Conference Proceeding
Refine
Year of publication
Institute
- Fachbereich Bauingenieurwesen (139) (remove)
Document Type
- Conference Proceeding (139) (remove)
Keywords
- Kanalisation (4)
- Aachen / Fachhochschule Aachen / Fachbereich Bauingenieurwesen (3)
- Absolvententreffen (3)
- Alfha.net (3)
- Alumni (3)
- Fließgewässer (3)
- Geodatenbank (3)
- Geodatenhaltung (3)
- Geoinformationen (3)
- Geoinformationssystem (3)
Is part of the Bibliography
- no (139)
Mischwassereinleitungen in Gewässer nach BWK Merkblatt M3 - Vorteile des detaillierten Nachweises
(2009)
Dipl.-Ing. Brigitte Huber und Dr.-Ing. Gerd Demny - Wasserverband Eifel Rur, Düren. 16 Seiten ( S. 59-74). Beitrag zum 2. Aachener Softwaretag in der Wasserwirtschaft <2, 2009, Aachen> Zusammenfassung [der Autoren] Für das städtisch geprägte Einzugsgebiet des Broicher Baches sind ein vereinfachter und ein detaillierter Nachweis nach BWK-M3 durchgeführt worden. Dabei zeigt sich, dass die Methodik des vereinfachten Nachweises nicht geeignet ist, um eine realitätsnahe Abbildung der einleitungsgeprägten Abflüsse des Gewässers zu erhalten. Dies ist insbesondere auf die Vernachlässigung von Wellentranslation und -retention im Gerinne zurückzuführen. Die dadurch entstehende Fehleinschätzung der Abflussverhältnisse versperrt den Blick auf eine situationsgerechte Maßnahmenplanung. Der mit Hilfe eines NA-Modells geführte detaillierte Nachweis ist zwar in der Erstellung aufwändiger, zeichnet aber ein reales Bild der Abflusserhöhung durch Einleitungen. Mit Hilfe des Modells können die wesentlichen Einflüsse schnell lokalisiert und zielführende Maßnahmenvarianten identifiziert werden. In dem hier vorgestellten Beispiel des Broicher Baches können die ursprünglich identifizierten acht Maßnahmen auf eine reduziert werden. Das Gesamtvolumen der erforderlichen Rückhaltungen wird um die Hälfte verringert. Der Vergleich beider Nachweismethoden legt nach Ansicht der Autoren nahe, den vereinfachten Nachweis höchstens für eine erste Einschätzung des Maßnahmenbedarfs anzuwenden. Die Maßnahmenidentifikation und -dimensionierung sollte grundsätzlich mit der detaillierten Nachweismethode durchgeführt werden, die auf einem entsprechenden NA-Modell basiert. Dies gilt insbesondere für Gewässerstrecken, deren Abfluss durch mehrere, hintereinander liegende Einleitungsstellen geprägt ist.
In: Alfha.net / Sektion Bauingenieurwesen: 1. [Erster] Erfahrungsaustausch : Absolventen des Fachbereichs Bauingenieurwesens berichten. 13. Oktober 2006. S. 16-17 Der Umbau des Aachener Buschtunnels im Rahmen des europäischen Hochgeschwindigkeitsschienennetzes wird im sogenannten "Neuen Österreichischen Tunnelbauverfahren (NOeT)", also ein Ausbau in Kalotte, Strosse und Sohle durchgeführt.
The replacement of existing spillway crests or gates with labyrinth weirs is a proven techno-economical means to increase the discharge capacity when rehabilitating existing structures. However, additional information is needed regarding energy dissipation of such weirs, since due to the folded weir crest, a three-dimensional flow field is generated, yielding more complex overflow and energy dissipation processes. In this study, CFD simulations of labyrinth weirs were conducted 1) to analyze the discharge coefficients for different discharges to compare the Cd values to literature data and 2) to analyze and improve energy dissipation downstream of the structure. All tests were performed for a structure at laboratory scale with a height of approx. P = 30.5 cm, a ratio of the total crest length to the total width of 4.7, a sidewall angle of 10° and a quarter-round weir crest shape. Tested headwater ratios were 0.089 ≤ HT/P ≤ 0.817. For numerical simulations, FLOW-3D Hydro was employed, solving the RANS equations with use of finite-volume method and RNG k-ε turbulence closure. In terms of discharge capacity, results were compared to data from physical model tests performed at the Utah Water Research Laboratory (Utah State University), emphasizing higher discharge coefficients from CFD than from the physical model. For upstream heads, some discrepancy in the range of ± 1 cm between literature, CFD and physical model tests was identified with a discussion regarding differences included in the manuscript. For downstream energy dissipation, variable tailwater depths were considered to analyze the formation and sweep-out of a hydraulic jump. It was found that even for high discharges, relatively low downstream Froude numbers were obtained due to high energy dissipation involved by the three-dimensional flow between the sidewalls. The effects of some additional energy dissipation devices, e.g. baffle blocks or end sills, were also analyzed. End sills were found to be non-effective. However, baffle blocks with different locations may improve energy dissipation downstream of labyrinth weirs.
Even though BIM (Building Information Modelling) is successfully implemented in most of the world, it is still in the early stages in Germany, since the stakeholders are sceptical of its reliability and efficiency. The purpose of this paper is to analyse the opportunities and obstacles to implementing BIM for prefabrication. Among all other advantages of BIM, prefabrication is chosen for this paper because it plays a vital role in creating an impact on the time and cost factors of a construction project. The project stakeholders and participants can explicitly observe the positive impact of prefabrication, which enables the breakthrough of the scepticism factor among the small-scale construction companies. The analysis consists of the development of a process workflow for implementing prefabrication in building construction followed by a practical approach, which was executed with two case studies. It was planned in such a way that, the first case study gives a first-hand experience for the workers at the site on the BIM model so that they can make much use of the created BIM model, which is a better representation compared to the traditional 2D plan. The main aim of the first case study is to create a belief in the implementation of BIM Models, which was succeeded by the execution of offshore prefabrication in the second case study. Based on the case studies, the time analysis was made and it is inferred that the implementation of BIM for prefabrication can reduce construction time, ensures minimal wastes, better accuracy, less problem-solving at the construction site. It was observed that this process requires more planning time, better communication between different disciplines, which was the major obstacle for successful implementation. This paper was carried out from the perspective of small and medium-sized mechanical contracting companies for the private building sector in Germany.
Dipl.-Ing. Stefan Overkamp - GISWORKS GbR, Velbert. 11 S. (S. 7-17). Beitrag zum 2. Aachener Softwaretag in der Wasserwirtschaft <2, 2009, Aachen> Aus der Gliederung: 1 Geoinformationssysteme 2 Anforderungen an eine kommunale Geodateninfrastruktur (GDI) 3 Komponenten einer GDI 3.1 Geodatenmanagement 3.2 Geodatenhaltung 3.3 High-End-GIS 3.4 intraGIS 4 GISWORKS 5 Weiterführende Informationen
In: Alfha.net / Sektion Bauingenieurwesen: 1. [Erster] Erfahrungsaustausch : Absolventen des Fachbereichs Bauingenieurwesens berichten. 13. Oktober 2006. S. 19-20. Zusammenfassung des Vortrags: Prozessanalyse und Revision beim Umbau des Flughafens Hamburg, Beratung von Bauunternehmen, Sachverständigentätigkeit
Energiebilanzen und -potenziale von Abwasseranlagen : Vorstellung neuer Untersuchungsvorhaben in NRW
(2010)
Dr.-Ing. Raju M. Rohde , Dorsch Consult Wasser und Umwelt GmbH, München mit 32 Folien (S. 103-134). Beitrag zum 1. Aachener Softwaretag in der Wasserwirtschaft <1, 2007, Aachen>. Das System BaSYS.L.E.O. Ganglinien-Volumen-Methode Hydrodynamische Kanalnetzberechnung Hydraulische Objekte Hydrodynamische Schmutzfrachtberechnung