Refine
Year of publication
Institute
- Fachbereich Bauingenieurwesen (711) (remove)
Document Type
- Article (333)
- Conference Proceeding (139)
- Book (118)
- Part of a Book (86)
- Report (19)
- Doctoral Thesis (6)
- Contribution to a Periodical (2)
- Course Material (2)
- Patent (2)
- Working Paper (2)
Keywords
- Kanalisation (4)
- Wasserbau (4)
- Wasserwirtschaft (4)
- metal structure (4)
- steel (4)
- Aachen / Fachhochschule Aachen / Fachbereich Bauingenieurwesen (3)
- Absolvententreffen (3)
- Alfha.net (3)
- Alumni (3)
- Fließgewässer (3)
Mit steigenden Dämmstandards und höheren Komfortanforderungen der Nutzer gerät die Problematik der sommerlichen Überhitzung zunehmend in den Fokus. Um die Überhitzung möglichst gering zu halten, sind Maßnahmen und Lösungen zu entwickeln, die den potenziellen Kühlbedarf eines Gebäudes vermeiden sowie reduzieren. Im Rahmen des europäischen Forschungsprojektes BATIMASS wurden Techniken untersucht, die die sommerliche Raumtemperatur ohne zusätzliche Kühlung (passiv) oder aber mit energieeffizienter wasserbasierter Flächenkühlung (aktiv) reduzieren und die besonders für Gebäude in Stahl(leicht)bauweise geeignet sind. Dafür wurde die Methodik der thermisch äquivalenten Decke weiterentwickelt, um das thermische Verhalten von Profilblechdecken in Gebäuden für beide Lösungsansätze analysieren zu können. Darüber hinaus wurde der Einsatz von Phasenwechselmaterial (PCM) zur Steigerung der Speicherfähigkeit von leichten Decken mit besonders geringer thermischer Masse in Simulationen sowie im Labor untersucht und bewertet.
Air-water flows can be found in different engineering applications: from nuclear engineering to huge hydraulic structures. In this paper, a single tip fibre optical probe has been used to record high frequency (over 1 MHz) phase functions at different locations of a stepped spillway. These phase functions have been related to the interfacial velocities by means of Artificial Neural Networks (ANN) and the measurements of a classical double tip conductivity probe. Special attention has been put to the input selection and the ANN dimensions. Finally, ANN have shown to be able to link the signal rising times and plateau shapes to the air-water interfacial velocity.
Turbulent dispersion in bounded horizontal jets : RANS capabilities and physical modeling comparison
(2016)
Optical flow estimation is known from Computer Vision where it is used to determine obstacle movements through a sequence of images following an assumption of brightness conservation. This paper presents the first study on application of the optical flow method to aerated stepped spillway flows. For this purpose, the flow is captured with a high-speed camera and illuminated with a synchronized LED light source. The flow velocities, obtained using a basic Horn–Schunck method for estimation of the optical flow coupled with an image pyramid multi-resolution approach for image filtering, compare well with data from intrusive conductivity probe measurements. Application of the Horn–Schunck method yields densely populated flow field data sets with velocity information for every pixel. It is found that the image pyramid approach has the most significant effect on the accuracy compared to other image processing techniques. However, the final results show some dependency on the pixel intensity distribution, with better accuracy found for grey values between 100 and 150.
Application of the optical flow method to velocity determination in hydraulic structure models
(2016)
Sensitivity of turbulent Schmidt number and turbulence model to simulations of jets in crossflow
(2016)
Environmental discharges have been traditionally designed by means of cost-intensive and time-consuming experimental studies. Some extensively validated models based on an integral approach have been often employed for water quality problems, as recommended by USEPA (i.e.: CORMIX). In this study, FLOW-3D is employed for a full 3D RANS modelling of two turbulent jet-to-crossflow cases, including free surface jet impingement. Results are compared to both physical modelling and CORMIX to better assess model performance. Turbulence measurements have been collected for a better understanding of turbulent diffusion's parameter sensitivity. Although both studied models are generally able to reproduce jet trajectory, jet separation downstream of the impingement has been reproduced only by RANS modelling. Additionally, concentrations are better reproduced by FLOW-3D when the proper turbulent Schmidt number is used. This study provides a recommendation on the selection of the turbulence model and the turbulent Schmidt number for future outfall structures design studies.
Self-aeration is traditionally explained by the water turbulent boundary layer outer edge intersection with the free surface. This paper presents a discussion on the commonly accepted hypothesis behind the computation of the critical point of self-aeration in spillway flows and a new formulation is proposed based on the existence of a developing air flow over the free surface. Upstream of the inception point of self-aeration, some surface roughening has been often reported in previous studies which consequently implies some entrapped air transport and air–water flows coupling. Such air flow is proven in this study by presenting measured air velocities and computing the air boundary layer thickness for a 1V:2H smooth chute flow. Additionally, the growth rate of free surface waves has been analysed by means of Ultrasonic Sensors measurements, obtaining also the entrapped air concentration. High-speed camera imaging has been used for qualitative study of the flow perturbations.
Neben dem durch Unfälle und Krankheiten entstehenden menschlichen Leids und der daraus resultierenden moralischen Verpflichtung, sich und seine Mitmenschen vor Schaden zu bewahren, ist der Arbeits- und Gesundheitsschutz auch ein Gebot wirtschaftlichen Handelns, da Arbeitsunfälle und Berufskrankheiten Ausfallzeiten und Kosten verursachen. So gehören Arbeits- und Gesundheitsschutz zu den wichtigen Aufgaben eines Unternehmens.
Kalkulation
(2016)
Das Kapitel behandelt die Kosten- und Preisermittlung, die Kostenvorgabe und Kostenkontrolle.
Der Angebotspreis wird aufgeschlüsselt in die Einzelkosten der Teilleistungen, die Baustellengemeinkosten, die Allgemeinen Geschäftskosten und einen Zuschlag für Wagnis und Gewinn. Auf der Basis der Angebotskalkulation werden die Vorgaben für die Kostenkontrolle entwickelt.
Betriebsorganisation
(2016)
Das Kapitel behandelt, ausgehend von Begriffen und Aufgaben der Betriebsorganisation, die Aufbau- und Ablauforganisation der Bauunternehmung sowie die Gestaltung einer Projekt-organisation. Es folgt eine Darstellung der Managementsysteme für Qualität, Umwelt und Arbeitsschutz, die sich zunehmend als sog. integrierte Managementsysteme (IMS) auch in Bauunternehmen etablieren. Grundlagen des Personalmanagements und des betrieblichen Rechnungswesens, die für eine(n) Baubetriebler(in) relevant sein können, ergänzen das Kap. Betriebsorganisation. Den Abschluss bilden Hinweise zum Berichtswesen der Baustelle.
Schalung und Gerüste
(2016)
Systemschalungen und Systemgerüste haben den Baustellenbetrieb in vielen Bereichen sehr vereinfacht. Dennoch sind Kenntnisse in diesen Feldern für eine erfolgreiche und effektive Bauleitung unverzichtbar. In diesem Kapitel werden Hinweise und Empfehlungen für die Bemessung und Einsatz von Schalungen, Trag- und Arbeitsgerüsten für den Baustellenbetrieb gegeben.
Boden, Baugrube, Verbau
(2016)
Die Lösung den Baugrund betreffender Fragestellungen beginnen i. d. R. mit der Durchführung von Baugrunderkundungen, um alle notwendigen Parameter zu erhalten, die für die Planung und Durchführung von Bauvorhaben notwendig sind. Im Folgenden werden die wichtigsten Erkundungen in Abhängigkeit der erforderlichen Güteklasse der Proben beschrieben und vorgestellt.
Baumaschinen
(2016)
Kosten- und Verfahrensvergleiche können dabei zur Ermittlung des für die Aufgabe geeignetsten Bauverfahren führen. Für die sich daran anschließende Ablaufplanung werden die verschiedenen graphischen sowie rechnerischen Instrumente (Terminliste und Taktplan, Balkenplan, Weg-Zeit-Diagramm und Netzplan) erläutert und anhand von Beispielen vertieft. Schließlich wird ein im Rahmen der Arbeits- und Nachkalkulation vorzunehmender Soll-Ist-Vergleich mit Hilfe des Bauarbeitsschlüssels (BAS) zur Überprüfung der Aufwands- und Leistungswerte dargestellt.
In diesem Kapitel werden die Abrechnungsvorschriften wichtiger ATV kurz, aber umfassend zusammengestellt. Einigen Abrechnungsbestimmungen für Einzelleistungen, die keine Nebenleistungen sind ((siehe DIN 18299 und Abschnitt 4 der jeweiligen ATV), sind mit aufgenommen worden; die ATV enthalten jedoch weitergehende Festlegungen über Nebenleistungen und Besondere Leistungen.
Im Anschluss folgen Hinweise zu den Toleranzen im Hochbau sowie im Straßenbau.