Refine
Year of publication
- 2023 (3)
- 2022 (6)
- 2021 (10)
- 2020 (7)
- 2019 (8)
- 2018 (8)
- 2017 (7)
- 2016 (13)
- 2015 (10)
- 2014 (4)
- 2013 (9)
- 2012 (9)
- 2011 (5)
- 2010 (11)
- 2009 (6)
- 2008 (5)
- 2007 (4)
- 2006 (3)
- 2004 (2)
- 2003 (4)
- 2002 (1)
- 1999 (4)
- 1998 (1)
- 1997 (1)
- 1995 (1)
- 1994 (2)
- 1993 (4)
- 1992 (3)
- 1990 (1)
- 1989 (1)
- 1988 (1)
- 1987 (1)
- 1985 (1)
- 1984 (1)
Institute
- Fachbereich Bauingenieurwesen (157) (remove)
Language
- English (157) (remove)
Document Type
- Conference Proceeding (75)
- Article (69)
- Report (6)
- Part of a Book (4)
- Book (1)
- Conference Poster (1)
- Habilitation (1)
Keywords
- metal structure (4)
- steel (4)
- industrial research (3)
- iron and steel industry (3)
- materials technology (3)
- research report (3)
- building industry (2)
- building information modelling (2)
- building materials (2)
- energy efficiency (2)
Since several decades, dam-break waves have been of main research interest. Mathematical approaches have been developed by analytical, physical and numerical models within the past 120 years. During the past 10 years, the number of research investigations has increased due to improved measurement techniques as well as significantly increased computer memories and performances. In this context, the present research deals with the initial stage of two-dimensional dam-break waves by comparing physical and numerical model results as well as analytical approaches. High-speed images and resulting particle image velocimetry calculations are thereby compared with the numerical volume-of-fluid (VOF) method, included in the commercial code FLOW-3D. Wave profiles and drag forces on placed obstacles are analysed in detail. Generally, a good agreement between the laboratory and VOF results is found.
Even though BIM (Building Information Modelling) is successfully implemented in most of the world, it is still in the early stages in Germany, since the stakeholders are sceptical of its reliability and efficiency. The purpose of this paper is to analyse the opportunities and obstacles to implementing BIM for prefabrication. Among all other advantages of BIM, prefabrication is chosen for this paper because it plays a vital role in creating an impact on the time and cost factors of a construction project. The project stakeholders and participants can explicitly observe the positive impact of prefabrication, which enables the breakthrough of the scepticism factor among the small-scale construction companies. The analysis consists of the development of a process workflow for implementing prefabrication in building construction followed by a practical approach, which was executed with two case studies. It was planned in such a way that, the first case study gives a first-hand experience for the workers at the site on the BIM model so that they can make much use of the created BIM model, which is a better representation compared to the traditional 2D plan. The main aim of the first case study is to create a belief in the implementation of BIM Models, which was succeeded by the execution of offshore prefabrication in the second case study. Based on the case studies, the time analysis was made and it is inferred that the implementation of BIM for prefabrication can reduce construction time, ensures minimal wastes, better accuracy, less problem-solving at the construction site. It was observed that this process requires more planning time, better communication between different disciplines, which was the major obstacle for successful implementation. This paper was carried out from the perspective of small and medium-sized mechanical contracting companies for the private building sector in Germany.