Refine
Year of publication
- 2024 (13)
- 2023 (4)
- 2022 (10)
- 2021 (11)
- 2020 (14)
- 2019 (28)
- 2018 (16)
- 2017 (14)
- 2016 (35)
- 2015 (26)
- 2014 (11)
- 2013 (17)
- 2012 (30)
- 2011 (23)
- 2010 (23)
- 2009 (27)
- 2008 (21)
- 2007 (29)
- 2006 (39)
- 2005 (18)
- 2004 (20)
- 2003 (20)
- 2002 (8)
- 2001 (9)
- 2000 (17)
- 1999 (12)
- 1998 (13)
- 1997 (5)
- 1996 (14)
- 1995 (13)
- 1994 (9)
- 1993 (11)
- 1992 (11)
- 1991 (7)
- 1990 (4)
- 1989 (4)
- 1988 (10)
- 1987 (7)
- 1986 (5)
- 1985 (8)
- 1984 (8)
- 1983 (4)
- 1982 (3)
- 1981 (3)
- 1980 (5)
- 1979 (5)
- 1978 (3)
- 1977 (2)
- 1976 (2)
- 1975 (2)
- 1974 (2)
- 1972 (1)
- 1971 (1)
- 1969 (1)
Document Type
- Article (324)
- Book (117)
- Conference Proceeding (101)
- Part of a Book (86)
- Report (17)
- Doctoral Thesis (6)
- Contribution to a Periodical (2)
- Patent (2)
- Working Paper (2)
- Poster (1)
Has Fulltext
- no (658) (remove)
Keywords
- metal structure (4)
- steel (4)
- industrial research (3)
- iron and steel industry (3)
- materials technology (3)
- research report (3)
- Haustechnik (2)
- Heizung (2)
- Klimatechnik (2)
- Lüftung (2)
- Lüftungstechnik (2)
- Stickstoffoxide (2)
- building industry (2)
- building information modelling (2)
- building materials (2)
- energy efficiency (2)
- research project (2)
- resistance of materials (2)
- 20 fossil-fueled power plants (1)
- 3D printing (1)
Institute
- Fachbereich Bauingenieurwesen (658) (remove)
Using optimization to design a renewable energy system has become a computationally demanding task as the high temporal fluctuations of demand and supply arise within the considered time series. The aggregation of typical operation periods has become a popular method to reduce effort. These operation periods are modelled independently and cannot interact in most cases. Consequently, seasonal storage is not reproducible. This inability can lead to a significant error, especially for energy systems with a high share of fluctuating renewable energy. The previous paper, “Time series aggregation for energy system design: Modeling seasonal storage”, has developed a seasonal storage model to address this issue. Simultaneously, the paper “Optimal design of multi-energy systems with seasonal storage” has developed a different approach. This paper aims to review these models and extend the first model. The extension is a mathematical reformulation to decrease the number of variables and constraints. Furthermore, it aims to reduce the calculation time while achieving the same results.
Ein neues tragendes, lagenweise aufgebautes Holzbau-Wandsystem und seine ökonomische und statische Entwicklung werden vorgestellt. Randbedingungen wie Nachhaltigkeit, Ressourceneffizienz und eine beanspruchungsadaptive Konstruktionsweise sind für diese innovative Bauteilentwicklung von zentraler Bedeutung. Eine wesentliche Herausforderung ist die Herstellung der Verbindung der Lagen untereinander zu einem bauphysikalisch und statisch leistungsfähigen Wandsystem. Die Tragfähigkeit und Steifigkeit verschiedener Verbindungsvarianten wurden ebenso wie die Eigenschaften der Wandelemente analytisch, numerisch und experimentell untersucht.
Deammonification for nitrogen removal in municipal wastewater in temperate and cold climate zones is currently limited to the side stream of municipal wastewater treatment plants (MWWTP). This study developed a conceptual model of a mainstream deammonification plant, designed for 30,000 P.E., considering possible solutions corresponding to the challenging mainstream conditions in Germany. In addition, the energy-saving potential, nitrogen elimination performance and construction-related costs of mainstream deammonification were compared to a conventional plant model, having a single-stage activated sludge process with upstream denitrification. The results revealed that an additional treatment step by combining chemical precipitation and ultra-fine screening is advantageous prior the mainstream deammonification. Hereby chemical oxygen demand (COD) can be reduced by 80% so that the COD:N ratio can be reduced from 12 to 2.5. Laboratory experiments testing mainstream conditions of temperature (8–20°C), pH (6–9) and COD:N ratio (1–6) showed an achievable volumetric nitrogen removal rate (VNRR) of at least 50 gN/(m3∙d) for various deammonifying sludges from side stream deammonification systems in the state of North Rhine-Westphalia, Germany, where m3 denotes reactor volume. Assuming a retained Norganic content of 0.0035 kgNorg./(P.E.∙d) from the daily loads of N at carbon removal stage and a VNRR of 50 gN/(m3∙d) under mainstream conditions, a resident-specific reactor volume of 0.115 m3/(P.E.) is required for mainstream deammonification. This is in the same order of magnitude as the conventional activated sludge process, i.e., 0.173 m3/(P.E.) for an MWWTP of size class of 4. The conventional plant model yielded a total specific electricity demand of 35 kWh/(P.E.∙a) for the operation of the whole MWWTP and an energy recovery potential of 15.8 kWh/(P.E.∙a) through anaerobic digestion. In contrast, the developed mainstream deammonification model plant would require only a 21.5 kWh/(P.E.∙a) energy demand and result in 24 kWh/(P.E.∙a) energy recovery potential, enabling the mainstream deammonification model plant to be self-sufficient. The retrofitting costs for the implementation of mainstream deammonification in existing conventional MWWTPs are nearly negligible as the existing units like activated sludge reactors, aerators and monitoring technology are reusable. However, the mainstream deammonification must meet the performance requirement of VNRR of about 50 gN/(m3∙d) in this case.
Bauwirtschaft
(2024)
Die Leistungen der Bauwirtschaft und deren wirtschaftliche Bedeutung in Deutschland werden anhand einer Vielzahl statistischer Daten verdeutlicht. Die im Vergleich zu anderen Wirtschaftsbereichen auftretenden branchenspezifischen Besonderheiten der Bauwirtschaft werden anhand von verschiedenen Kriterien herausgearbeitet. Das Zusammenspiel der einzelnen Akteure des Sektors und die dabei sich ergebenden bzw. zu beachtenden Rechts- und Vertragsgrundlagen werden dargestellt. Aufgrund der meist erheblichen Höhe des eingesetzten Kapitals werden auch notwendige Formen der Risikoabsicherungen und der in der Branche üblichen und teilweise vorgeschriebenen Versicherungsmöglichkeiten angesprochen.
Durch das öffentliche Baurecht werden die Zulässigkeit, die Grenzen, die Ordnung und die Förderung der baulichen Nutzung des Bodens geregelt.
Die Ausschreibung und die Vergabe sind von essenzieller Bedeutung für ein Bauvorhaben und werden deshalb in der HOAI mit zwei Leistungsphasen abgebildet: nämlich mit der Leistungsphase 6 Vorbereitung der Vergabe sowie der Leistungsphase 7 Mitwirkung bei der Vergabe. Im Zuge der Ausschreibung und der Vergabe werden die für den AG anfallenden Kosten festgelegt und bilden somit die letzte größere Stellschraube für Preiseinsparungen.
n diesem Kapitel werden die Abrechnungsvorschriften wichtiger ATV kurz, aber umfassend zusammengestellt. Einigen Abrechnungsbestimmungen für Einzelleistungen, die keine Nebenleistungen sind ((siehe DIN 18299 und Abschnitt 4 der jeweiligen ATV), sind mit aufgenommen worden; die ATV enthalten jedoch weitergehende Festlegungen über Nebenleistungen und Besondere Leistungen.
Im Anschluss folgen Hinweise zu den Toleranzen im Hochbau sowie im Straßenbau.
Boden, Baugrube, Verbau
(2024)
Die Lösung den Baugrund betreffender Fragestellungen beginnen i. d. R. mit der Durchführung von Baugrunderkundungen, um alle notwendigen Parameter zu erhalten, die für die Planung und Durchführung von Bauvorhaben notwendig sind. Im Folgenden werden die wichtigsten Erkundungen in Abhängigkeit der erforderlichen Güteklasse der Proben beschrieben und vorgestellt.
Die Arbeitsvorbereitung, als ein wesentliches Aufgabengebiet des Baubetriebswesens, ist von enormer Bedeutung für den Erfolg eines Bauprojektes. Die Arbeitsvorbereitung lässt sich zeitlich sowohl in der Angebotsphase (kalkulationsbegleitende Arbeitsvorbereitung), in der Vorbereitungsphase der Baustelle (von Auftragsvergabe bis Baubeginn) als auch baubegleitend einordnen.