Refine
Year of publication
Institute
- Fachbereich Bauingenieurwesen (157) (remove)
Language
- English (157) (remove)
Document Type
- Conference Proceeding (75)
- Article (69)
- Report (6)
- Part of a Book (4)
- Book (1)
- Conference Poster (1)
- Habilitation (1)
Keywords
- metal structure (4)
- steel (4)
- industrial research (3)
- iron and steel industry (3)
- materials technology (3)
- research report (3)
- building industry (2)
- building information modelling (2)
- building materials (2)
- energy efficiency (2)
- research project (2)
- resistance of materials (2)
- 20 fossil-fueled power plants (1)
- 3D printing (1)
- Algal Turf Scrubber (1)
- Algal–bacterial bioflm (1)
- Anammox (1)
- BIM (1)
- Biogas (1)
- Circular bioeconomy (1)
- Energy system (1)
- Freshmen (1)
- HVAC (1)
- Hazard assessment (1)
- Hydraulic structures (1)
- Landslide tsunamis (1)
- Large scale tests (1)
- Mainstream (1)
- Methane (1)
- Mixed integer linear programming (MILP) (1)
- Nitrogen removal (1)
- Open channels (1)
- Overland flow (1)
- PIV (1)
- Partial nitritation (1)
- Physical modeling (1)
- Proper Orthogonal Decomposition (1)
- Q-criterion (1)
- Renewable energy (1)
- Sharing mobility (1)
- Similitude (1)
- Smart Building Engineering (1)
- Solitary waves (1)
- Time-series aggregation (1)
- Typical periods (1)
- VOF (1)
- Wastewater (1)
- anammox (1)
- building safety (1)
- building technique (1)
- business models (1)
- ceramics (1)
- coherent structures (1)
- construction (1)
- dam-break (1)
- designs and models (1)
- drag force (1)
- electro mobility (1)
- emote practical training (1)
- energy disspation (1)
- filtration (1)
- food production (1)
- friction (1)
- gas flow (1)
- guide (1)
- hot gas cleanup (1)
- hydraulic modelling (1)
- ingot (1)
- lockdown conditions (1)
- mainstream deammonification (1)
- mobility behaviour (1)
- model performance (1)
- nitrogen elimination (1)
- numerical model (1)
- physical model (1)
- prefabrication (1)
- remote teamwork (1)
- renewable energy (1)
- roleplay (1)
- small and medium scaled companies (1)
- smart building engineering (1)
- smart engineering (1)
- sustainability (1)
- testing (1)
- thermal insulation (1)
- urban farming (1)
- virtual reality (1)
- wastewater (1)
- wave run-up (1)
The worldwide Corona pandemic has severely restricted student projects in the higher semesters of engineering courses. In order not to delay the graduation, a new concept had to be developed for projects under lockdown conditions. Therefore, unused rooms at the university should be digitally recorded in order to develop a new usage concept as laboratory rooms. An inventory of the actual state of the rooms was done first by taking photos and listing up all flaws and peculiarities. After that, a digital site measuring was done with a 360° laser scanner and these recorded scans were linked to a coherent point cloud and transferred to a software for planning technical building services and supporting Building Information Modelling (BIM). In order to better illustrate the difference between the actual and target state, two virtual reality models were created for realistic demonstration. During the project, the students had to go through the entire digital planning phases. Technical specifications had to be complied with, as well as documentation, time planning and cost estimate. This project turned out to be an excellent alternative to on-site practical training under lockdown conditions and increased the students’ motivation to deal with complex technical questions.
In the context of the Corona pandemic and its impact on teaching like digital lectures and exercises a new concept especially for freshmen in demanding courses of Smart Building Engineering became necessary. As there were hardly any face-to-face events at the university, the new teaching concept should enable a good start into engineering studies under pandemic conditions anyway and should also replace the written exam at the end. The students should become active themselves in small teams instead of listening passively to a lecture broadcast online with almost no personal contact. For this purpose, a role play was developed in which the freshmen had to work out a complete solution to the realistic problem of designing, construction planning and implementing a small guesthouse. Each student of the team had to take a certain role like architect, site manager, BIM-manager, electrician and the technitian for HVAC installations. Technical specifications must be complied with, as well as documentation, time planning and cost estimate. The final project folder had to contain technical documents like circuit diagrams for electrical components, circuit diagrams for water and heating, design calculations and components lists. On the other hand construction schedule, construction implementation plan, documentation of the construction progress and minutes of meetings between the various trades had to be submitted as well. In addition to the project folder, a model of the construction project must also be created either as a handmade model or as a digital 3D-model using Computer-aided design (CAD) software. The first steps in the field of Building information modelling (BIM) had also been taken by creating a digital model of the building showing the current planning status in real time as a digital twin. This project turned out to be an excellent training of important student competencies like teamwork, communication skills, and self -organisation and also increased motivation to work on complex technical questions. The aim of giving the student a first impression on the challenges and solutions in building projects with many different technical trades and their points of view was very well achieved and should be continued in the future.
Urban farming is an innovative and sustainable way of food production and is becoming more and more important in smart city and quarter concepts. It also enables the production of certain foods in places where they usually dare not produced, such as production of fish or shrimps in large cities far away from the coast. Unfortunately, it is not always possible to show students such concepts and systems in real life as part of courses: visits of such industry plants are sometimes not possible because of distance or are permitted by the operator for hygienic reasons. In order to give the students the opportunity of getting into contact with such an urban farming system and its complex operation, an industrial urban farming plant was set up on a significantly smaller scale. Therefore, all needed technical components like water aeriation, biological and mechanical filtration or water circulation have been replaced either by aquarium components or by self-designed parts also using a 3D-printer. Students from different courses like mechanical engineering, smart building engineering, biology, electrical engineering, automation technology and civil engineering were involved in this project. This “miniature industrial plant” was also able to start operation and has now been running for two years successfully. Due to Corona pandemic, home office and remote online lectures, the automation of this miniature plant should be brought to a higher level in future for providing a good control over the system and water quality remotely. The aim of giving the student a chance to get to know the operation of an urban farming plant was very well achieved and the students had lots of fun in “playing” and learning with it in a realistic way.
The main objective of the BATIMASS project was to address how the energy balance in relatively lightweight steel buildings can be improved by building in ‘active thermal mass’ (ATM) into the building fabric. This was achieved through concept design, dynamic thermal modelling and testing of a number of potentially viable systems and concepts. A significant programme of thermal simulation modelling was undertaken utilising the thermally equivalent slab (TES) concept to model the passive thermal capacity effect of profiled, composite metal floor decks. It is apparent from the modelling results that thermal mass is a highly complex phenomenon which is highly dependent upon building type, occupancy patterns, climate and many other aspects of the building design and servicing strategy. The ATM systems developed, both conceptually and for prototype testing, focussed on water-cooled composite slabs, the Cofradal floor system and the phase change material (PCM) Energain. In addition to laboratory testing of prototypes, whole building monitoring was undertaken at the Kubik building in Spain and the RWTH test building in Germany. Advanced thermal modelling was also undertaken to estimate the likely benefits of the ATM concept designs developed and for comparison with the test results. In addition to thermal testing, structural tests were conducted on composite floor specimens incorporating embedded water pipes. This Final Report presents the results of the activities carried out under this RFCS contract RFSR CT 2012 00033. The work carried out is reported in six major sections corresponding to the technical Work Packages of the project. Only summaries of the work carried out are provided in this report; all work undertaken is fully reported in the formal project deliverables.
Block ramps are ecologically oriented drop structures with adequate energy dissipation and partially moderate flow velocities. A special case is given with crossbar block ramps, where the upstream and downstream level difference is reduced by a series of basins. To prevent the total structure from failing, the stability of single boulders within the crossbars and the bed material in between must be guaranteed. The present paper addresses the stability of bed material and scour development for various flow regimes. Any bed material erosion may affect the stability of the crossbar boulders, which in turn can result in major damages of the ramp. Therefore new design approaches are developed to choose an appropriate bed material size and to avoid failures of crossbar block ramp structures.
Since several decades, dam-break waves have been of main research interest. Mathematical approaches have been developed by analytical, physical and numerical models within the past 120 years. During the past 10 years, the number of research investigations has increased due to improved measurement techniques as well as significantly increased computer memories and performances. In this context, the present research deals with the initial stage of two-dimensional dam-break waves by comparing physical and numerical model results as well as analytical approaches. High-speed images and resulting particle image velocimetry calculations are thereby compared with the numerical volume-of-fluid (VOF) method, included in the commercial code FLOW-3D. Wave profiles and drag forces on placed obstacles are analysed in detail. Generally, a good agreement between the laboratory and VOF results is found.
Even though BIM (Building Information Modelling) is successfully implemented in most of the world, it is still in the early stages in Germany, since the stakeholders are sceptical of its reliability and efficiency. The purpose of this paper is to analyse the opportunities and obstacles to implementing BIM for prefabrication. Among all other advantages of BIM, prefabrication is chosen for this paper because it plays a vital role in creating an impact on the time and cost factors of a construction project. The project stakeholders and participants can explicitly observe the positive impact of prefabrication, which enables the breakthrough of the scepticism factor among the small-scale construction companies. The analysis consists of the development of a process workflow for implementing prefabrication in building construction followed by a practical approach, which was executed with two case studies. It was planned in such a way that, the first case study gives a first-hand experience for the workers at the site on the BIM model so that they can make much use of the created BIM model, which is a better representation compared to the traditional 2D plan. The main aim of the first case study is to create a belief in the implementation of BIM Models, which was succeeded by the execution of offshore prefabrication in the second case study. Based on the case studies, the time analysis was made and it is inferred that the implementation of BIM for prefabrication can reduce construction time, ensures minimal wastes, better accuracy, less problem-solving at the construction site. It was observed that this process requires more planning time, better communication between different disciplines, which was the major obstacle for successful implementation. This paper was carried out from the perspective of small and medium-sized mechanical contracting companies for the private building sector in Germany.