Refine
Year of publication
Institute
- Fachbereich Elektrotechnik und Informationstechnik (302)
- Fachbereich Energietechnik (259)
- Fachbereich Medizintechnik und Technomathematik (241)
- Fachbereich Luft- und Raumfahrttechnik (208)
- Fachbereich Maschinenbau und Mechatronik (207)
- Solar-Institut Jülich (167)
- IfB - Institut für Bioengineering (152)
- Fachbereich Bauingenieurwesen (139)
- Fachbereich Wirtschaftswissenschaften (69)
- ECSM European Center for Sustainable Mobility (59)
Language
- English (1162)
- German (475)
- Multiple languages (1)
- Spanish (1)
Document Type
- Conference Proceeding (1639) (remove)
Keywords
- Biosensor (25)
- Blitzschutz (15)
- CAD (11)
- Finite-Elemente-Methode (11)
- civil engineering (11)
- Bauingenieurwesen (10)
- Lightning protection (9)
- Einspielen <Werkstoff> (6)
- Telekommunikationsmarkt (6)
- shakedown analysis (6)
This paper describes the results and methods used during the 8th Global Trajectory Optimization Competition (GTOC) of the DLR team. Trajectory optimization is crucial for most of the space missions and usually can be formulated as a global optimization problem. A lot of research has been done to different type of mission problems. The most demanding ones are low thrust transfers with e.g. gravity assist sequences. In that case the optimal control problem is combined with an integer problem. In most of the GTOCs we apply a filtering of the problem based on domain knowledge.
The planned coal phase-out in Germany by 2038 will lead to the dismantling of power plants with a total capacity of approx. 30 GW. A possible further use of these assets is the conversion of the power plants to thermal storage power plants; the use of these power plants on the day-ahead market is considerably limited by their technical parameters. In this paper, the influence of the technical boundary conditions on the operating times of these storage facilities is presented. For this purpose, the storage power plants were described as an MILP problem and two price curves, one from 2015 with a relatively low renewable penetration (33 %) and one from 2020 with a high renewable energy penetration (51 %) are compared. The operating times were examined as a function of the technical parameters and the critical influencing factors were investigated. The thermal storage power plant operation duration and the energy shifted with the price curve of 2020
increases by more than 25 % compared to 2015.