and the technitian for HVAC installations. Technical specifications must be complied with, as well as documentation, time planning and cost estimate. The final project folder had to contain technical documents like circuit diagrams for electrical components, circuit diagrams for water and heating, design calculations and components lists. On the other hand construction schedule, construction implementation plan, documentation of the construction progress and minutes of meetings between the various trades had to be submitted as well. In addition to the project folder, a model of the construction project must also be created either as a handmade model or as a digital 3D-model using Computer-aided design (CAD) software. The first steps in the field of Building information modelling (BIM) had also been taken by creating a digital model of the building showing the current planning status in real time as a digital twin. This project turned out to be an excellent training of important student competencies like teamwork, communication skills, and self -organisation and also increased motivation to work on complex technical questions. The aim of giving the student a first impression on the challenges and solutions in building projects with many different technical trades and their points of view was very well achieved and should be continued in the future.
Urban farming is an innovative and sustainable way of food production and is becoming more and more important in smart city and quarter concepts. It also enables the production of certain foods in places where they usually dare not produced, such as production of fish or shrimps in large cities far away from the coast. Unfortunately, it is not always possible to show students such concepts and systems in real life as part of courses: visits of such industry plants are sometimes not possible because of distance or are permitted by the operator for hygienic reasons. In order to give the students the opportunity of getting into contact with such an urban farming system and its complex operation, an industrial urban farming plant was set up on a significantly smaller scale. Therefore, all needed technical components like water aeriation, biological and mechanical filtration or water circulation have been replaced either by aquarium components or by self-designed parts also using a 3D-printer. Students from different courses like mechanical engineering, smart building engineering, biology, electrical engineering, automation technology and civil engineering were involved in this project. This “miniature industrial plant” was also able to start operation and has now been running for two years successfully. Due to Corona pandemic, home office and remote online lectures, the automation of this miniature plant should be brought to a higher level in future for providing a good control over the system and water quality remotely. The aim of giving the student a chance to get to know the operation of an urban farming plant was very well achieved and the students had lots of fun in “playing” and learning with it in a realistic way.
Dr.-Ing. Raju M. Rohde , Dorsch Consult Wasser und Umwelt GmbH, München mit 32 Folien (S. 103-134). Beitrag zum 1. Aachener Softwaretag in der Wasserwirtschaft <1, 2007, Aachen>. Das System BaSYS.L.E.O. Ganglinien-Volumen-Methode Hydrodynamische Kanalnetzberechnung Hydraulische Objekte Hydrodynamische Schmutzfrachtberechnung
Energiebilanzen und -potenziale von Abwasseranlagen : Vorstellung neuer Untersuchungsvorhaben in NRW
(2010)
In: Alfha.net / Sektion Bauingenieurwesen: 1. [Erster] Erfahrungsaustausch : Absolventen des Fachbereichs Bauingenieurwesens berichten. 13. Oktober 2006. S. 19-20. Zusammenfassung des Vortrags: Prozessanalyse und Revision beim Umbau des Flughafens Hamburg, Beratung von Bauunternehmen, Sachverständigentätigkeit
Dipl.-Ing. Stefan Overkamp - GISWORKS GbR, Velbert. 11 S. (S. 7-17). Beitrag zum 2. Aachener Softwaretag in der Wasserwirtschaft <2, 2009, Aachen> Aus der Gliederung: 1 Geoinformationssysteme 2 Anforderungen an eine kommunale Geodateninfrastruktur (GDI) 3 Komponenten einer GDI 3.1 Geodatenmanagement 3.2 Geodatenhaltung 3.3 High-End-GIS 3.4 intraGIS 4 GISWORKS 5 Weiterführende Informationen
Even though BIM (Building Information Modelling) is successfully implemented in most of the world, it is still in the early stages in Germany, since the stakeholders are sceptical of its reliability and efficiency. The purpose of this paper is to analyse the opportunities and obstacles to implementing BIM for prefabrication. Among all other advantages of BIM, prefabrication is chosen for this paper because it plays a vital role in creating an impact on the time and cost factors of a construction project. The project stakeholders and participants can explicitly observe the positive impact of prefabrication, which enables the breakthrough of the scepticism factor among the small-scale construction companies. The analysis consists of the development of a process workflow for implementing prefabrication in building construction followed by a practical approach, which was executed with two case studies. It was planned in such a way that, the first case study gives a first-hand experience for the workers at the site on the BIM model so that they can make much use of the created BIM model, which is a better representation compared to the traditional 2D plan. The main aim of the first case study is to create a belief in the implementation of BIM Models, which was succeeded by the execution of offshore prefabrication in the second case study. Based on the case studies, the time analysis was made and it is inferred that the implementation of BIM for prefabrication can reduce construction time, ensures minimal wastes, better accuracy, less problem-solving at the construction site. It was observed that this process requires more planning time, better communication between different disciplines, which was the major obstacle for successful implementation. This paper was carried out from the perspective of small and medium-sized mechanical contracting companies for the private building sector in Germany.
The replacement of existing spillway crests or gates with labyrinth weirs is a proven techno-economical means to increase the discharge capacity when rehabilitating existing structures. However, additional information is needed regarding energy dissipation of such weirs, since due to the folded weir crest, a three-dimensional flow field is generated, yielding more complex overflow and energy dissipation processes. In this study, CFD simulations of labyrinth weirs were conducted 1) to analyze the discharge coefficients for different discharges to compare the Cd values to literature data and 2) to analyze and improve energy dissipation downstream of the structure. All tests were performed for a structure at laboratory scale with a height of approx. P = 30.5 cm, a ratio of the total crest length to the total width of 4.7, a sidewall angle of 10° and a quarter-round weir crest shape. Tested headwater ratios were 0.089 ≤ HT/P ≤ 0.817. For numerical simulations, FLOW-3D Hydro was employed, solving the RANS equations with use of finite-volume method and RNG k-ε turbulence closure. In terms of discharge capacity, results were compared to data from physical model tests performed at the Utah Water Research Laboratory (Utah State University), emphasizing higher discharge coefficients from CFD than from the physical model. For upstream heads, some discrepancy in the range of ± 1 cm between literature, CFD and physical model tests was identified with a discussion regarding differences included in the manuscript. For downstream energy dissipation, variable tailwater depths were considered to analyze the formation and sweep-out of a hydraulic jump. It was found that even for high discharges, relatively low downstream Froude numbers were obtained due to high energy dissipation involved by the three-dimensional flow between the sidewalls. The effects of some additional energy dissipation devices, e.g. baffle blocks or end sills, were also analyzed. End sills were found to be non-effective. However, baffle blocks with different locations may improve energy dissipation downstream of labyrinth weirs.
In: Alfha.net / Sektion Bauingenieurwesen: 1. [Erster] Erfahrungsaustausch : Absolventen des Fachbereichs Bauingenieurwesens berichten. 13. Oktober 2006. S. 16-17 Der Umbau des Aachener Buschtunnels im Rahmen des europäischen Hochgeschwindigkeitsschienennetzes wird im sogenannten "Neuen Österreichischen Tunnelbauverfahren (NOeT)", also ein Ausbau in Kalotte, Strosse und Sohle durchgeführt.