Article
Refine
Year of publication
- 2007 (176) (remove)
Institute
- Fachbereich Medizintechnik und Technomathematik (48)
- Fachbereich Wirtschaftswissenschaften (28)
- IfB - Institut für Bioengineering (24)
- Fachbereich Elektrotechnik und Informationstechnik (22)
- Fachbereich Bauingenieurwesen (19)
- INB - Institut für Nano- und Biotechnologien (18)
- Fachbereich Luft- und Raumfahrttechnik (15)
- Fachbereich Chemie und Biotechnologie (14)
- Fachbereich Energietechnik (14)
- Fachbereich Maschinenbau und Mechatronik (9)
Document Type
- Article (176) (remove)
Keywords
- Air purification (1)
- Baubetrieb (1)
- Bauingenieurwesen (1)
- Baukosten (1)
- Bauvertrag (1)
- CAD (1)
- Clusterion (1)
- Kostenermittlung (1)
- Kostenkontrolle (1)
- Kostensteuerung (1)
Detecting synchronization clusters in multivariate time series via coarse-graining of Markov chains
(2007)
Abfallwirtschaft
(2007)
Abfallwirtschaft
(2007)
Solar Sail Kinetic Energy Impactor Trajectory Optimization for an Asteroid-Deflection Mission
(2007)
Eine Einführung in die Anwendung der VOB in der baubetrieblichen Praxis im Rahmen der ergänzenden Schriften zu den Vorlesungen. Die Anwendung der VOB als Vertragsbedingung für einen Bauvertrag ist gängige Praxis, über die der Architekt im Baubetrieb umfassend informiert sein muß. Die Anwendung der VOB im Bauvertrag bedarf der vorherigen Vereinbarung zwischen den Vertragsparteien. Dabei muß die VOB im Ganzen vereinbart werden. Eine Veränderung dieser Bestimmungen führt zur teilweisen Unwirksamkeit der vertraglichen Vereinbarung. Der Architekt, der für seinen Bauherrn die Vergabeunterlagen zusammenstellen muß, haftet für Fehler bei der Formulierung oder der Zusammenstellung. Es ist daher für den Architekten unerläßlich, die vertraglichen Zusammenhänge zu kennen. Dieser Fachaufsatz soll zu einem sicheren Umgang mit der VOB als Vertragsgrundlage beitragen.
Textauszug: Nach dem Leistungsbild der HOAI hat der Architekt bei Planung und Baubetrieb vier Stationen der Kostenermittlung entsprechend der DIN 276, Abschnitt 2.3 abzuarbeiten. Der Architekt, der seiner Verantwortung gerecht werden will, wird hier weitere Kontrollmechanismen einbauen wollen. Über die genannten Kostenermittlungen hinaus kennt die DIN 276 daher noch das Erfordernis der Kostenkontrolle in Abschnitt 2.4 und der Kostensteuerung in Abschnitt 2.5. Die Kostensteuerung greift immer dann, wenn die Kostenkontrolle eine Abweichung des Kostenrahmens von den Sollwerten aufzeigt. Dazu müssen die Kontrollinstanzen dort eingebaut werden, wo Korrekturen noch möglich sind. Eine erste Kontrolle der Kosten ist daher zwischen Massenermittlung und Vergabe sinnvoll einzuflechten. Zu diesem Zeitpunkt kann die Planung noch verändert werden, was einen ersten steuernden Eingriff in die Baukosten ermöglicht, und zwar bevor die Angebotsunterlagen verschickt werden. Die Grundlagen zu einer effektiven Kostensteuerung werden in der Mengenermittlung der Leistungsphase 6 gelegt. Wenn dort die Mengen nicht sorgfältig und nachvollziehbar ermittelt wurden, wird der Soll- Ist- Abgleich während der Bauphase nicht frühzeitig genug gelingen, wenn nicht gar ganz entfallen. Es gilt also, dafür zu sorgen, dass die Mengenermittlung zur Vergabe mit entsprechender Sorgfalt und vor Allem „projektnah“ erfolgt. Schätzungen haben hier keine Berechtigung.
Geotechnik
(2007)
Geotechnik
(2007)
Media Delivery Based on Service Aware Transport Overlay Networks / Kampmann, Markus ; Hartung, Frank
(2007)
Chain scattering parameters or T-parameters are a useful tool for calculating cascaded two-ports. With the increasing importance of mixed-mode S-parameters, a need for converting the T-parameters from their unbalanced form into a balanced form emerges for suiting both common and differential mode waves, as well as the mode conversion. This paper presents the derivation of the equations for transformations between mixed-mode S- and T-parameters for a mixed-mode two-port. Although derived in a way very similar to monomode T-parameters, no simplifications were necessary. Measurement results exemplify the quality of the T-parameter transformation under real-life conditions.
Beurteilung der Ausbaunotwendigkeit von Eisenbahn-Streckenabschnitten - ein anspruchsloses Verfahren
(2007)
Mannoheptulose is a seven-carbon sugar. It is an inhibitor of glucose-induced insulin secretion due to its ability to selectively inhibit the enzyme glucokinase. An improved procedure for mannoheptulose isolation from avocados is described in this study (based upon the original method by La Forge). The study focuses on the combination of biotransformation and downstream processing (preparative chromatography) as an efficient method to produce a pure extract of mannoheptulose. The experiments were divided into two major phases. In the first phase, several methods and parameters were compared to optimize the mannoheptulose extraction with respect to efficiency and purity. In the second phase, a mass balance of mannoheptulose over the whole extraction process was undertaken to estimate the yield and efficiency of the total extraction process. The combination of biotransformation and preparative chromatography allowed the production of a pure mannoheptulose extract. In a biological test, the sugar inhibited the glucokinase enzyme activity efficiently.
In: Advanced Engineering Informatics. Vol 21, Issue 1, 2007, Pages 67-83 http://dx.doi.org/10.1016/j.aei.2006.10.001 eds. J.C. Kunz, I.F.C. Smith and T. Tomiyama, Elsevier, Seite 1-22 Current CAD tools are not able to support the conceptual design phase, and none of them provides a consistency analysis for sketches produced by architects. This phase is fundamental and crucial for the whole design and construction process of a building. To give architects a better support, we developed a CAD tool for conceptual design and a knowledge specification tool. The knowledge is specific to one class of buildings and it can be reused. Based on a dynamic and domain-specific knowledge ontology, different types of design rules formalize this knowledge in a graph-based form. An expressive visual language provides a user-friendly, human readable representation. Finally, a consistency analysis tool enables conceptual designs to be checked against this formal conceptual knowledge. In this article, we concentrate on the knowledge specification part. For that, we introduce the concepts and usage of a novel visual language and describe its semantics. To demonstrate the usability of our approach, two graph-based visual tools for knowledge specification and conceptual design are explained.
Stahlbau
(2007)
Stahlbau
(2007)