Refine
Year of publication
Institute
- Fachbereich Energietechnik (1116) (remove)
Language
- English (589)
- German (524)
- Multiple languages (1)
- Dutch (1)
- Spanish (1)
Document Type
- Article (609)
- Conference Proceeding (259)
- Book (126)
- Part of a Book (84)
- Doctoral Thesis (10)
- Conference: Meeting Abstract (7)
- Report (7)
- Other (4)
- Talk (3)
- Diploma Thesis (2)
Keywords
- Blitzschutz (18)
- Lightning protection (11)
- Earthquake (5)
- Diversity Management (4)
- Energy storage (4)
- Power plants (4)
- Risikomanagement (4)
- Seismic design (4)
- reinforced concrete (4)
- Associated liquids (3)
Surgical clip applicator
(1996)
This paper describes two courses on
simulation methods for graduate students:
“Simulation Methods” and “Simulation and
Optimization in Virtual Engineering” The
courses were planned to teach young engineers
how to work with simulation software as well as
to understand the necessary mathematical background.
As simulation software COMSOL is
used. The main philosophy was to combine
theory and praxis in a way that motivates the
students. In addition “soft skills” should be
improved. This was achieved by project work as
final examination. As underlying didactical principle
the ideas of Bloom’s revised taxonomy
were followed. The paper basically focusses on
educational aspects, e.g. how to structure the
course, plan the exercises, organize the project
work and include practical COMSOL examples.
Technical assessment of Brayton cycle heat pumps for the integration in hybrid PV-CSP power plants
(2022)
The hybridization of Concentrated Solar Power (CSP) and Photovoltaics (PV) systems is a promising approach to reduce costs of solar power plants, while increasing dispatchability and flexibility of power generation. High temperature heat pumps (HT HP) can be utilized to boost the salt temperature in the thermal energy storage (TES) of a Parabolic Trough Collector (PTC) system from 385 °C up to 565 °C. A PV field can supply the power for the HT HP, thus effectively storing the PV power as thermal energy. Besides cost-efficiently storing energy from the PV field, the power block efficiency of the overall system is improved due to the higher steam parameters. This paper presents a technical assessment of Brayton cycle heat pumps to be integrated in hybrid PV-CSP power plants. As a first step, a theoretical analysis was carried out to find the most suitable working fluid. The analysis included the fluids Air, Argon (Ar), Nitrogen (N2) and Carbon dioxide (CO2). N2 has been chosen as the optimal working fluid for the system. After the selection of the ideal working medium, different concepts for the arrangement of a HT HP in a PV-CSP hybrid power plant were developed and simulated in EBSILON®Professional. The concepts were evaluated technically by comparing the number of components required, pressure losses and coefficient of performance (COP).
Technisches Zeichnen : Lösungsvorschläge für das Selbststudium. (Berichte aus dem Maschinenbau)
(2012)
One of the most important parameters in a burning chamber - in power stations, in waste to energy plants - is the temperature. This temperature is in the range of 700-1500 °C - one of the most advanced measuring methods being the acoustic pyrometry with the possibility of producing temperature mapping in one level of the burning chamber - comparable to computer tomography. The results of these measurements discussed in the presentation can be used - to fulfil the legal requirements in the FRG or in the EU - to equalise the temperature in one level of the burning chamber to optimise the steam production (better efficiency of the plant) and to minimise the production of temperature controlled flue gas components (NO, CO a. o.) - to control the SNCR-process if used.
The Solar-Institute Jülich (SIJ) has initiated the construction of the first and only German solar tower power plant and is now involved in the accompanying research. The power plant for experimental and demonstration purposes in the town of Jülich started supplying electric energy in the beginning of 2008. The central receiver plant features as central innovation an open volumetric receiver, consisting of porous ceramic elements that simultaneously absorb the concentrated sunlight and transfer the heat to ambient air passing through the pores so that an average temperature of 680°C is reached. The subsequent steam cycle generates up to 1.5 MWe. A main field of research at the SIJ is the optimization of the absorber structures. To analyze the capability of new absorber specimens a special test facility was developed and set up in the laboratory. A high-performance near-infrared radiator offers for single test samples a variable and repeatable beam with a power of up to 320 kW/m² peak. The temperatures achieved on the absorber surface can reach more than 1000°C. To suck ambient air through the open absorber - like on the tower - it is mounted on a special blower system. An overview about the test facility and some recent results will be presented.
Textile reinforced concrete. Part I: Process model for collaborative research and development
(2003)
The adsorption of fluor-carbon complexes on GaAs(110) studied by electron energy loss spectroscopy
(1986)
With proven impact of statistical fracture analysis on fracture classifications, it is desirable to minimize the manual work and to maximize repeatability of this approach. We address this with an algorithm that reduces the manual effort to segmentation, fragment identification and reduction. The fracture edge detection and heat map generation are performed automatically. With the same input, the algorithm always delivers the same output. The tool transforms one intact template consecutively onto each fractured specimen by linear least square optimization, detects the fragment edges in the template and then superimposes them to generate a fracture probability heat map.
We hypothesized that the algorithm runs faster than the manual evaluation and with low (< 5 mm) deviation. We tested the hypothesis in 10 fractured proximal humeri and found that it performs with good accuracy (2.5 mm ± 2.4 mm averaged Euclidean distance) and speed (23 times faster). When applied to a distal humerus, a tibia plateau, and a scaphoid fracture, the run times were low (1–2 min), and the detected edges correct by visual judgement. In the geometrically complex acetabulum, at a run time of 78 min some outliers were considered acceptable. An automatically generated fracture probability heat map based on 50 proximal humerus fractures matches the areas of high risk of fracture reported in medical literature.
Such automation of the fracture analysis method is advantageous and could be extended to reduce the manual effort even further.
Cryopumps without liquid nitrogen shielding are used to provide a vacuum of 10−6 torr in the spectrometer. The vacuum system is subdivided in three sections that can be separated by valves.
The first section (scattering chamber) has a volume of 60 l, two rotation transmissions with 35 cm dia and a sliding seal that allows a rotation of 160° without deteriorating the vacuum. The second section includes the vacuum chambers inside the magnets with 6 × 80 cm cross-section and a length of 1200 cm. The third section (detector box) has a volume of 4300 l and contains a moveable detector system. The gas inside the detector with a pressure of 760 torr is separated from the vacuum by a 15 μm mylar foil with an area of 300 cm2. The detector box can be valved off by a valve with the dimension of 10 × 100 cm.
The layout of system is given. The instrumentation and the interlock system are described. First experiences with this system are presented.
The Effect of Openings on Out-of-Plane Capacity of Masonry Infilled Reinforced Concrete Frames
(2018)
The proposed Den Haag Zuidwest district heating system of the city of The Hague consists of a deep doublet in a Jurassic sandstone layer that is designed for a production temperature of 75 °C and a reinjection temperature of 40 °C at a flow rate of 150 m3 h−1. The prediction of reservoir temperature and production behavior is crucial for success of the proposed geothermal doublet. This work presents the results of a study of the important geothermal and geohydrological issues for the doublet design. In the first phase of the study, the influences of the three-dimensional (3D) structures of anticlines and synclines on the temperature field were examined. A comprehensive petrophysical investigation was performed to build a large scale 3D-model of the reservoir. Several bottomhole temperatures (BHTs), as well as petrophysical logs were used to calibrate the model using thermal conductivity measurements on 50 samples from boreholes in different lithological units in the study area. Profiles and cross sections extracted from the calculated temperature field were used to study the temperature in the surrounding areas of the planned doublet. In the second phase of the project, a detailed 3D numerical reservoir model was set up, with the aim of predicting the evolution of the producer and injector temperatures, and the extent of the cooled area around the injector. The temperature model from the first phase provided the boundary conditions for the reservoir model. Hydraulic parameters for the target horizons, such as porosity and permeability, were taken from data available from the nearby exploration wells. The simulation results are encouraging as no significant thermal breakthrough is predicted. For the originally planned location of the producer, the extracted water temperature is predicted to be around 79 °C, with an almost negligible cooling in the first 50 years of production. When the producer is located shallower parts of the reservoir, the yield water temperatures is lower, starting at ≈76 °C and decreasing to ≈74 °C after 50 years of operation. This comparatively larger decrease in temperature with time is caused by the structural feature of the reservoir, namely a higher dip causes the cooler water to easily move downward. In view of the poor reservoir data, the reservoir simulation model is constructed to allow iterative updates using data assimilation during planned drilling, testing, and production phases. Measurements during an 8 h pumping test carried out in late 2010 suggest that a flow rate of 150 m3 h−1 is achievable. Fluid temperatures of 76.5 °C were measured, which is very close to the predicted value.