Refine
Year of publication
Document Type
- Conference Proceeding (46)
- Article (13)
- Part of a Book (2)
- Doctoral Thesis (1)
- Report (1)
Keywords
- Energy storage (4)
- Power plants (4)
- Associated liquids (3)
- Concentrated solar power (3)
- Hybrid energy system (3)
- Electricity generation (2)
- Solar thermal technologies (2)
- Acceptance tests (1)
- Camera system (1)
- Ceramics (1)
- Cloud passages (1)
- Control optimization (1)
- DNI forecast (1)
- DNI forecasting (1)
- Decision theory (1)
- Direct normal irradiance forecast (1)
- District data model (1)
- District energy planning platform (1)
- Dynamic simulation (1)
- Electrochemistry (1)
Institute
- Solar-Institut Jülich (58)
- Fachbereich Energietechnik (23)
- ECSM European Center for Sustainable Mobility (16)
- Kommission für Forschung und Entwicklung (14)
- Fachbereich Bauingenieurwesen (2)
- Arbeitsstelle fuer Hochschuldidaktik und Studienberatung (1)
- Digitalisierung in Studium & Lehre (1)
- Fachbereich Elektrotechnik und Informationstechnik (1)
- Fachbereich Luft- und Raumfahrttechnik (1)
- Institut fuer Angewandte Polymerchemie (1)
This chapter introduces performance and acceptance testing and describes state-of-the-art tools, methods, and instruments to assess the plant performance or realize plant acceptance testing. The status of the development of standards for performance assessment is given.
Das Ziel des INTERREG-Projektes „SHAREuregio“ (FKZ: 34.EFRE-0300134)
ist es, grenzüberschreitende Mobilität in der Euregio Rhein-Maas-Nord zu
ermöglichen und zu fördern. Dazu soll ein elektromobiles Car- und Bikesharing-
System entwickelt und in der Stadt Mönchengladbach, im Kreis Viersen
sowie in den Gemeinden Roermond und Venlo (beide NL) zusammen mit den
Partnern Wirtschaftsförderung Mönchengladbach, Wirtschaftsförderung für den
Kreis Viersen, NEW AG, Goodmoovs (NL), Greenflux (NL) und der FH Aachen
implementiert werden. Zunächst richtet sich das Angebot, bestehend aus 40
Elektroautos und 40 Elektrofahrrädern, an Unternehmen und wird nach einer
Erprobungsphase, mit einer größeren Anzahl an Fahrzeugen, auch für Privatpersonen
verfügbar gemacht werden. Die Fahrzeuge stehen bei den jeweiligen
Anwendungspartnern in Deutschland und den Niederlanden.
Im Rahmen dieses Projektes hat die FH Aachen „FlexSHARE“ entwickelt
– ein methodisches Framework zur innovativen Gestaltung urbaner Sharing-
Angebote. Das Framework ermöglicht es, anhand von messbaren Kenngrößen,
bedarfsgerechte und auf die Region abgestimmte Sharing-Systeme zu entwickeln.
In the past, CSP and PV have been seen as competing technologies. Despite massive reductions in the electricity generation costs of CSP plants, PV power generation is - at least during sunshine hours - significantly cheaper. If electricity is required not only during the daytime, but around the clock, CSP with its inherent thermal energy storage gets an advantage in terms of LEC. There are a few examples of projects in which CSP plants and PV plants have been co-located, meaning that they feed into the same grid connection point and ideally optimize their operation strategy to yield an overall benefit. In the past eight years, TSK Flagsol has developed a plant concept, which merges both solar technologies into one highly Integrated CSP-PV-Hybrid (ICPH) power plant. Here, unlike in simply co-located concepts, as analyzed e.g. in [1] – [4], excess PV power that would have to be dumped is used in electric molten salt heaters to increase the storage temperature, improving storage and conversion efficiency. The authors demonstrate the electricity cost sensitivity to subsystem sizing for various market scenarios, and compare the resulting optimized ICPH plants with co-located hybrid plants. Independent of the three feed-in tariffs that have been assumed, the ICPH plant shows an electricity cost advantage of almost 20% while maintaining a high degree of flexibility in power dispatch as it is characteristic for CSP power plants. As all components of such an innovative concept are well proven, the system is ready for commercial market implementation. A first project is already contracted and in early engineering execution.