Refine
Year of publication
- 2015 (176) (remove)
Document Type
- Article (83)
- Conference Proceeding (71)
- Part of a Book (17)
- Doctoral Thesis (3)
- Patent (1)
- Report (1)
Language
- English (176) (remove)
Keywords
- Attitude dynamics (1)
- Booster Station (1)
- Carsharing (1)
- Charging stations (1)
- Discrete Optimisation (1)
- Discrete Optimization (1)
- E-carsharing (1)
- E-mobility (1)
- Efficiency (1)
- Electrical vehicle (1)
- Energy (1)
- Fully connected car (1)
- Gamma distribution (1)
- Goodness-of-fit test (1)
- Gossamer structures (1)
- Hydraulic structures (1)
- Independence test (1)
- Inductive charging (1)
- Information and communication technology (1)
- Integrated mobility (1)
Institute
- Fachbereich Medizintechnik und Technomathematik (61)
- INB - Institut für Nano- und Biotechnologien (35)
- IfB - Institut für Bioengineering (32)
- Fachbereich Elektrotechnik und Informationstechnik (28)
- Fachbereich Luft- und Raumfahrttechnik (24)
- Fachbereich Chemie und Biotechnologie (22)
- Fachbereich Maschinenbau und Mechatronik (16)
- Fachbereich Energietechnik (12)
- Fachbereich Bauingenieurwesen (10)
- MASKOR Institut für Mobile Autonome Systeme und Kognitive Robotik (10)
- Fachbereich Wirtschaftswissenschaften (5)
- Solar-Institut Jülich (5)
- Fachbereich Architektur (2)
- Institut fuer Angewandte Polymerchemie (2)
- Sonstiges (1)
The conference center darmstadtium in Darmstadt is a prominent example of energy efficient buildings. Its heating system consists of different source and consumer circuits connected by a Zortström reservoir. Our goal was to reduce the energy costs of the system as much as possible. Therefore, we analyzed its supply circuits. The first step towards optimization is a complete examination of the system: 1) Compilation of an object list for the system, 2) collection of the characteristic curves of the components, and 3) measurement of the load profiles of the heat and volume-flow demand. Instead of modifying the system manually and testing the solution by simulation, the second step was the creation of a global optimization program. The objective was to minimize the total energy costs for one year. We compare two different topologies and show opportunities for significant savings.