Refine
Institute
Has Fulltext
- no (5) (remove)
Document Type
- Conference Proceeding (3)
- Article (1)
- Part of a Book (1)
Keywords
- storage dispatch (1)
- storage optimisation (1)
- thermal storage (1)
Is part of the Bibliography
- no (5)
The planned coal phase-out in Germany by 2038 will lead to the dismantling of power plants with a total capacity of approx. 30 GW. A possible further use of these assets is the conversion of the power plants to thermal storage power plants; the use of these power plants on the day-ahead market is considerably limited by their technical parameters. In this paper, the influence of the technical boundary conditions on the operating times of these storage facilities is presented. For this purpose, the storage power plants were described as an MILP problem and two price curves, one from 2015 with a relatively low renewable penetration (33 %) and one from 2020 with a high renewable energy penetration (51 %) are compared. The operating times were examined as a function of the technical parameters and the critical influencing factors were investigated. The thermal storage power plant operation duration and the energy shifted with the price curve of 2020
increases by more than 25 % compared to 2015.
Stand 01.01.2022 sind in Deutschland 618.460 elektrisch angetriebene KFZ zugelassen. Insgesamt sind derzeit 48.540.878 KFZ zugelassen, was einer Elektromobilitätsquote von ca. 1,2 % entspricht. Derzeit werden Elektromobile über Ladestationen oder Steckdosen mit dem Stromnetz verbunden und üblicherweise mit der vollen Ladekapazität des Anschlusses aufgeladen, bis das Batteriemanagementsystem des Fahrzeugs abhängig vom Ladezustand der Batterie die Ladeleistung reduziert.
Due to the Renewable Energy Act, in Germany it is planned to increase the amount of renewable energy carriers up to 60%. One of the main problems is the fluctuating supply of wind and solar energy. Here biogas plants provide a solution, because a demand-driven supply is possible. Before running such a plant, it is necessary to simulate and optimize the process. This paper provides a new model of a biogas plant, which is as accurate as the standard ADM1 model. The advantage compared to ADM1 is that it is based on only four parameters compared to 28. Applying this model, an optimization was installed, which allows a demand-driven supply by biogas plants. Finally the results are confirmed by several experiments and measurements with a real test plant.