Article
Refine
Year of publication
- 2018 (13) (remove)
Institute
- Fachbereich Elektrotechnik und Informationstechnik (13) (remove)
Has Fulltext
- no (13)
Document Type
- Article (13) (remove)
Keywords
- Booster Stations (1)
- Buffering Capacity (1)
- Chance Constraint (1)
- EBSCO Discovery Service (1)
- Engineering Application (1)
- Forschungsprozess (1)
- IBM Watson Explorer (1)
- Literaturanalyse (1)
- MINLP (1)
- Pump System (1)
Is part of the Bibliography
- no (13)
On obligations in the development process of resilient systems with algorithmic design methods
(2018)
Advanced computational methods are needed both for the design of large systems and to compute high accuracy solutions. Such methods are efficient in computation, but the validation of results is very complex, and highly skilled auditors are needed to verify them. We investigate legal questions concerning obligations in the development phase, especially for technical systems developed using advanced methods. In particular, we consider methods of resilient and robust optimization. With these techniques, high performance solutions can be found, despite a high variety of input parameters. However, given the novelty of these methods, it is uncertain whether legal obligations are being met. The aim of this paper is to discuss if and how the choice of a specific computational method affects the developer’s product liability. The review of legal obligations in this paper is based on German law and focuses on the requirements that must be met during the design and development process.
Given industrial applications, the costs for the operation and maintenance of a pump system typically far exceed its purchase price. For finding an optimal pump configuration which minimizes not only investment, but life-cycle costs, methods like Technical Operations Research which is based on Mixed-Integer Programming can be applied. However, during the planning phase, the designer is often faced with uncertain input data, e.g. future load demands can only be estimated. In this work, we deal with this uncertainty by developing a chance-constrained two-stage (CCTS) stochastic program. The design and operation of a booster station working under uncertain load demand are optimized to minimize total cost including purchase price, operation cost incurred by energy consumption and penalty cost resulting from water shortage. We find optimized system layouts using a sample average approximation (SAA) algorithm, and analyze the results for different risk levels of water shortage. By adjusting the risk level, the costs and performance range of the system can be balanced, and thus the
system’s resilience can be engineered
Resilience as a concept has found its way into different disciplines to describe the ability of an individual or system to withstand and adapt to changes in its environment. In this paper, we provide an overview of the concept in different communities and extend it to the area of mechanical engineering. Furthermore, we present metrics to measure resilience in technical systems and illustrate them by applying them to load-carrying structures. By giving application examples from the Collaborative Research Centre (CRC) 805, we show how the concept of resilience can be used to control uncertainty during different stages of product life.
The Carologistics team participates in the RoboCup Logistics League for the seventh year. The RCLL requires precise vision,
manipulation and path planning, as well as complex high-level decision
making and multi-robot coordination. We outline our approach with an
emphasis on recent modifications to those components.
The team members in 2018 are David Bosen, Christoph Gollok, Mostafa
Gomaa, Daniel Habering, Till Hofmann, Nicolas Limpert, Sebastian Schönitz,
Morian Sonnet, Carsten Stoffels, and Tarik Viehmann.
This paper is based on the last year’s team description.
Wireless CAN
(2018)
In modernen elektronischen und mechatronischen Systemen, z. B. im industriellen oder automobil Bereich, kommunizieren eingebettete Steuergeräte und Sensoren vielfach über Bussysteme wie CAN oder LIN. Die Kommunikation findet in der Regel drahtgebunden statt, so dass der Kabelbaum für die Kommunikation sehr groß werden kann. Daher ist es naheliegend, Leitungen und dazugehörige Stecker, z. B. für nicht-sicherheitskritische Komfortsysteme, einzusparen und diese durch gerichtete Funkstrecken für kurze Entfernungen zu ersetzen. Somit könnten Komponenten wie ECUs oder Sensoren kabel- und steckerlos in ein Bussystem integriert werden. Zudem ist eine einfache galvanische und mechanische Trennung zu erreichen. Funkübertragung wird bei diesen Bussystemen derzeit nicht eingesetzt, da insbesondere die Echtzeitfähigkeit und die Robustheit der vorhandenen Funksysteme nicht den Anforderungen der Anwendungen entspricht. Zudem sind bestehende Funksysteme wie WLAN oder Bluetooth im Vergleich zur konventionellen Verkabelung teuer und es besteht hierbei die Möglichkeit, dass sie ausspioniert werden können und so sensible Daten entwendet werden können. In dieser Arbeit wird eine alternative Realisierung zu den bestehenden Funksystemen vorgestellt, die aus wenigen Komponenten aufzubauen ist. Es ist eine protokolllose, echtzeitfähige Übertragung möglich und somit die transparente Integration in ein Bussystem wie CAN.