Refine
Year of publication
Institute
- Fachbereich Bauingenieurwesen (711) (remove)
Document Type
- Article (333)
- Conference Proceeding (139)
- Book (118)
- Part of a Book (86)
- Report (19)
- Doctoral Thesis (6)
- Contribution to a Periodical (2)
- Course Material (2)
- Patent (2)
- Working Paper (2)
Keywords
- Kanalisation (4)
- Wasserbau (4)
- Wasserwirtschaft (4)
- metal structure (4)
- steel (4)
- Aachen / Fachhochschule Aachen / Fachbereich Bauingenieurwesen (3)
- Absolvententreffen (3)
- Alfha.net (3)
- Alumni (3)
- Fließgewässer (3)
Stahlbau
(2015)
Kalkulation
(2016)
Das Kapitel behandelt die Kosten- und Preisermittlung, die Kostenvorgabe und Kostenkontrolle.
Der Angebotspreis wird aufgeschlüsselt in die Einzelkosten der Teilleistungen, die Baustellengemeinkosten, die Allgemeinen Geschäftskosten und einen Zuschlag für Wagnis und Gewinn. Auf der Basis der Angebotskalkulation werden die Vorgaben für die Kostenkontrolle entwickelt.
Kalkulation
(2019)
Dr.-Ing. Oliver Stoschek [u.a.] DHI Wasser und Umwelt GmbH, Syke. 14 S. (S. 45-58). Beitrag zum 2. Aachener Softwaretag in der Wasserwirtschaft <2, 2009, Aachen> Ökologische Modelle zur Berechnung der Temperaturveränderung und den Einfluss von Kühlwasser auf die Wassertemperatur der Elbe. Die vorgelegte Arbeit wurde beauftragt und unterstützt von der ARGE Elbe im Zuge der Neuauflage des Wärmelastplans Elbe.
Die ökologische Umgestaltung der Dhünn in Leverkusen – Ein Beispiel für die praktische Planung
(2009)
Dipl.-Ing. (FH) Dieter Stein M.Sc (Environmental Engineering) - Landschaftsarchitekt AKNW, Grevenbroich. 14 Seiten ( S. 78-91). Beitrag zum 2. Aachener Softwaretag in der Wasserwirtschaft <2, 2009, Aachen>. Zusammenfassung [des Autors] Unter Berücksichtigung vorhandener örtlicher Gegebenheiten und technischer Einrichtungen (wie z.B. Verkehrstrassen, Versorgungsleitungen, Einlaufbauwerke etc.) hat die Dhünn innerhalb der Deiche mehr Bewegungsfreiheit erhalten. Der Hochwasserschutz bleibt dabei weiterhin gewährleistet. Die Gehölzstrukturen im Uferbereich wurden weitgehend erhalten. Dort, wo die Bauarbeiten eine Entfernung von Gehölzen erforderlich machten, wurden die Flächen bewusst einer eigenständigen Entwicklung überlassen. In diesen Bereichen werden sich im Laufe der Zeit von selbst neue Pflanzen und Gehölze ansiedeln. Mit der naturnahen Umgestaltung der Dhünn als "Starthilfe" kann die Natur die weitere Entwicklung übernehmen: Tier- und Pflanzenarten können sich das ehemals kanalartig ausgebaute Gewässer "zurückerobern", Fische und Kleintiere finden Nahrung und Ruheplätze. Für die Menschen entsteht ein wertvoller Erholungsraum mitten in der Stadt. Trotz zahlreicher Akteure und erheblicher Restriktionen konnte das Projekt in relativ kurzer Zeit realisiert werden. Dem Wupperverband (Untere Lichtenplatzer Str. 100; 42289 Wuppertal) und hier vor allem den Projektleitern Herrn Arnim Lützenberger und Herrn Andreas Oberborbeck sei an dieser Stelle besonders für eine hervorragende Zusammenarbeit gedankt.
Abstract des Beitrags zum 1. Aachener Softwaretag in der Wasserwirtschaft <1, 2007, Aachen> 1 S. : Bereits seit Jahrzehnten werden verschiedenste Injektions-Verfahren, welche teilweise aus den Vereinigten Staaten lizenziert wurden, in Deutschland angewendet, um Abwasserkanäle zu ertüchtigen. Die Resultate sind teilweise sehr umstritten, nicht zuletzt aufgrund unzureichender Materialeigenschaften in den Anfangsjahren der Anwendung. Viele Methoden sind darüber völlig aus dem Gebrauch gekommen und haben manchmal das ganze Verfahrensprinzip in Verruf gebracht. Mittlerweile wurden sowohl Verfahren als auch Materialien weiterentwickelt und sind nun in der Lage auch den aktuellen strengen und praxisnahen Testverfahren mittels Säuleninjektionsversuchen zur Beurteilung Umweltverträglichkeit zu genügen. Es wird ein kurzer Überblick über die derzeit am Markt befindlichen/üblichen Regelwerke, Verfahren und Materialien gegeben und die Grenzen und Möglichkeiten im Rahmen der Kanalsanierung aufgezeigt.
Möglichkeiten und Probleme der reflektorlosen Distanzmessung gezeigt am Beispiel des Wild DIOR 3002
(1988)
Der Laserimpuls-Distanzmesser Distomat Wild DI3000 - Messprinzip und Genauigkeitsuntersuchung
(1987)
Vermessung
(2019)
Siebel, Lothar: Bauteile sicher beurteilen: Wärme, Feuchte, Schall. Erkennen der Einflüsse, einfaches Abschätzen und Bewerten in Planung und Ausführung. 1. überarb. Nachdruck / Lothar Siebel. Aachen: LBB 1996. 95 S. : Ill., graph. Darst. (Landesinstitut für Bauwesen und Angewandte Bauschadensforschung NRW : 2 ; 19) ISBN 3-930860-30-9
Schallschutz von Trenndecken
(1991)
The worldwide Corona pandemic has severely restricted student projects in the higher semesters of engineering courses. In order not to delay the graduation, a new concept had to be developed for projects under lockdown conditions. Therefore, unused rooms at the university should be digitally recorded in order to develop a new usage concept as laboratory rooms. An inventory of the actual state of the rooms was done first by taking photos and listing up all flaws and peculiarities. After that, a digital site measuring was done with a 360° laser scanner and these recorded scans were linked to a coherent point cloud and transferred to a software for planning technical building services and supporting Building Information Modelling (BIM). In order to better illustrate the difference between the actual and target state, two virtual reality models were created for realistic demonstration. During the project, the students had to go through the entire digital planning phases. Technical specifications had to be complied with, as well as documentation, time planning and cost estimate. This project turned out to be an excellent alternative to on-site practical training under lockdown conditions and increased the students’ motivation to deal with complex technical questions.
In the context of the Corona pandemic and its impact on teaching like digital lectures and exercises a new concept especially for freshmen in demanding courses of Smart Building Engineering became necessary. As there were hardly any face-to-face events at the university, the new teaching concept should enable a good start into engineering studies under pandemic conditions anyway and should also replace the written exam at the end. The students should become active themselves in small teams instead of listening passively to a lecture broadcast online with almost no personal contact. For this purpose, a role play was developed in which the freshmen had to work out a complete solution to the realistic problem of designing, construction planning and implementing a small guesthouse. Each student of the team had to take a certain role like architect, site manager, BIM-manager, electrician and the technitian for HVAC installations. Technical specifications must be complied with, as well as documentation, time planning and cost estimate. The final project folder had to contain technical documents like circuit diagrams for electrical components, circuit diagrams for water and heating, design calculations and components lists. On the other hand construction schedule, construction implementation plan, documentation of the construction progress and minutes of meetings between the various trades had to be submitted as well. In addition to the project folder, a model of the construction project must also be created either as a handmade model or as a digital 3D-model using Computer-aided design (CAD) software. The first steps in the field of Building information modelling (BIM) had also been taken by creating a digital model of the building showing the current planning status in real time as a digital twin. This project turned out to be an excellent training of important student competencies like teamwork, communication skills, and self -organisation and also increased motivation to work on complex technical questions. The aim of giving the student a first impression on the challenges and solutions in building projects with many different technical trades and their points of view was very well achieved and should be continued in the future.
Urban farming is an innovative and sustainable way of food production and is becoming more and more important in smart city and quarter concepts. It also enables the production of certain foods in places where they usually dare not produced, such as production of fish or shrimps in large cities far away from the coast. Unfortunately, it is not always possible to show students such concepts and systems in real life as part of courses: visits of such industry plants are sometimes not possible because of distance or are permitted by the operator for hygienic reasons. In order to give the students the opportunity of getting into contact with such an urban farming system and its complex operation, an industrial urban farming plant was set up on a significantly smaller scale. Therefore, all needed technical components like water aeriation, biological and mechanical filtration or water circulation have been replaced either by aquarium components or by self-designed parts also using a 3D-printer. Students from different courses like mechanical engineering, smart building engineering, biology, electrical engineering, automation technology and civil engineering were involved in this project. This “miniature industrial plant” was also able to start operation and has now been running for two years successfully. Due to Corona pandemic, home office and remote online lectures, the automation of this miniature plant should be brought to a higher level in future for providing a good control over the system and water quality remotely. The aim of giving the student a chance to get to know the operation of an urban farming plant was very well achieved and the students had lots of fun in “playing” and learning with it in a realistic way.
Baukosten und Finanzierung
(2006)
Kosten- und Verfahrensvergleiche können dabei zur Ermittlung des für die Aufgabe geeignetsten Bauverfahren führen. Für die sich daran anschließende Ablaufplanung werden die verschiedenen graphischen sowie rechnerischen Instrumente (Terminliste und Taktplan, Balkenplan, Weg-Zeit-Diagramm und Netzplan) erläutert und anhand von Beispielen vertieft. Schließlich wird ein im Rahmen der Arbeits- und Nachkalkulation vorzunehmender Soll-Ist-Vergleich mit Hilfe des Bauarbeitsschlüssels (BAS) zur Überprüfung der Aufwands- und Leistungswerte dargestellt.
Bauwirtschaft und Baurecht
(2016)
Die Leistungen der Bauwirtschaft und deren wirtschaftliche Bedeutung in Deutschland werden anhand einer Vielzahl statistischer Daten verdeutlicht. Die im Vergleich zu anderen Wirtschaftsbereichen auftretenden branchenspezifischen Besonderheiten der Bauwirtschaft werden anhand von verschiedenen Kriterien herausgearbeitet. Das Zusammenspiel der einzelnen Akteure des Sektors und die dabei sich ergebenden bzw. zu beachtenden Rechts- und Vertragsgrundlagen werden dargestellt. Aufgrund der meist erheblichen Höhe des eingesetzten Kapitals aufseiten der Auftraggeber, aber auch seitens der Bauunternehmen während der Bauausführung sowie der besonderen Verantwortung der Beratenden Ingenieure werden auch notwendige Formen der Risikoabsicherungen und der in der Branche üblichen und teilweise vorgeschriebenen Versicherungsmöglichkeiten angesprochen. Intensive Beachtung finden auch die Auswirkungen des Öffentlichen Baurechts (Baugesetzbuch, Bauordnung NRW, Baunutzungsverordnung) auf Planung, Bau und Betrieb baulicher Anlagen und der dabei verwendeten Bauprodukte.
Baukosten und Finanzierung
(2016)
Das Gesetz gegen Wettbewerbsbeschränkungen bildet die Grundlage für die Verordnung über die Vergabe öffentlicher Aufträge, aus der sich die Vergabe- und Vertragsordnungen für Freiberufliche Leistungen (VOF), für Lieferungen und Leistungen (VOL) und für Bauleistungen (VOB) ableiten. Die dabei in Frage kommenden Vergabeverfahren und die einzelnen Schwellenwerte gemäß EU-Recht werden detailliert aufbereitet und im Zusammenhang dargestellt.
Die für die Ausgestaltung von Bauverträgen notwendigen Grundlagen des Werkvertragsrecht nach BGB sowie die branchenspezifischen Allgemeinen Geschäftsbedingungen in Form der Vertragsordnung für Bauleistungen (VOB) mit ihren Zusätzlichen und Besonderen Vertragsbedingungen werden intensiv aufbereitet. Das Zustandekommen eines Bauvertrages ergibt sich dann aus der notwendigen Leistungsbeschreibung mit einem Leistungsverzeichnis und verschiedenen Positionen oder in Form einer Funktionalen Leistungsbeschreibung (Beschreibung mit Leistungsprogramm).
Das Auslandsgeschäft der Baubranche (Bauausführende Unternehmen sowie Beratende Ingenieure und Consultants) wird von den jeweils vorliegenden Internationalen Wettbewerbsbedingungen bestimmt, deren Zusammenhänge anhand umfangreicher statistischer Daten und anhand von Beispielen dargestellt werden.
The main objective of the BATIMASS project was to address how the energy balance in relatively lightweight steel buildings can be improved by building in ‘active thermal mass’ (ATM) into the building fabric. This was achieved through concept design, dynamic thermal modelling and testing of a number of potentially viable systems and concepts. A significant programme of thermal simulation modelling was undertaken utilising the thermally equivalent slab (TES) concept to model the passive thermal capacity effect of profiled, composite metal floor decks. It is apparent from the modelling results that thermal mass is a highly complex phenomenon which is highly dependent upon building type, occupancy patterns, climate and many other aspects of the building design and servicing strategy. The ATM systems developed, both conceptually and for prototype testing, focussed on water-cooled composite slabs, the Cofradal floor system and the phase change material (PCM) Energain. In addition to laboratory testing of prototypes, whole building monitoring was undertaken at the Kubik building in Spain and the RWTH test building in Germany. Advanced thermal modelling was also undertaken to estimate the likely benefits of the ATM concept designs developed and for comparison with the test results. In addition to thermal testing, structural tests were conducted on composite floor specimens incorporating embedded water pipes. This Final Report presents the results of the activities carried out under this RFCS contract RFSR CT 2012 00033. The work carried out is reported in six major sections corresponding to the technical Work Packages of the project. Only summaries of the work carried out are provided in this report; all work undertaken is fully reported in the formal project deliverables.