Article
Refine
Year of publication
Institute
- Fachbereich Medizintechnik und Technomathematik (1591)
- Fachbereich Wirtschaftswissenschaften (705)
- Fachbereich Elektrotechnik und Informationstechnik (637)
- Fachbereich Energietechnik (609)
- Fachbereich Chemie und Biotechnologie (602)
- INB - Institut für Nano- und Biotechnologien (542)
- Fachbereich Maschinenbau und Mechatronik (483)
- IfB - Institut für Bioengineering (449)
- Fachbereich Luft- und Raumfahrttechnik (379)
- Fachbereich Bauingenieurwesen (333)
Language
Document Type
- Article (5642) (remove)
Keywords
- Einspielen <Werkstoff> (7)
- Multimediamarkt (6)
- Rapid prototyping (5)
- avalanche (5)
- Earthquake (4)
- FEM (4)
- Finite-Elemente-Methode (4)
- LAPS (4)
- Rapid Prototyping (4)
- biosensors (4)
Aufsicht und Rechtsdurchsetzung bei unzulässigem Einsatz von Cookies & Co. unter Geltung des TTDSG
(2022)
Booster stations can fulfill a varying pressure demand with high energy-efficiency, because individual pumps can be deactivated at smaller loads. Although this is a seemingly simple approach, it is not easy to decide precisely when to activate or deactivate pumps. Contemporary activation controls derive the switching points from the current volume flow through the system. However, it is not measured directly for various reasons. Instead, the controller estimates the flow based on other system properties. This causes further uncertainty for the switching decision. In this paper, we present a method to find a robust, yet energy-efficient activation strategy.
Cheap does not imply cost-effective -- this is rule number one of zeitgeisty system design. The initial investment accounts only for a small portion of the lifecycle costs of a technical system. In fluid systems, about ninety percent of the total costs are caused by other factors like power consumption and maintenance. With modern optimization methods, it is already possible to plan an optimal technical system considering multiple objectives. In this paper, we focus on an often neglected contribution to the lifecycle costs: downtime costs due to spontaneous failures. Consequently, availability becomes an issue.