Refine
Year of publication
Document Type
- Article (324)
- Book (117)
- Conference Proceeding (101)
- Part of a Book (86)
- Report (17)
- Doctoral Thesis (6)
- Contribution to a Periodical (2)
- Patent (2)
- Working Paper (2)
- Poster (1)
Has Fulltext
- no (658) (remove)
Keywords
- metal structure (4)
- steel (4)
- industrial research (3)
- iron and steel industry (3)
- materials technology (3)
- research report (3)
- Haustechnik (2)
- Heizung (2)
- Klimatechnik (2)
- Lüftung (2)
- Lüftungstechnik (2)
- Stickstoffoxide (2)
- building industry (2)
- building information modelling (2)
- building materials (2)
- energy efficiency (2)
- research project (2)
- resistance of materials (2)
- 20 fossil-fueled power plants (1)
- 3D printing (1)
Institute
- Fachbereich Bauingenieurwesen (658) (remove)
Durch die Einführung von Building Information Modeling (BIM) sowohl projektspezifisch als auch in ganze Unternehmungen hat die Baubranche einen weitreichenden Veränderungsprozess angestoßen.
Building Information Modeling kann als eine Methode angesehen werden, um die Informationsasymmetrien zwischen den Projektbeteiligten so gering wie möglich zu halten.
Kein Bauvorhaben sollte realisiert werden, ohne dass es auf einer vertraglichen Grundlage zwischen Auftraggeber und Auftragnehmer fußt. Diese vertragliche Grundlage zu kennen ist essenziell, um dementsprechend handeln zu können. Denn nur wer seine eigenen Rechte und auch Pflichten kennt, kann sich auf diese berufen.
Schalung und Gerüste
(2024)
Systemschalungen und Systemgerüste haben den Baustellenbetrieb in vielen Bereichen sehr vereinfacht. Dennoch sind Kenntnisse in diesen Feldern für eine erfolgreiche und effektive Bauleitung unverzichtbar. In diesem Kapitel werden Hinweise und Empfehlungen für die Bemessung und Einsatz von Schalungen, Trag- und Arbeitsgerüsten für den Baustellenbetrieb gegeben.
Kalkulation
(2024)
Das Kapitel behandelt die Kosten- und Preisermittlung, die Kostenvorgabe und Kostenkontrolle.
Der Angebotspreis wird aufgeschlüsselt in die Einzelkosten der Teilleistungen, die Baustellengemeinkosten, die Allgemeinen Geschäftskosten und einen Zuschlag für Wagnis und Gewinn. Auf der Basis der Angebotskalkulation werden die Vorgaben für die Kostenkontrolle entwickelt.
Baumaschinen
(2024)
Ein neues tragendes, lagenweise aufgebautes Holzbau-Wandsystem und seine ökonomische und statische Entwicklung werden vorgestellt. Randbedingungen wie Nachhaltigkeit, Ressourceneffizienz und eine beanspruchungsadaptive Konstruktionsweise sind für diese innovative Bauteilentwicklung von zentraler Bedeutung. Eine wesentliche Herausforderung ist die Herstellung der Verbindung der Lagen untereinander zu einem bauphysikalisch und statisch leistungsfähigen Wandsystem. Die Tragfähigkeit und Steifigkeit verschiedener Verbindungsvarianten wurden ebenso wie die Eigenschaften der Wandelemente analytisch, numerisch und experimentell untersucht.
Deammonification for nitrogen removal in municipal wastewater in temperate and cold climate zones is currently limited to the side stream of municipal wastewater treatment plants (MWWTP). This study developed a conceptual model of a mainstream deammonification plant, designed for 30,000 P.E., considering possible solutions corresponding to the challenging mainstream conditions in Germany. In addition, the energy-saving potential, nitrogen elimination performance and construction-related costs of mainstream deammonification were compared to a conventional plant model, having a single-stage activated sludge process with upstream denitrification. The results revealed that an additional treatment step by combining chemical precipitation and ultra-fine screening is advantageous prior the mainstream deammonification. Hereby chemical oxygen demand (COD) can be reduced by 80% so that the COD:N ratio can be reduced from 12 to 2.5. Laboratory experiments testing mainstream conditions of temperature (8–20°C), pH (6–9) and COD:N ratio (1–6) showed an achievable volumetric nitrogen removal rate (VNRR) of at least 50 gN/(m3∙d) for various deammonifying sludges from side stream deammonification systems in the state of North Rhine-Westphalia, Germany, where m3 denotes reactor volume. Assuming a retained Norganic content of 0.0035 kgNorg./(P.E.∙d) from the daily loads of N at carbon removal stage and a VNRR of 50 gN/(m3∙d) under mainstream conditions, a resident-specific reactor volume of 0.115 m3/(P.E.) is required for mainstream deammonification. This is in the same order of magnitude as the conventional activated sludge process, i.e., 0.173 m3/(P.E.) for an MWWTP of size class of 4. The conventional plant model yielded a total specific electricity demand of 35 kWh/(P.E.∙a) for the operation of the whole MWWTP and an energy recovery potential of 15.8 kWh/(P.E.∙a) through anaerobic digestion. In contrast, the developed mainstream deammonification model plant would require only a 21.5 kWh/(P.E.∙a) energy demand and result in 24 kWh/(P.E.∙a) energy recovery potential, enabling the mainstream deammonification model plant to be self-sufficient. The retrofitting costs for the implementation of mainstream deammonification in existing conventional MWWTPs are nearly negligible as the existing units like activated sludge reactors, aerators and monitoring technology are reusable. However, the mainstream deammonification must meet the performance requirement of VNRR of about 50 gN/(m3∙d) in this case.