Conference Proceeding
Refine
Institute
Has Fulltext
- yes (15)
Document Type
- Conference Proceeding (15) (remove)
Keywords
- Blitzschutz (15) (remove)
Is part of the Bibliography
- no (15)
IEC Technical Committee 81 is currently creating the new IEC 62305 series of standards on Lightning Protection. Working Group 9 is responsible for Part 2 of this series, which deals with the assessment and management of risk its CDV (Committee Draft for Voting) stage and has been circulated to National Committees for comment. The paper details the development of the Simplified IEC Risk Assessment Calculator software tool as described in Informative Annex J of IEC62305-2 Ed.1/CDV 2. This tool is intended as a simplified implementation of the more rigorous treatment of risk management found in the written document. It is designed to be relatively intuitive for users who wish to obtain an initial assessment of risk sensitivity, but should not be considered a substitute to a full understanding of the methods provided in the standard when dealing with more complicated structures or those where greater risks to personal or system operation are involved.
Large industrial facilities and power plants often require a huge number fo information and control cables between the differnet structures. These I&C-cables can be routed in reinforced concrete cable ducts or in isolated buried cable runs. KTA 2206 is the German lightning protection standard for nuclear power plants. During the last several years considerable effort has been made to revise this standard. Despite the well established principles and design guidelines for the construction of the lightning protection system, this standard puts special emphasis on the coupling of transient overvoltages to I&C-cables.