Conference Proceeding
Refine
Year of publication
- 2024 (14)
- 2023 (37)
- 2022 (48)
- 2021 (52)
- 2020 (55)
- 2019 (93)
- 2018 (74)
- 2017 (86)
- 2016 (72)
- 2015 (78)
- 2014 (55)
- 2013 (74)
- 2012 (81)
- 2011 (70)
- 2010 (68)
- 2009 (64)
- 2008 (48)
- 2007 (44)
- 2006 (53)
- 2005 (29)
- 2004 (25)
- 2003 (22)
- 2002 (25)
- 2001 (18)
- 2000 (14)
- 1999 (15)
- 1998 (21)
- 1997 (10)
- 1996 (7)
- 1995 (6)
- 1994 (4)
- 1993 (11)
- 1992 (6)
- 1991 (3)
- 1990 (2)
- 1989 (5)
- 1988 (3)
- 1987 (1)
- 1986 (2)
- 1985 (4)
- 1984 (3)
- 1983 (3)
- 1981 (2)
- 1980 (1)
- 1979 (1)
- 1978 (3)
- 1977 (2)
- 1975 (3)
- 1974 (1)
- 1973 (3)
Institute
- Fachbereich Elektrotechnik und Informationstechnik (286)
- Fachbereich Energietechnik (226)
- Fachbereich Luft- und Raumfahrttechnik (198)
- Fachbereich Maschinenbau und Mechatronik (190)
- Solar-Institut Jülich (164)
- Fachbereich Medizintechnik und Technomathematik (152)
- IfB - Institut für Bioengineering (114)
- Fachbereich Bauingenieurwesen (103)
- ECSM European Center for Sustainable Mobility (62)
- Fachbereich Wirtschaftswissenschaften (55)
Has Fulltext
- no (1421) (remove)
Document Type
- Conference Proceeding (1421) (remove)
Keywords
- Enterprise Architecture (5)
- Gamification (5)
- Energy storage (4)
- Natural language processing (4)
- Power plants (4)
- hydrogen (4)
- solar sail (4)
- Associated liquids (3)
- Concentrated solar power (3)
- Hybrid energy system (3)
Even though BIM (Building Information Modelling) is successfully implemented in most of the world, it is still in the early stages in Germany, since the stakeholders are sceptical of its reliability and efficiency. The purpose of this paper is to analyse the opportunities and obstacles to implementing BIM for prefabrication. Among all other advantages of BIM, prefabrication is chosen for this paper because it plays a vital role in creating an impact on the time and cost factors of a construction project. The project stakeholders and participants can explicitly observe the positive impact of prefabrication, which enables the breakthrough of the scepticism factor among the small-scale construction companies. The analysis consists of the development of a process workflow for implementing prefabrication in building construction followed by a practical approach, which was executed with two case studies. It was planned in such a way that, the first case study gives a first-hand experience for the workers at the site on the BIM model so that they can make much use of the created BIM model, which is a better representation compared to the traditional 2D plan. The main aim of the first case study is to create a belief in the implementation of BIM Models, which was succeeded by the execution of offshore prefabrication in the second case study. Based on the case studies, the time analysis was made and it is inferred that the implementation of BIM for prefabrication can reduce construction time, ensures minimal wastes, better accuracy, less problem-solving at the construction site. It was observed that this process requires more planning time, better communication between different disciplines, which was the major obstacle for successful implementation. This paper was carried out from the perspective of small and medium-sized mechanical contracting companies for the private building sector in Germany.
We propose a simple parametric OSSD model that describes the variation of the sail film's optical coefficients with time, depending on the sail film's environmental history, i.e., the radiation dose. The primary intention of our model is not to describe the exact behavior of specific film-coating combinations in the real space environment, but to provide a more general parametric framework for describing the general optical degradation behavior of solar sails.
Optimierung des potentiellen Sauerstoffeintrags auf Treppenschussrinnen mit gemäßigter Neigung
(2009)
With the increased interest for interstellar exploration after the discovery of exoplanets and the proposal by Breakthrough Starshot, this paper investigates the optimisation of photon-sail trajectories in Alpha Centauri. The prime objective is to find the optimal steering strategy for a photonic sail to get captured around one of the stars after a minimum-time transfer from Earth. By extending the idea of the Breakthrough Starshot project with a deceleration phase upon arrival, the mission’s scientific yield will be increased. As a secondary objective, transfer trajectories between the stars and orbit-raising manoeuvres to explore the habitable zones of the stars are investigated. All trajectories are optimised for minimum time of flight using the trajectory optimisation software InTrance. Depending on the sail technology, interstellar travel times of 77.6-18,790 years can be achieved, which presents an average improvement of 30% with respect to previous work. Still, significant technological development is required to reach and be captured in the Alpha-Centauri system in less than a century. Therefore, a fly-through mission arguably remains the only option for a first exploratory mission to Alpha Centauri, but the enticing results obtained in this work provide perspective for future long-residence missions to our closest neighbouring star system.
Successful optimization requires an appropriate model of the system under consideration. When selecting a suitable level of detail, one has to consider solution quality as well as the computational and implementation effort. In this paper, we present a MINLP for a pumping system for the drinking water supply of high-rise buildings. We investigate the influence of the granularity of the underlying physical models on the solution quality. Therefore, we model the system with a varying level of detail regarding the friction losses, and conduct an experimental validation of our model on a modular test rig. Furthermore, we investigate the computational effort and show that it can be reduced by the integration of domain-specific knowledge.
Optimization of the reaeration potential on embankment stepped spillways in skimming flow regime
(2008)
To increase pressure to supply all floors of high buildings with water, booster stations, normally consisting of several parallel pumps in the basement, are used. In this work, we demonstrate the potential of a decentralized pump topology regarding energy savings in water supply systems of skyscrapers. We present an approach, based on Mixed-Integer Nonlinear Programming, that allows to choose an optimal network topology and optimal pumps from a predefined construction kit comprising different pump types. Using domain-specific scaling laws and Latin Hypercube Sampling, we generate different input sets of pump types and compare their impact on the efficiency and cost of the total system design. As a realistic application example, we consider a hotel building with 325 rooms, 12 floors and up to four pressure zones.