Refine
Year of publication
- 2024 (14)
- 2023 (5)
- 2022 (12)
- 2021 (13)
- 2020 (14)
- 2019 (28)
- 2018 (16)
- 2017 (14)
- 2016 (35)
- 2015 (26)
- 2014 (11)
- 2013 (17)
- 2012 (30)
- 2011 (23)
- 2010 (23)
- 2009 (27)
- 2008 (21)
- 2007 (29)
- 2006 (39)
- 2005 (18)
- 2004 (20)
- 2003 (20)
- 2002 (8)
- 2001 (9)
- 2000 (17)
- 1999 (12)
- 1998 (13)
- 1997 (5)
- 1996 (14)
- 1995 (13)
- 1994 (9)
- 1993 (11)
- 1992 (11)
- 1991 (7)
- 1990 (4)
- 1989 (4)
- 1988 (10)
- 1987 (7)
- 1986 (5)
- 1985 (8)
- 1984 (8)
- 1983 (4)
- 1982 (3)
- 1981 (3)
- 1980 (5)
- 1979 (5)
- 1978 (3)
- 1977 (2)
- 1976 (2)
- 1975 (2)
- 1974 (2)
- 1972 (1)
- 1971 (1)
- 1969 (1)
Institute
- Fachbereich Bauingenieurwesen (664) (remove)
Has Fulltext
- no (664) (remove)
Document Type
- Article (327)
- Book (117)
- Conference Proceeding (103)
- Part of a Book (86)
- Report (17)
- Doctoral Thesis (6)
- Contribution to a Periodical (2)
- Patent (2)
- Working Paper (2)
- Conference Poster (1)
Keywords
- metal structure (4)
- steel (4)
- industrial research (3)
- iron and steel industry (3)
- materials technology (3)
- research report (3)
- Architektur (2)
- Deutschland (2)
- Haustechnik (2)
- Heizung (2)
Even though BIM (Building Information Modelling) is successfully implemented in most of the world, it is still in the early stages in Germany, since the stakeholders are sceptical of its reliability and efficiency. The purpose of this paper is to analyse the opportunities and obstacles to implementing BIM for prefabrication. Among all other advantages of BIM, prefabrication is chosen for this paper because it plays a vital role in creating an impact on the time and cost factors of a construction project. The project stakeholders and participants can explicitly observe the positive impact of prefabrication, which enables the breakthrough of the scepticism factor among the small-scale construction companies. The analysis consists of the development of a process workflow for implementing prefabrication in building construction followed by a practical approach, which was executed with two case studies. It was planned in such a way that, the first case study gives a first-hand experience for the workers at the site on the BIM model so that they can make much use of the created BIM model, which is a better representation compared to the traditional 2D plan. The main aim of the first case study is to create a belief in the implementation of BIM Models, which was succeeded by the execution of offshore prefabrication in the second case study. Based on the case studies, the time analysis was made and it is inferred that the implementation of BIM for prefabrication can reduce construction time, ensures minimal wastes, better accuracy, less problem-solving at the construction site. It was observed that this process requires more planning time, better communication between different disciplines, which was the major obstacle for successful implementation. This paper was carried out from the perspective of small and medium-sized mechanical contracting companies for the private building sector in Germany.
Holzbau
(2021)
We present first results from a newly developed monitoring station for a closed loop geothermal heat pump test installation at our campus, consisting of helix coils and plate heat exchangers, as well as an ice-store system. There are more than 40 temperature sensors and several soil moisture content sensors distributed around the system, allowing a detailed monitoring under different operating conditions.In the view of the modern development of renewable energies along with the newly concepts known as Internet of Things and Industry 4.0 (high-tech strategy from the German government), we created a user-friendly web application, which will connect the things (sensors) with the open network (www). Besides other advantages, this allows a continuous remote monitoring of the data from the numerous sensors at an arbitrary sampling rate.Based on the recorded data, we will also present first results from numerical simulations, taking into account all relevant heat transport processes.The aim is to improve the understanding of these processes and their influence on the thermal behavior of shallow geothermal systems in the unsaturated zone. This will in turn facilitate the prediction of the performance of these systems and therefore yield an improvement in their dimensioning when designing a specific shallow geothermal installation.
Membrane contactors are a promising alternative for nitrogen removal and recovery from process water compared to other physicochemical and biological sidestream treatment processes. Münster wastewater treatment plant (WWTP) is the first municipal WWTP in Germany operating a full-scale membrane contactor system to improve the nitrogen elimination and recovery efficiency. Factors influencing the operation and membrane performance are investigated in an accompanying research project. Additional operational aspects of the applied membrane modules are investigated in detail using a bench-scale membrane contactor. First results of the full-scale application demonstrate a high nitrogen removal efficiency of >95%.
Different analytical approaches exist to describe the structural substance or wear reserve of sewer systems. The aim is to convert engineering assessments of often complex defect patterns into computational algorithms and determine a substance class for a sewer section or manhole. This analytically determined information is essential for strategic rehabilitation planning processes up to network level, as it corresponds to the most appropriate rehabilitation type and can thus provide decision-making support. Current calculation methods differ clearly from each other in parts, so that substance classes determined by the different approaches are only partially comparable with each other. The objective of the German R&D cooperation project ‘SubKanS’ is to develop a methodology for classifying the specific defect patterns resulting from the interaction of all the individual defects, and their severities and locations. The methodology takes into account the structural substance of sewer sections and manholes, based on real data and theoretical considerations analogous to the condition classification of individual defects. The result is a catalogue of defect patterns and characteristics, as well as associated structural substance classifications of sewer systems (substance classes). The methodology for sewer system substance classification is developed so that the classification of individual defects can be transferred into a substance class of the sewer section or manhole, eventually taking into account further information (e.g. pipe material, nominal diameter, etc.). The result is a validated methodology for automated sewer system substance classification.
Energy saving ordinances requires that buildings must be designed in such a way that the heat transfer surface including the joints is permanently air impermeable. The prefabricated roof and wall panels in lightweight steel constructions are airtight in the area of the steel covering layers. The sealing of the panel joints contributes to fulfil the comprehensive requirements for an airtight building envelope. To improve the airtightness of steel sandwich panels, additional sealing tapes can be installed in the panel joint. The influence of these sealing tapes was evaluated by measurements carried out by the RWTH Aachen University - Sustainable Metal Building Envelopes. Different installation situations were evaluated by carrying out airtightness tests for different joint distances. In addition, the influence on the heat transfer coefficient was also evaluated using the Finite Element Method (FEM). The combination of obtained air volume flow and transmission losses enables to create an "effective heat transfer coefficient" due to transmission and infiltration. This summarizes both effects in one value and is particularly helpful for approximate calculations on energy efficiency.
Die Versorgung von Neubauten soll möglichst weitgehend unabhängig von fossilen Energieträgern erfolgen. Erneuerbare Energien spielen dafür eine gewichtige Rolle. Eine gute Möglichkeit, erneuerbare Energien ohne viel zusätzlichen Aufwand nutzbar zu machen, ist, bereits vorhandenen Komponenten im Gebäude zusätzliche Funktionen zu geben. Hier kann bspw. die Fassade oder das Dach solarthermisch aktiviert oder durch Fotovoltaikmodule ergänzt werden. Auch Tiefgründungen können neben der statischen Funktion noch eine geothermische Funktion zur Aufnahme oder Abgabe von Wärme erhalten. Neben der Erzeugung bietet sich auch für die Verteilung der Wärme oder Kälte im Gebäude die Integration in Bauteile an. Hier kann bspw. der Boden durch eine Fußbodenheizung oder die Decke durch Deckenstrahlplatten aktiviert werden.
Im Rahmen der Veröffentlichung wird auf die thermische Aktivierung von Stahlkomponenten eingegangen. Es wird eine Lösung vorgestellt, die vorgehängte hinterlüftete Stahlfassade (VHF) solarthermisch zu aktivieren. Außerdem werden zwei Möglichkeiten zur geothermischen Aktivierung von Tiefgründungen mittels Stahlpfählen gezeigt. Zuletzt wird ein System zur thermischen Aktivierung von Stahltrapezprofilen an der Decke erläutert, welches Wärme zuführen oder bei Bedarf abführen kann.
Robust estimators for free surface turbulence characterization: A stepped spillway application
(2020)
Robust estimators are parameters insensitive to the presence of outliers. However, they presume the shape of the variables’ probability density function. This study exemplifies the sensitivity of turbulent quantities to the use of classic and robust estimators and the presence of outliers in turbulent flow depth time series. A wide range of turbulence quantities was analysed based upon a stepped spillway case study, using flow depths sampled with Acoustic Displacement Meters as the flow variable of interest. The studied parameters include: the expected free surface level, the expected fluctuation intensity, the depth skewness, the autocorrelation timescales, the vertical velocity fluctuation intensity, the perturbations celerity and the one-dimensional free surface turbulence spectrum. Three levels of filtering were utilised prior to applying classic and robust estimators, showing that comparable robustness can be obtained either using classic estimators together with an intermediate filtering technique or using robust estimators instead, without any filtering technique.
Stahlbau 2
(2020)
Die im Zuge einer Betriebsübergabe anstehende Baumaßnahmen am eigenen Büro- und Produktionsgebäude boten ideale Voraussetzung zur Anwendung einer raum-kreierenden Außenhaut. Mit der elementierten, freistehenden Eichenholz-Fassade wurde ein bis dahin weitgehend funktionales Bauwerk substanzschonend und zugleich optisch ansprechender umgestaltet.
Bei der Entwicklung des Fassadensystems ging es darum die mögliche Dauerhaftigkeit von Holz bei direkter Bewitterung zu maximieren. Gleichzeitig soll gezeigt werden, dass mittels durchdachter Ansätze beim konstruktiven Holzschutz und die Wahl einer geeigneten Holzart langlebige Konstruktionen realisiert werden können.
Schalung und Gerüste
(2019)
Die grundsätzliche Planung von Schalungsaufgaben wird heute in der Regel im Rahmen der Arbeitsvorbereitung von den entsprechenden Stabsabteilungen oder als Serviceleistung von den Schalungsherstellern mit Anwendung von spezieller Software und den technischen Unterlagen für die jeweiligen Schalungsgeräte durchgeführt. Diese Programme und technischen Unterlagen stehen in der Regel auch den Mitarbeitern in der Bauleitung zur Verfügung, werden dort aber eher seltener genutzt. Zur Anwendung auf der Baustelle stellen die Schalungshersteller neben den technischen Unterlagen Bemessungstabellen zur Verfügung, welche die Auswahl und Dimensionierung einzelner Schalungen wesentlich erleichtern.
Die nachfolgend aufgeführten Beispiele aus dem Bereich Schalung und Gerüste beschreiben Aufgaben, die im Baustellenbetrieb auf die Bauleitung zu kommen können und auch ohne Unterstützung einer Stabsabteilung gelöst werden können.
Vermessung
(2019)
Der baurechtliche Vertrag
(2019)
Anhand von kurzen theoretischen Einführungen werden anhand von Beispielen die wesentlichen Aspekte des baurechtlichen Vertrages erläutert. Nach einer Einführung über das Zustandekommen von (Bau-) Verträgen wird die für Streitfälle unerlässliche Dokumentation auf Baustellen erläutert. Hierbei werden Hinweise zur Erstellung von Protokollen, zum E-Mail bei Großprojekten und zur Dokumentation von Stundenlohnarbeiten gegeben. Des Weiteren wird eine Schriftverkehrsliste vorgestellt, die zur Nachverfolgung des Schriftverkehrs bei Großprojekten unerlässlich ist.
Anschließend werden die typischen Vertragsarten vorgestellt, die bei der Abwicklung von Großprojekten zu beachten sind und die Unterschiede werden durch Fallbeispiele erläutert.
Einen Schwerpunkt des Kapitels bilden auftragsnehmerseitige Verzüge sowie mangelbehaftete Leistungen. Hier werden Hinweise gegeben, wie in den entsprechenden Situationen zu reagieren ist.
Baukosten und Finanzierung
(2019)
Boden, Baugrube, Verbau
(2019)
Im folgenden Kapitel werden die wichtigsten geotechnischen Nachweise sowie praxisnahe Beispiele für den Baubetrieb aufgeführt. Es wird im Wesentlichen auf die Bodenbeschreibung und Klassifikation nach DIN 18196 sowie nach DIN 18300 eingegangen, welche sowohl für die weiteren Berechnungen als auch für die Kalkulation von großer Bedeutung sind.
Die aus der Praxis aufgeführten Beispiele verdeutlichen verschiedene Untersuchungs- und Auswertungsmethoden für direkte und indirekte Aufschlüsse, diese enthalten Labor- und Feldversuche, mit denen man die Verdichtbarkeit von Böden auswertet und quantifiziert, sowie viele andere Themenbereiche wie Erddruckberechnungen sowie Spannungs- und Setzungsberechnungen.
Darüber hinaus werden exemplarisch bestimmte Verbauarten bezüglich ihrer Bemessung erläutert. Es wird ebenfalls auf das Thema Wasserhaltung eingegangen und die erforderlichen Maßnahmen beschrieben, um bestimmte Versagensmechanismen - wie z.B. den hydraulischen Grundbruch - zu verhindern.
Arbeitssicherheit
(2019)
Übungsaufgaben und Berechnungen für den Baubetrieb: Klausurvorbereitung mit ausführlichen Lösungen
(2019)
Übungsaufgaben und Berechnungen für den Baubetrieb: Klausurvorbereitung mit ausführlichen Lösungen
(2019)
Betriebsorganisation
(2019)
Übungsaufgaben und Berechnungen für den Baubetrieb: Klausurvorbereitung mit ausführlichen Lösungen
(2019)
Kalkulation
(2019)
Baumaschinen
(2019)
Accurate determination of free-surface dynamics has attracted much research attention during the past decade and has important applications in many environmental and water related areas. In this study, the free-surface dynamics in several turbulent flows commonly found in nature were investigated using a synchronised setup consisting of an ultrasonic sensor and a high-speed video camera. Basic sensor capabilities were examined in dry conditions to allow for a better characterisation of the present sensor model. The ultrasonic sensor was found to adequately reproduce free-surface dynamics up to the second order, especially in two-dimensional scenarios with the most energetic modes in the low frequency range. The sensor frequency response was satisfactory in the sub-20 Hz band, and its signal quality may be further improved by low-pass filtering prior to digitisation. The application of the USS to characterise entrapped air in high-velocity flows is also discussed.
A new formulation for the prediction of free surface dynamics related to the turbulence occurring nearby is proposed. This formulation, altogether with a breakup criterion, can be used to compute the inception of self-aeration in high velocity flows like those occurring in hydraulic structures. Assuming a simple perturbation geometry, a kinematic and a non-linear momentum-based dynamic equation are formulated and forces acting on a control volume are approximated. Limiting steepness is proposed as an adequate breakup criterion. Role of the velocity fluctuations normal to the free surface is shown to be the main turbulence quantity related to self-aeration and the role of the scales contained in the turbulence spectrum are depicted. Surface tension force is integrated accounting for large displacements by using differential geometry for the curvature estimation. Gravity and pressure effects are also contemplated in the proposed formulation. The obtained equations can be numerically integrated for each wavelength, hence resulting in different growth rates and allowing computation of the free surface roughness wavelength distribution. Application to a prototype scale spillway (at the Aviemore dam) revealed that most unstable wavelength was close to the Taylor lengthscale. Amplitude distributions have been also obtained observing different scaling for perturbations stabilized by gravity or surface tension. The proposed theoretical framework represents a new conceptualization of self-aeration which explains the characteristic rough surface at the non-aerated region as well as other previous experimental observations which remained unresolved for several decades.
As with most high-velocity free-surface flows, stepped spillway flows become self-aerated when the drop height exceeds a critical value. Due to the step-induced macro-roughness, the flow field becomes more turbulent than on a similar smooth-invert chute. For this reason, cascades are oftentimes used as re-aeration structures in wastewater treatment. However, for stepped spillways as flood release structures downstream of deoxygenated reservoirs, gas transfer is also of crucial significance to meet ecological requirements. Prediction of mass transfer velocities becomes challenging, as the flow regime differs from typical previously studied flow conditions. In this paper, detailed air-water flow measurements are conducted on stepped spillway models with different geometry, with the aim to estimate the specific air-water interface. Re-aeration performances are determined by applying the absorption method. In contrast to earlier studies, the aerated water body is considered a continuous mixture up to a level where 75% air concentration is reached. Above this level, a homogenous surface wave field is considered, which is found to significantly affect the total air-water interface available for mass transfer. Geometrical characteristics of these surface waves are obtained from high-speed camera investigations. The results show that both the mean air concentration and the mean flow velocity have influence on the mass transfer. Finally, an empirical relationship for the mass transfer on stepped spillway models is proposed.