Conference Proceeding
Refine
Year of publication
Institute
- Fachbereich Elektrotechnik und Informationstechnik (302)
- Fachbereich Energietechnik (259)
- Fachbereich Medizintechnik und Technomathematik (243)
- Fachbereich Maschinenbau und Mechatronik (209)
- Fachbereich Luft- und Raumfahrttechnik (208)
- Solar-Institut Jülich (167)
- IfB - Institut für Bioengineering (152)
- Fachbereich Bauingenieurwesen (139)
- Fachbereich Wirtschaftswissenschaften (73)
- ECSM European Center for Sustainable Mobility (62)
Language
- English (1170)
- German (477)
- Italian (1)
- Multiple languages (1)
- Spanish (1)
Document Type
- Conference Proceeding (1650) (remove)
Keywords
- Biosensor (25)
- Blitzschutz (15)
- CAD (11)
- Finite-Elemente-Methode (11)
- civil engineering (11)
- Bauingenieurwesen (10)
- Lightning protection (9)
- Einspielen <Werkstoff> (6)
- Telekommunikationsmarkt (6)
- shakedown analysis (6)
LACASA - ein Instrument zur energetischen Analyse und Optimierung von Gebäuden mit Anlagentechnik
(2004)
Mechanical stimulation of the cells resulted in evident changes in the cell morphology, protein composition and gene expression. Microscopically, additional formation of stress fibers accompanied by cell re-arrangements in a monolayer was observed. Also, significant activation of p53 gene was revealed as compared to control. Interestingly, the use of CellTech membrane coating induced cell death after mechanical stress had been applied. Such an effect was not detected when fibronectin had been used as an adhesion substrate.
Solar sails enable missions to the outer solar system and beyond, although the solar
radiation pressure decreases with the square of solar distance. For such missions, the solar sail may gain a large amount of energy by first making one or more close approaches to the sun. Within this paper, optimal trajectories for solar sail missions to the outer planets and into near interstellar space (200 AU) are presented. Thereby, it is shown that even near/medium-term solar sails with relatively moderate performance allow reasonable transfer times to the boundaries of the solar system.
Recently, in his vision for space exploration, US president Bush announced to extend human presence across the solar system, starting with a human return to the Moon as early as 2015 in preparation for human exploration of Mars and other destinations. In Europe, an exploration program, termed AURORA, was established by ESA in 2001 – funded on a voluntary basis by ESA member states – with a clear focus on Mars and the ultimate goal of landing humans on Mars around 2030 in international cooperation. In 2003, a Human Spaceflight Vision Group was appointed by ESA with the task to develop a vision for the role of human spaceflight during the next quarter of the century. The resulting vision focused on a European-led lunar exploration initiative as part of a multi-decade, international effort to strengthen European identity and economy. After a review of the situation in Europe concerning space exploration, the paper outlines an approach for a consistent positioning of exploration within the existing European space programs, identifies destinations, and develops corresponding scenarios for an integrated strategy, starting with robotic missions to the Moon, Mars, and near-Earth asteroids. The interests of the European planetary in-situ science community, which recently met at DLR Cologne, are considered. Potential robotic lunar missions comprise polar landings to search for frozen volatiles and a sample return. For Mars, the implementation of a modest robotic landing mission in 2009 to demonstrate the capability for landing and prepare more ambitious and complex missions is discussed. For near-Earth asteroid exploration, a low-cost in-situ technology demonstration mission could yield important results. All proposed scenarios offer excellent science and could therefore create synergies between ESA’s mandatory and optional programs in the area of planetary science and exploration. The paper intents to stimulate the European discussion on space exploration and reflects the personal view of the authors.
Close interrelations between sound and image are not a mere phenomenon of today’s multimedia technology. The idea of the synthesis of different media lies at the core of the concept of the Gesamtkunstwerk in the second half of the 19th century and it can also be traced back to the synaesthesia debate at the beginning of the 20th century [...].
Funktionsprinzip Emissionsrechtehandel, Betroffene Anlagen und Branchen, Erstverteilung der Emissionsrechte, Bereits erbrachte Emissionsreduktionen (early actions), Ausstieg von betroffenen Unternehmen (opt-out), Teilnahme von nicht betroffenen Unternehmen, Einsatz von Biobrennstoffen, Erfassung und Dokumentation der Emissionen
Ausgangslage, Funktionsprinzip des virtuellen Kraftwerkes, Energiemanagementsysteme (EMS), Einsatzgebiete, Anlagesysteme eines VKW's, Einsatzbereich der verschiedenen dezentralen Energieanlagen, Vorteile des virtuellen Kraftwerkes, Auswirkungen auf das elektrische Netz, Wirtschaftliche Aspekte, Beispielprojekte
Ein von der Arbeitsgemeinschaft (AG) Solar NRW und diversen Industriepartnern gefördertes und an der Fachhochschule Aachen, Abt. Jülich durchgeführtes Forschungsprojekt „Blitzschutz für netz-autarke Hybridanlagen“ machte es möglich, sich mit dem Blitzschutz speziell solcher Anlagen näher zu beschäftigen. Vermehrt bekannt gewordene Schadensfälle an nicht netz-gekoppelten Hybridanlagen waren der Auslöser, den Schutz zu überdenken. Definiertes Ziel war es, für netz-autarke energietechnische Anlagen ein Konzept zum Schutz vor Blitzeinwirkungen zu erstellen. Diese Anlagen bestehen üblicherweise aus einer oder mehreren Photovoltaikanlagen, ggf. auch Solarthermieanlagen und einem oder mehreren kleineren Windgeneratoren (sie werden deshalb auch als Hybridanlagen bezeichnet). Zur Erhöhung der Versorgungssicherheit kann noch ein Dieselaggregat dazukommen. Hybridanlagen werden vor allem in Gebieten mit sehr schlechter öffentlicher Energieversorgung eingesetzt, d.h. insbesondere in relativ dünn bewohnten Gebieten und in Entwicklungsländern. Dem Blitzschutz von Hybridanlagen kommt dabei eine steigende Bedeutung zu. Besonderes Augenmerk in dem genannten Forschungsprojekt sollte dabei auf die technisch/wirtschaftliche Ausgewogenheit des Schutzes gelegt werden: • die Schutzmaßnahmen sollen nur in solchen Fällen eingesetzt werden, wo dies als Ergebnis von Risikoanalysen sinnvoll erscheint; • für typische netz-autarke Hybridanlagen sollen die Schutzmaßnahmen ohne deutliche Verteuerung realisierbar sein (es soll also kein absoluter Schutz realisiert werden; ggf. soll lediglich der auftretende Schaden soweit möglich minimiert werden). Dazu wurde in einem ersten Schritt zunächst eine Aufnahme des Iststandes einiger typischer netz-autarker Hybridanlagen und deren einzelnen Komponenten durchgeführt. Aufgrund dessen wurde eine umfassende Risikoanalyse zur Blitzbedrohung dieser Anlagen auf der Basis von VDE V 0185 Teil 2:2002-11 [1] erstellt. Die Ergebnisse mündeten in ein technisch/wirtschaftlich ausgewogenes Konzept für den Anlagen- Blitzschutz (d.h. insbesondere dem Schutz vor direkten Blitzeinschlägen und deren unmittelbaren Auswirkungen) nach VDE V 0185 Teil 3:2002-11 [2] und für den Elektronik-Blitzschutz (d.h. für den Schutz vor Überspannungen durch direkte, insbesondere aber auch indirekte Blitzeinschläge) nach VDE V 0185 Teil 4:2002-11 [3]. Aufgrund der gesammelten Ergebnisse konnten dabei allgemeine Empfehlungen für den Äußeren und Inneren Blitzschutz von regenerativen Energieerzeugungssystemen erstellt werden. Diese sollen in Schulungen einmünden, die für Hersteller und Betreiber von Hybridanlagen angeboten werden. Durch die Anwendung wird der Schutz der Anlagen vor Blitzeinwirkung und elektromagnetischen Störungen verbessert, was sich in einer reduzierten Ausfallwahrscheinlichkeit bzw. erhöhten Verfügbarkeit wiederspiegelt. An einigen ausgewählten Anlagen werden mit Hilfe der im Projekt involvierten Industriepartner die Schutzmaßnahmen realisiert. Hierbei entstanden den Eigentümern bzw. Betreibern der Anlagen keine Kosten. In diesem Beitrag werden beispielhaft drei Anlagenprojekte detailliert gezeigt. Es handelt sich dabei um eine Schweinezuchtfarm in Magallón (Spanien, Zaragozza), das bioklimatische Haus (Kreta, Heraklion) und die Tegernseer- Hütte (Deutschland, Lenggries).
Die neue Vornorm VDE V 0185 Teil 2 „Risikomanagement: Abschätzung des Schadensrisikos für bauliche Anlagen“ [1] ist seit November 2002 gültig. Sie ermöglicht nicht nur die Ermittlung der Schutzklasse eines Blitzschutzsystems, sondern auch die Untersuchung zur Notwendigkeit anderer Schutzmaßnahmen gegen Blitzeinwirkungen (Überspannungsschutzgeräte in Unterverteilern und/oder an Endgeräten, Schirmung des Gebäudes und/oder interner Räume, Potentialsteuerung, Brandmelde- und Feuerlöscheinrichtungen, etc.) nach objektiven Kriterien und damit in einer für alle Beteiligten grundsätzlich nachvollziehbaren Art und Weise. Dass eine solche Analyse rel. komplex sein muss und der intensiven Beschäftigung bedarf, ist deshalb nicht verwunderlich. Die Komplexität des Verfahrens sollte allerdings nicht dazu führen, die Vornorm als Ganzes abzulehnen. Die Vornorm beruht auf dem Stand der Diskussion im internationalen Normengremium IEC TC81 WG9 Ende des Jahres 2000. Integriert wurden einige nationale Besonderheiten, die aus Sicht des zuständigen Normenkomitees DKE K251 erforderlich erschienen. In Deutschland konnten und können nun erste breite Erfahrungen in der Anwendung dieser Risikoanalyse gesammelt werden; in anderen Ländern ist dies noch nicht möglich. Diese Erfahrungen können dann, nach Diskussion im nationalen Rahmen, in die internationale Normenarbeit eingebracht werden. Im folgenden Beitrag sollen einige, seit Erscheinen der Vornorm oft wiederkehrende Fragen dargestellt und Lösungsvorschläge vorgestellt werden. Dabei wird auch auf die Tendenzen im internationalen Normengremium IEC TC81 WG9 eingegangen, d.h. auf den aktuellen Entwurf zur IEC 62305-2 [3]. Die Lösungsvorschläge werden begründet, sind allerdings weitestgehend subjektive Meinung des Autors. Für übliche bauliche Anlagen ist die Anwendung der Vornorm rel. einfach möglich. Auch für spezielle Fälle können die darin festgelegten Verfahren herangezogen werden; allerdings sind dann einige weiterführende Überlegungen notwendig, die der Planer von Blitzschutzsystemen durchführen muss. Anhand zweier Beispiele soll die Anwendung der VDE V 0185 Teil 2 auf solche speziellen Fälle dargestellt werden.
Bauliche Anlagen mit Stahlkonstruktionen (bzw. auch Stahlbetonskelett- Konstruktionen) und metallenen Wänden sind bereits in sehr großer Zahl errichtet. Dazu gehören kleinere bis größere Lagerhallen ebenso wie Einkaufszentren. Sie zeichnen sich durch große Flexibilität, einfache Planung, kurze Bauzeit und rel. geringe Kosten aus. Auch in der nahen Zukunft ist deshalb mit Planung und Errichtung weiterer solcher baulicher Anlagen zu rechnen. Abhängig von der Nutzung der Hallen sind auch mehr oder weniger umfangreiche elektrische und elektronische Systeme vorhanden, die wichtige Funktionen sicherstellen müssen. Der Blitzschutz für diese baulichen Anlagen sollte sich also nicht nur im „klassischen“ Gebäude-Blitzschutz nach DIN V 0185-3 VDE V 0185 Teil 3 [1] erschöpfen; ein Ergänzung hin zu einem sinnvollen Grundschutz der elektrischen und elektronischen Systeme nach DIN V 0185-4 VDE V 0185 Teil 4 [2] ist anzuraten. Im folgenden Beitrag wird ein Konzept vorgestellt, mit dem ein hochwertiger Blitzschutz sowohl der baulichen Anlage und der darin befindlichen Personen, als auch der elektrischen und elektronischen Systeme verwirklicht werden kann. Insbesondere bei großflächigen Hallen stellen sich dabei besondere Anforderungen. Das Konzept und die zugehörigen blitzschutz-technischen Maßnahmen können drei Hauptbereichen zugeordnet werden: - Äußerer Blitzschutz; - Innerer Blitzschutz; - weitergehende besondere Maßnahmen. Das Konzept sowie die Maßnahmen werden allgemein beschrieben und teilweise anhand einer ausgeführten Anlage mit Fotos beispielhaft dokumentiert.
Ein vorausschauendes Risikomanagement beinhaltet, Risiken für das Unternehmen zu kalkulieren. Es liefert Entscheidungsgrundlagen, um diese Risiken zu begrenzen und es macht transparent, welche Risiken sinnvollerweise über Versicherungen abgedeckt werden sollten. Beim Versicherungsmanagement ist jedoch zu bedenken, dass zur Erreichung bestimmter Ziele Versicherungen nicht immer geeignet sind (z.B. Erhaltung der Lieferfähigkeit). Eintrittswahrscheinlichkeiten bestimmter Risiken lassen sich durch Versicherungen nicht verändern. Bei Unternehmen, die mit umfangreichen elektronischen Einrichtungen produzieren oder Dienstleistungen erbringen (und das sind heutzutage wohl die meisten), muss auch das Risiko durch Blitzeinwirkungen besondere Berücksichtigung finden. Dabei ist zu beachten, dass der Schaden aufgrund der Nicht-Verfügbarkeit der elektronischen Einrichtungen und damit der Produktion bzw. der Dienstleistung und ggf. der Verlust von Daten den Hardware-Schaden an der betroffenen Anlage oft bei weitem übersteigt. Im Blitzschutz gewinnt innovatives Denken in Schadensrisiken langsam an Bedeutung. Risikoanalysen haben die Objektivierung und Quantifizierung der Gefährdung von baulichen Anlagen und ihrer Inhalte durch direkte und indirekte Blitzeinschläge zum Ziel. Seinen Niederschlag hat dieses neue Denken in der neuen deutschen Vornorm DIN V 0185-2 VDE V 0185 Teil 2 [1] gefunden. Die hier vorgegebene Risikoanalyse gewährleistet, dass ein für alle Beteiligten nachvollziehbares Blitzschutz-Konzept erstellt werden kann, das technisch und wirtschaftlich optimiert ist, d.h. bei möglichst geringem Aufwand den notwendigen Schutz gewährleisten kann. Die sich aus der Risikoanalyse ergebenden Schutzmaßnahmen sind dann in den weiteren Normenteilen der neuen Reihe VDE V 0185 [2, 3] detailliert beschrieben.
Eine neue Generation von Praktika an Hochschulen wächst heran. Moderne Wege beim Verstehen und Erlernen naturwissenschaftlicher Zusammenhänge sowie industrieller Fertigungsprozesse sind gefordert. Das Technologiepraktikum „Virtuelle Sensor- Fertigung“, entwickelt im Verbundprojekt INGMEDIA an den Fachhochschulen Aachen und Zweibrücken, trägt als neuartiges Lern- und Lehrmodul dieser Forderung Rechnung. Die Studierenden lernen einen vollständigen Fertigungsprozess mit Hilfe von virtuellen, in LabVIEW programmierten Maschinen kennen, bevor sie die reale Prozesskette im Reinraum durchführen.
Das Technologiepraktikum „Virtuelle Sensor-Fertigung“ ist ein Beispiel für die medientechnische Aufbereitung von Lern- und Lehrmaterial unter didaktischen Gesichtspunkten. Studierende lernen einen Fertigungsprozess mit Hilfe von virtuellen Maschinen kennen, bevor sie die reale Prozesskette im Laborpraktikum im Reinraum durchführen.
WS GTaD-2003 - The 1st Workshop on Graph Transformations and Design ed Grabska, E., Seite 6-7, Jagiellonian University Krakow. 2 pages
ITCE-2003 - 4th Joint Symposium on Information Technology in Civil Engineering ed Flood, I., Seite 1-12, ASCE (CD-ROM), Nashville, USA In this paper we discussed graph based tools to support architects during the conceptual design phase. Conceptual Design is defined before constructive design; the used concepts are more abstract. We develop two graph based approaches, a topdown using the graph rewriting system PROGRES and a more industrially oriented approach, where we extend the CAD system ArchiCAD. In both approaches, knowledge can be defined by a knowledge engineer, in the top-down approach in the domain model graph, in the bottom-up approach in the in an XML file. The defined knowledge is used to incrementally check the sketch and to inform the architect about violations of the defined knowledge. Our goal is to discover design error as soon as possible and to support the architect to design buildings with consideration of conceptual knowledge.
Production and distribution of personalized information services employing mass customization
(2003)
This paper presents the direct route to Design by Analysis (DBA) of the new European pressure vessel standard in the language of limit and shakedown analysis (LISA). This approach leads to an optimization problem. Its solution with Finite Element Analysis is demonstrated for some examples from the DBA-Manual. One observation from the examples is, that the optimisation approach gives reliable and close lower bound solutions leading to simple and optimised design decision.
Textile reinforced concrete. Part I: Process model for collaborative research and development
(2003)
Solar sails are propelled in space by reflecting solar photons off large mirroring surfaces, thereby transforming the momentum of the photons into a propulsive force. This innovative concept for low-thrust space propulsion works without any propellant and thus provides a wide range of opportunities for highenergy low-cost missions. Offering an efficient way of propulsion, solar sailcraft could close a gap in transportation options for highly demanding exploration missions within our solar system and even beyond. On December 17th, 1999, a significant step was made towards the realization of this technology: a lightweight solar sail structure with an area of 20 m × 20 m was successfully deployed on ground in a large facility at the German Aerospace Center (DLR) at Cologne. The deployment from a package of 60 cm × 60 cm × 65 cm with a total mass of less than 35 kg was achieved using four extremely light-weight carbon fiber reinforced plastics (CFRP) booms with a specific mass of 100 g/m. The paper briefly reviews the basic principles of solar sails as well as the technical concept and its realization in the ground demonstration experiment, performed in close cooperation between DLR and ESA. Next possible steps are outlined. They could comprise the in-orbit demonstration of the sail deployment on the upper stage of a low-cost rocket and the verification of the propulsion concept by an autonomous and free flying solar sail in the frame of a scientific mission. It is expected that the present design could be extended to sail sizes of about (40 m)2 up to even (70 m)2 without significant mass penalty. With these areas, the maximum achievable thrust at 1 AU would range between 10 and 40 mN – comparable to some electric thrusters. Such prototype sails with a mass between 50 and 150 kg plus a micro-spacecraft of 50 to 250 kg would have a maximum acceleration in the order of 0.1 mm/s2 at 1 AU, corresponding to a maximum ∆V-capability of about 3 km/s per year. Two near/medium-term mission examples to a near-Earth asteroid (NEA) will be discussed: a rendezvous mission
and a sample return mission.
Recently, the SHARP Corporation, Japan, has developed the world’s first "Plasma Cluster Ions (PCI)" air purification technology using plasma discharge to generate cluster ions. The new plasma cluster device releases positive and negative ions into the air, which are able to decompose and deactivate harmful airborne substances by chemical reactions. Because cluster ions consist of positive and negative ions that normally exist in the natural world, they are completely harmless and safe to humans. The amount of ozone generated by cluster ions is less than 0.01 ppm, which is significantly less than the 0.05-ppm standard for industrial operations and consumer electronics. This amount, thus, has no harming effects whatsoever on the human body. But particular properties and chemical processes in PCI treatment are still under study. It has been shown that PCI in most cases show strongly pronounced irreversible killing effects in respect of airborne microflora due to free-radical induced reactions and can be considered as a potent technology to disinfect both home, medical and industrial appliances.
Summary and Conclusions PCIs were clearly effective in terms of their antibacterial effects with the strains tested. This efficacy increased with the time the bacteries were exposed to PCIs. The bactericidal action has proved to be irreversible. PCIs were significantly less effective in shadowed areas. PCI exposure caused multiple protein damages as observed in SDS PAGE studies. There was no single but multiple molecular mechanism causing the bacterial death.
Recently, SHARP corporation has developed the world’s first "Plasma Cluster Ions® (PCI)" air purification technology, which uses plasma discharge to generate cluster ions. The new Plasma Cluster Device releases positive and negative ions into the air, which are harmless to humans and are able to decompose and deactivate airborne substances by chemical reactions. In the past, phenomenological tests on the efficacy of the PCI air purification technology on microbial cells have been conducted. In most cases, it has been shown that PCI demonstrated strongly pronounced killing effects on microorganisms. However, the particular mechanisms of PCI action still have to be uncovered.
Recently, SHARP corporation has developed the world’s first “Plasma Cluster Ions (PCI)” air purification technology, which uses plasma discharge to generate cluster ions. The new plasma cluster device releases into the air positive and negative ions, which are harmless to humans and are able to decompose and deactivate airborne substances by chemical reactions. A lot of phenomenological tests of the PCI air purification technology on microbial cells have been conducted. And, in most cases, it has been shown that PCI demonstrate strongly pronounced killing effect. Although, the particular mechanisms of PCI action are still not evident. We studied variations in resistance to PCI among gram-positive airborne microorganisms, as well as some dose-dependent, spatial, cultural and biochemical properties of PCI action in respect of Staphylococcus spp, Enterococcus spp, Micrococcus spp.
The paper deals with the development of the probabilistic approach to the assessment of risk due to lightning. Sources of damage, types of damage and types of loss are defined and, accordingly, the procedure for risk analysis and the way of assessment of different risk components is proposed. The way to evaluate the influence of different protection measures (lightning protection system; shielding of structure, cables and equipment; routing of internal wiring; surge protective device) in reducing such probabilities is considered. The paper has been prepared within the framework of the activity of IEC TC81-WG9/CLC TC81-WG4 directed to prepare the draft IEC 62305-2 Risk Management, in cooperation with the Secretary of IEC/CLC TC81.
In the paper a lightning protection design concept for renewable energy hybrid-systems without power mains connection is described. Based on a risk analysis protection measures against direct strikes and overvoltages are shown in an overview. The design concept is realized exemplarily for the hybrid-system VATALI on the Greek island Crete. VATALI, not lightning protected at that time, was a victim of a lightning strike in the year 2000 causing destructions and damages of some mechanical and electrical components with costs of approx. 60.000 €. The hardware costs for the protection measures were about 15.000 €: about 50% of the costs are due to protection measures against direct strikes, 50% are due to overvoltage protection.
In IEC 61312-2 equations for the assessment of the magnetic fields inside structures due to a direct lightning strike are given. These equations are based on computer simulations for shields consisting of a single-layer steel grid of a given mesh width. Real constructions, however, contain at least two layers of reinforcement steel grids. The objective of this study was to experimentally determine the additional shielding effectiveness of a second reinforcement layer compared to a single-layer grid. To this end, simulated structures were set up in the high current laboratory. The structures consisted of cubic cages of 2 m side length with one or with two reinforcement grids, respectively. The structures were exposed to direct lightning currents representing the variety of anticipated lightning current waveforms. The magnetic fields and their derivatives at several positions inside the structure as well as the voltage between “floor” and “roof” in the center were determined for different current injection points. From these data the improvement of the shielding caused by a second reinforcement layer is derived.
Alle Unternehmen sind vielfältigen Risiken ausgesetzt, die Finanz- und Betriebsbereiche einschließlich Dienstleistungen betreffen können. Die Firmen müssen üblicherweise Risiken eingehen, um im Wettbewerb bestehen zu können. Entscheidend ist, dass man sich über die Risiken bewusst ist, diese einschätzen und kontrollieren kann. Falsche Einschätzungen, Versäumnisse und Fehlentscheidungen können empfindliche finanzielle Schäden bis hin zum Totalverlust nach sich ziehen. Ein effektives Risikomanagement ist heute als wichtiger Sicherheitsfaktor anzusehen und sollte zur strategischen Unternehmensführung gehören. Ein vorausschauendes Risikomanagement beinhaltet, Risiken für das Unternehmen zu kalkulieren. Es liefert Entscheidungsgrundlagen, um diese Risiken zu begrenzen und es macht transparent, welche Risiken sinnvollerweise über Versicherungen abgedeckt werden sollten. Beim Versicherungsmanagement ist jedoch zu bedenken, dass zur Erreichung bestimmter Ziele Versicherungen nicht geeignet sind (z.B. Erhaltung der Lieferfähigkeit). Eintrittswahrscheinlichkeiten bestimmter Risiken lassen sich durch Versicherungen nicht verändern. Bei Unternehmen, die mit umfangreichen elektronischen Einrichtungen produzieren oder Dienstleistungen erbringen (und das sind heutzutage wohl die meisten), muss auch das Risiko durch Blitzeinwirkungen besondere Berücksichtigung finden. Dabei ist zu beachten, dass der Schaden aufgrund der Nicht-Verfügbarkeit der elektronischen Einrichtungen und damit der Produktion bzw. der Dienstleistung und ggf. der Verlust von Daten den Hardware-Schaden an der betroffenen Anlage oft bei weitem übersteigt. Im Blitzschutz gewinnt innovatives Denken in Schadensrisiken langsam an Bedeutung. Risikoanalysen haben die Objektivierung und Quantifizierung der Gefährdung von baulichen Anlagen und ihrer Inhalte durch direkte und indirekte Blitzeinschläge zum Ziel. Seinen Niederschlag hat dieses neue Denken in der neuen deutschen Norm DIN V 0185-2 VDE V 0185 Teil 2 gefunden. Die hier vorgegebene Risikoanalyse gewährleistet, dass ein für alle Beteiligten nachvollziehbares Blitzschutz-Konzept erstellt werden kann, das technisch und wirtschaftlich optimiert ist, d.h. bei möglichst geringem Aufwand den notwendigen Schutz gewährleisten kann. Die sich aus der Risikoanalyse ergebenden Schutzmaßnahmen sind dann in den weiteren Normenteilen der neuen Reihe VDE V 0185 detailliert beschrieben.
1) Module werden die Fahrzeugplattform und den –aufbau in Zukunft weiterhin und in zunehmendem Maße bestimmen. 2) Neue Module und Modulschnittstellen am Fahrzeug werden überdacht und können in der Zukunft erwartet werden. 3) Die Wertschöpfung und der Entwicklungsumfang wird sich vom OEM zum Modullieferanten verlagern. 4) Modulvergaben werden in der Zukunft noch stärker auf Innovation und Kostenreduktion beruhen. 5) Modularisierung des Fahrzeuges heißt ein Aufbrechen der Fahrzeugkarosserie und wird daher von der Beherrschung struktureller Aufgaben sowie der Lösung der (sichtbaren) Modulübergänge bestimmt sein. 6) Neben den Systemintegratoren und den Komponentenspezialisten besetzen die Modullieferanten die erste Lieferantenriege. 7) Der Modullieferant wird neben höchster Fertigungsexpertise ein hohes Maß an (Teil-)fahrzeug-Know-How und Produktentwickler-mentalität bereitstellen.
In: Advances in intelligent computing in engineering : proceedings of the 9.International EG-ICE Workshop ; Darmstadt, (01 - 03 August) 2002 / Martina Schnellenbach-Held ... (eds.) . - Düsseldorf: VDI-Verl., 2002 .- Fortschritt-Berichte VDI, Reihe 4, Bauingenieurwesen ; 180 ; S. 1-35 The paper describes a novel way to support conceptual design in civil engineering. The designer uses semantical tools guaranteeing certain internal structures of the design result but also the fulfillment of various constraints. Two different approaches and corresponding tools are discussed: (a) Visually specified tools with automatic code generation to determine a design structure as well as fixing various constraints a design has to obey. These tools are also valuable for design knowledge specialist. (b) Extensions of existing CAD tools to provide semantical knowledge to be used by an architect. It is sketched how these different tools can be combined in the future. The main part of the paper discusses the concepts and realization of two prototypes following the two above approaches. The paper especially discusses that specific graphs and the specification of their structure are useful for both tool realization projects.
Structural design analyses are conducted with the aim of verifying the exclusion of ratcheting. To this end it is important to make a clear distinction between the shakedown range and the ratcheting range. In cyclic plasticity more sophisticated hardening models have been suggested in order to model the strain evolution observed in ratcheting experiments. The hardening models used in shakedown analysis are comparatively simple. It is shown that shakedown analysis can make quite stable predictions of admissible load ranges despite the simplicity of the underlying hardening models. A linear and a nonlinear kinematic hardening model of two-surface plasticity are compared in material shakedown analysis. Both give identical or similar shakedown ranges. Structural shakedown analyses show that the loading may have a more pronounced effect than the hardening model.
Solar sailcraft provide a wide range of opportunities for high-energy low-cost missions. To date, most mission studies require a rather demanding performance that will not be realized by solar sailcraft of the first generation.
However, even with solar sailcraft of moderate performance, scientifically relevant missions are feasible. This is demonstrated with a Near Earth Asteroid sample return mission and various planetary rendezvous missions.
Im Rahmen eines modernen Blitzschutzsystems für Stahlbeton-Bauten bietet es sich an, die Betonbewehrung zu benutzen: - Sie kann die Funktionen der Ableitungseinrichtungen und des Blitzschutz- Potentialausgleichs bei einem klassischen Gebäude-Blitzschutz übernehmen [1]; - Sie kann, ggf. bei entsprechender Ergänzung, als ein geschlossener Käfig ausgebildet werden und damit eine deutliche Reduzierung der Belastung elektrischer / elektronischer Systeme durch blitzinduzierte elektromagnetische Felder erbringen (LEMP-Schutz [2]). Die Nutzung der Bewehrung ist dabei grundsätzlich gleichermaßen bei Neubauten wie auch bei Ertüchtigungen möglich und sinnvoll. So stellt die Nutzung der Bewehrung beispielsweise im Bereich von Großkraftwerken eine wesentliche Ertüchtigungsmaßnahme für den Blitzschutz elektrischer und elektronischer Einrichtungen dar: - Einerseits wird der Blitzschutz-Potentialausgleich durch den Anschluss metallener Einrichtungen wie Elektronik-Schränke, Kabeltrag-Konstruktionen, Rohrleitungen, etc. an die Bewehrung deutlich verbessert. - Andererseits kann bei größeren Gebäuden die elektromagnetische Schirmwirkung durch die elektrische Überbrückung von vorhandenen Dehnfugen bei Stahlbetonbauten optimiert werden. Diese Dehnfugen sind teilweise nur unzureichend überbrückt, so dass bei Blitzeinschlag in das betreffende oder ein benachbartes Gebäude an Kabelstrecken, die über die Dehnfuge hinwegführen, rel. hohe Spannungen induziert werden können [2, 3]. Die sich um das gesamte Gebäude herumziehende oder zwischen zwei Gebäuden befindliche Dehnfuge muss deshalb im Abstand von maximal einigen Metern überbrückt werden. Im Falle von Blitzschutz-Ertüchtigungen in vorhandenen Gebäuden wird bisher an jeder geplanten Anschlussstelle die Bewehrung großflächig (∅ wenige 10 cm) freigelegt, dort ein elektrischer Anschluss zu dem Bewehrungsstab hergestellt, z.B. mittels eines Erdungsfestpunkts, und dann die Betonoberfläche wieder geschlossen. Je nach prognostizierter Strombelastung wird teilweise versucht, den über den Anschluss fließenden Strom bereits auf mehrere Bewehrungsstäbe zu verteilen. Dazu sind entweder die kreuzenden Stäbe zu verschweißen oder es sind direkt Anschlüsse an zwei Bewehrungsstäbe herzustellen. All dieses bedeutet einen hohen Aufwand bei der Freilegung der Bewehrung und auch wieder bei der Schließung der entstandenen Betonlöcher. Es soll deshalb hier untersucht werden, ob es beispielsweise zum Zwecke des Blitzschutz-Potentialausgleichs und auch zur Überbrückung von Dehnfugen ausreichend ist, den Anschluss an die Bewehrung nach einfachen Verfahren nur jeweils an einen Bewehrungsstab herzustellen. Damit würde der finanzielle und administrative Aufwand an Betonarbeiten deutlich reduziert. Die hier dargestellten Verfahren sind dabei insbesondere für den Einsatz bei Blitzschutz-Ertüchtigungen in bestehenden Gebäuden vorgesehen. Abschließend sollen deshalb die Möglichkeiten zur Prüfung korrekter Anschlüsse, die Grenzen der Verfahren sowie auch die Grenzen der Anwendbarkeit bei Neuanlagen diskutiert werden.