Refine
Year of publication
- 2024 (8)
- 2023 (21)
- 2022 (12)
- 2021 (25)
- 2020 (20)
- 2019 (30)
- 2018 (35)
- 2017 (25)
- 2016 (26)
- 2015 (28)
- 2014 (24)
- 2013 (29)
- 2012 (24)
- 2011 (31)
- 2010 (26)
- 2009 (27)
- 2008 (27)
- 2007 (28)
- 2006 (17)
- 2005 (15)
- 2004 (19)
- 2003 (12)
- 2002 (20)
- 2001 (20)
- 2000 (19)
- 1999 (23)
- 1998 (16)
- 1997 (13)
- 1996 (10)
- 1995 (11)
- 1994 (15)
- 1993 (9)
- 1992 (8)
- 1991 (4)
- 1990 (6)
- 1989 (5)
- 1988 (5)
- 1987 (2)
- 1986 (1)
- 1985 (6)
- 1984 (1)
- 1982 (2)
- 1981 (1)
- 1980 (4)
- 1979 (2)
- 1978 (3)
- 1976 (1)
- 1975 (1)
- 1974 (1)
Institute
- Fachbereich Elektrotechnik und Informationstechnik (718) (remove)
Language
- English (718) (remove)
Document Type
- Article (414)
- Conference Proceeding (234)
- Part of a Book (38)
- Book (23)
- Conference: Meeting Abstract (5)
- Patent (2)
- Conference Poster (1)
- Doctoral Thesis (1)
Keywords
- Enterprise Architecture (5)
- MINLP (5)
- Engineering optimization (4)
- Optimization (3)
- Powertrain (3)
- Technical Operations Research (3)
- Telecommunication (3)
- Competence Developing Games (2)
- Energy efficiency (2)
- Engineering education (2)
Given industrial applications, the costs for the operation and maintenance of a pump system typically far exceed its purchase price. For finding an optimal pump configuration which minimizes not only investment, but life-cycle costs, methods like Technical Operations Research which is based on Mixed-Integer Programming can be applied. However, during the planning phase, the designer is often faced with uncertain input data, e.g. future load demands can only be estimated. In this work, we deal with this uncertainty by developing a chance-constrained two-stage (CCTS) stochastic program. The design and operation of a booster station working under uncertain load demand are optimized to minimize total cost including purchase price, operation cost incurred by energy consumption and penalty cost resulting from water shortage. We find optimized system layouts using a sample average approximation (SAA) algorithm, and analyze the results for different risk levels of water shortage. By adjusting the risk level, the costs and performance range of the system can be balanced, and thus the
system’s resilience can be engineered
Optical constants from the far infrared to the X-ray region: Mg, Al, Cu, Ag, Au, Bi, C, and Al₂O₃
(1975)
Purpose:
At 1.5 T, real-time MRI of joint movement has been shown to be feasible. However, 7 T, provides higher SNR and thus an improved potential for parallel imaging acceleration. The purpose of this work was to build an open, U-shaped eight-channel transmit/receive microstrip coil for 7 T MRI to enable high-resolution and real-time imaging of the moving ankle joint.
Methods:
A U-shaped eight-channel transmit/receive array for the human ankle was built.urn:x-wiley:00942405:mp3399:equation:mp3399-math-0001-parameters and urn:x-wiley:00942405:mp3399:equation:mp3399-math-0002-factor were measured. SAR calculations of different ankle postures were performed to ensure patient safety. Inhomogeneities in the transmit field consequent to the open design were compensated for by the use of static RF shimming. High-resolution and real-time imaging was performed in human volunteers.
Results:
The presented array showed good performance with regard to patient comfort and image quality. High acceleration factors of up to 4 are feasible without visible acceleration artifacts. Reasonable image homogeneity was achieved with RF shimming.
Conclusions:
Open, noncylindrical designs for transmit/receive coils are practical at 7 T and real-time imaging of the moving joint is feasible with the presented coil design.
On obligations in the development process of resilient systems with algorithmic design methods
(2018)
Advanced computational methods are needed both for the design of large systems and to compute high accuracy solutions. Such methods are efficient in computation, but the validation of results is very complex, and highly skilled auditors are needed to verify them. We investigate legal questions concerning obligations in the development phase, especially for technical systems developed using advanced methods. In particular, we consider methods of resilient and robust optimization. With these techniques, high performance solutions can be found, despite a high variety of input parameters. However, given the novelty of these methods, it is uncertain whether legal obligations are being met. The aim of this paper is to discuss if and how the choice of a specific computational method affects the developer’s product liability. The review of legal obligations in this paper is based on German law and focuses on the requirements that must be met during the design and development process.