Refine
Year of publication
Institute
Document Type
- Article (33)
- Conference Proceeding (27)
- Book (3)
- Part of a Book (2)
- Report (2)
Keywords
Using optimization to design a renewable energy system has become a computationally demanding task as the high temporal fluctuations of demand and supply arise within the considered time series. The aggregation of typical operation periods has become a popular method to reduce effort. These operation periods are modelled independently and cannot interact in most cases. Consequently, seasonal storage is not reproducible. This inability can lead to a significant error, especially for energy systems with a high share of fluctuating renewable energy. The previous paper, “Time series aggregation for energy system design: Modeling seasonal storage”, has developed a seasonal storage model to address this issue. Simultaneously, the paper “Optimal design of multi-energy systems with seasonal storage” has developed a different approach. This paper aims to review these models and extend the first model. The extension is a mathematical reformulation to decrease the number of variables and constraints. Furthermore, it aims to reduce the calculation time while achieving the same results.
The Passivhaus building standard is a concept developed for the realization of energy-efficient and economical buildings with a simultaneous high utilization comfort under European climate conditions. Major elements of the Passivhaus concept are a high thermal insulation of the external walls, the use of heat and/or solar shading glazing as well as an airtight building envelope in combination with energy-efficient technical building installations and heating or cooling generators, such as an efficient energy-recovery in the building air-conditioning. The objective of this research project is the inquiry to determine the parameters or constraints under which the Passivhaus concept can be implemented under the arid climate conditions in the Arabian Peninsula to achieve an energy-efficient and economical building with high utilization comfort. In cooperation between the Qatar Green Building Council (QGBC), Barwa Real Estate (BRE) and Kahramaa the first Passivhaus was constructed in Qatar and on the Arabian Peninsula in 2013. The Solar-Institut Jülich of Aachen University of Applied Science supports the Qatar Green Building Council with a dynamic building and equipment simulation of the Passivhaus and the neighbouring reference building. This includes simulation studies with different component configurations for the building envelope and different control strategies for heating or cooling systems as well as the air conditioning of buildings to find an energetic-economical optimum. Part of these analyses is the evaluation of the energy efficiency of the used energy recovery system in the Passivhaus air-conditioning and identification of possible energy-saving effects by the use of a bypass function integrated in the heat exchanger. In this way it is expected that on an annual basis the complete electricity demand of the building can be covered by the roof-integrated PV generator.
The Solar-Institute Jülich (SIJ) has initiated the construction of the first and only German solar tower power plant and is now involved in the accompanying research. The power plant for experimental and demonstration purposes in the town of Jülich started supplying electric energy in the beginning of 2008. The central receiver plant features as central innovation an open volumetric receiver, consisting of porous ceramic elements that simultaneously absorb the concentrated sunlight and transfer the heat to ambient air passing through the pores so that an average temperature of 680°C is reached. The subsequent steam cycle generates up to 1.5 MWe. A main field of research at the SIJ is the optimization of the absorber structures. To analyze the capability of new absorber specimens a special test facility was developed and set up in the laboratory. A high-performance near-infrared radiator offers for single test samples a variable and repeatable beam with a power of up to 320 kW/m² peak. The temperatures achieved on the absorber surface can reach more than 1000°C. To suck ambient air through the open absorber - like on the tower - it is mounted on a special blower system. An overview about the test facility and some recent results will be presented.
The cost of solar tower power plants is dominated by the heliostat field making up roughly 50% of investment costs. Classical heliostat design is dominated by mirrors brought into position by steel structures and drives that guarantee high accuracies under wind loads and thermal stress situations. A large fraction of costs is caused by the stiffness requirements of the steel structure, typically resulting in ~ 20 kg/m² steel per mirror area. The typical cost figure of heliostats (figure mentioned by Solucar at Solar Paces Conference, Seville, 2006) is currently in the area of 150 €/m² caused by the increasing price of the necessary raw materials. An interesting option to reduce costs lies in a heliostat design where all moving parts are protected from wind loads. In this way, drives and mechanical layout may be kept less robust, thereby reducing material input and costs. In order to keep the heliostat at an appropriate size, small mirrors (around 10x10 cm²) have to be used, which are placed in a box with a transparent cover. Innovative drive systems are developed in order to obtain a cost-effective design. A 0,5x0,5 m² demonstration unit will be constructed. Tests of the unit are carried out with a high-precision artificial sun unit that imitates the sun’s path with an accuracy of less than 0.5 mrad and creates a beam of parallel light with a divergence of less than 4 mrad.
Simulationsprogramme in der Solarenergie-Ausbildung / Blum, K. ; Göttsche, J. ; Schumacher, J.
(1994)
Large scale central receiver systems typically deploy between thousands to more than a hundred thousand heliostats. During solar operation, each heliostat is aligned individually in such a way that the overall surface normal bisects the angle between the sun’s position and the aim point coordinate on the receiver. Due to various tracking error sources, achieving accurate alignment ≤1 mrad for all the heliostats with respect to the aim points on the receiver without a calibration system can be regarded as unrealistic. Therefore, a calibration system is necessary not only to improve the aiming accuracy for achieving desired flux distributions but also to reduce or eliminate spillage. An overview of current larger-scale central receiver systems (CRS), tracking error sources and the basic requirements of an ideal calibration system is presented. Leading up to the main topic, a description of general and specific terms on the topics heliostat calibration and tracking control clarifies the terminology used in this work. Various figures illustrate the signal flows along various typical components as well as the corresponding monitoring or measuring devices that indicate or measure along the signal (or effect) chain. The numerous calibration systems are described in detail and classified in groups. Two tables allow the juxtaposition of the calibration methods for a better comparison. In an assessment, the advantages and disadvantages of individual calibration methods are presented.