Article
Refine
Year of publication
- 2024 (3)
- 2023 (3)
- 2022 (5)
- 2021 (6)
- 2020 (10)
- 2019 (9)
- 2018 (13)
- 2017 (8)
- 2016 (14)
- 2015 (8)
- 2014 (13)
- 2013 (13)
- 2012 (16)
- 2011 (25)
- 2010 (21)
- 2009 (23)
- 2008 (29)
- 2007 (22)
- 2006 (23)
- 2005 (20)
- 2004 (27)
- 2003 (14)
- 2002 (16)
- 2001 (13)
- 2000 (25)
- 1999 (20)
- 1998 (18)
- 1997 (29)
- 1996 (16)
- 1995 (19)
- 1994 (19)
- 1993 (16)
- 1992 (12)
- 1991 (11)
- 1990 (8)
- 1989 (13)
- 1988 (10)
- 1987 (5)
- 1986 (6)
- 1985 (9)
- 1984 (2)
- 1983 (3)
- 1982 (2)
- 1981 (3)
- 1980 (8)
- 1979 (4)
- 1978 (7)
- 1977 (1)
- 1976 (6)
- 1975 (2)
- 1974 (4)
- 1973 (1)
- 1972 (3)
- 1970 (1)
Institute
- Fachbereich Elektrotechnik und Informationstechnik (637) (remove)
Document Type
- Article (637) (remove)
Keywords
- Multimediamarkt (6)
- Hot S-parameter (2)
- Literaturanalyse (2)
- MINLP (2)
- Referenzmodellierung (2)
- 197m/gHg (1)
- 3-D printing (1)
- Anwendungsorientierter Forschungsansatz (1)
- Arbeit 4.0 (1)
- Automated driving (1)
Purpose:
At 1.5 T, real-time MRI of joint movement has been shown to be feasible. However, 7 T, provides higher SNR and thus an improved potential for parallel imaging acceleration. The purpose of this work was to build an open, U-shaped eight-channel transmit/receive microstrip coil for 7 T MRI to enable high-resolution and real-time imaging of the moving ankle joint.
Methods:
A U-shaped eight-channel transmit/receive array for the human ankle was built.urn:x-wiley:00942405:mp3399:equation:mp3399-math-0001-parameters and urn:x-wiley:00942405:mp3399:equation:mp3399-math-0002-factor were measured. SAR calculations of different ankle postures were performed to ensure patient safety. Inhomogeneities in the transmit field consequent to the open design were compensated for by the use of static RF shimming. High-resolution and real-time imaging was performed in human volunteers.
Results:
The presented array showed good performance with regard to patient comfort and image quality. High acceleration factors of up to 4 are feasible without visible acceleration artifacts. Reasonable image homogeneity was achieved with RF shimming.
Conclusions:
Open, noncylindrical designs for transmit/receive coils are practical at 7 T and real-time imaging of the moving joint is feasible with the presented coil design.
Optical constants from the far infrared to the X-ray region: Mg, Al, Cu, Ag, Au, Bi, C, and Al₂O₃
(1975)
Given industrial applications, the costs for the operation and maintenance of a pump system typically far exceed its purchase price. For finding an optimal pump configuration which minimizes not only investment, but life-cycle costs, methods like Technical Operations Research which is based on Mixed-Integer Programming can be applied. However, during the planning phase, the designer is often faced with uncertain input data, e.g. future load demands can only be estimated. In this work, we deal with this uncertainty by developing a chance-constrained two-stage (CCTS) stochastic program. The design and operation of a booster station working under uncertain load demand are optimized to minimize total cost including purchase price, operation cost incurred by energy consumption and penalty cost resulting from water shortage. We find optimized system layouts using a sample average approximation (SAA) algorithm, and analyze the results for different risk levels of water shortage. By adjusting the risk level, the costs and performance range of the system can be balanced, and thus the
system’s resilience can be engineered
The application of mathematical optimization methods for water supply system design and operation provides the capacity to increase the energy efficiency and to lower the investment costs considerably. We present a system approach for the optimal design and operation of pumping systems in real-world high-rise buildings that is based on the usage of mixed-integer nonlinear and mixed-integer linear modeling approaches. In addition, we consider different booster station topologies, i.e. parallel and series-parallel central booster stations as well as decentral booster stations. To confirm the validity of the underlying optimization models with real-world system behavior, we additionally present validation results based on experiments conducted on a modularly constructed pumping test rig. Within the models we consider layout and control decisions for different load scenarios, leading to a Deterministic Equivalent of a two-stage stochastic optimization program. We use a piecewise linearization as well as a piecewise relaxation of the pumps’ characteristics to derive mixed-integer linear models. Besides the solution with off-the-shelf solvers, we present a problem specific exact solving algorithm to improve the computation time. Focusing on the efficient exploration of the solution space, we divide the problem into smaller subproblems, which partly can be cut off in the solution process. Furthermore, we discuss the performance and applicability of the solution approaches for real buildings and analyze the technical aspects of the solutions from an engineer’s point of view, keeping in mind the economically important trade-off between investment and operation costs.