Refine
Year of publication
- 2024 (13)
- 2023 (5)
- 2022 (11)
- 2021 (13)
- 2020 (14)
- 2019 (28)
- 2018 (16)
- 2017 (14)
- 2016 (35)
- 2015 (27)
- 2014 (12)
- 2013 (17)
- 2012 (30)
- 2011 (24)
- 2010 (24)
- 2009 (38)
- 2008 (23)
- 2007 (41)
- 2006 (51)
- 2005 (18)
- 2004 (20)
- 2003 (20)
- 2002 (8)
- 2001 (9)
- 2000 (17)
- 1999 (13)
- 1998 (13)
- 1997 (5)
- 1996 (15)
- 1995 (13)
- 1994 (9)
- 1993 (11)
- 1992 (11)
- 1991 (7)
- 1990 (4)
- 1989 (4)
- 1988 (10)
- 1987 (7)
- 1986 (5)
- 1985 (8)
- 1984 (8)
- 1983 (4)
- 1982 (3)
- 1981 (3)
- 1980 (5)
- 1979 (5)
- 1978 (3)
- 1977 (2)
- 1976 (2)
- 1975 (2)
- 1974 (2)
- 1972 (1)
- 1971 (1)
- 1969 (1)
Document Type
- Article (330)
- Conference Proceeding (137)
- Book (118)
- Part of a Book (86)
- Report (19)
- Doctoral Thesis (6)
- Contribution to a Periodical (2)
- Course Material (2)
- Patent (2)
- Working Paper (2)
- Poster (1)
Keywords
- Kanalisation (4)
- metal structure (4)
- steel (4)
- Aachen / Fachhochschule Aachen / Fachbereich Bauingenieurwesen (3)
- Absolvententreffen (3)
- Alfha.net (3)
- Alumni (3)
- Fließgewässer (3)
- Geodatenbank (3)
- Geodatenhaltung (3)
- Geoinformationen (3)
- Geoinformationssystem (3)
- Kanalnetz (3)
- industrial research (3)
- iron and steel industry (3)
- materials technology (3)
- research report (3)
- Abwasser (2)
- Bauplanung (2)
- Bemessung (2)
Institute
- Fachbereich Bauingenieurwesen (705) (remove)
Bauwirtschaft
(2024)
Die Leistungen der Bauwirtschaft und deren wirtschaftliche Bedeutung in Deutschland werden anhand einer Vielzahl statistischer Daten verdeutlicht. Die im Vergleich zu anderen Wirtschaftsbereichen auftretenden branchenspezifischen Besonderheiten der Bauwirtschaft werden anhand von verschiedenen Kriterien herausgearbeitet. Das Zusammenspiel der einzelnen Akteure des Sektors und die dabei sich ergebenden bzw. zu beachtenden Rechts- und Vertragsgrundlagen werden dargestellt. Aufgrund der meist erheblichen Höhe des eingesetzten Kapitals werden auch notwendige Formen der Risikoabsicherungen und der in der Branche üblichen und teilweise vorgeschriebenen Versicherungsmöglichkeiten angesprochen.
Durch das öffentliche Baurecht werden die Zulässigkeit, die Grenzen, die Ordnung und die Förderung der baulichen Nutzung des Bodens geregelt.
Die Ausschreibung und die Vergabe sind von essenzieller Bedeutung für ein Bauvorhaben und werden deshalb in der HOAI mit zwei Leistungsphasen abgebildet: nämlich mit der Leistungsphase 6 Vorbereitung der Vergabe sowie der Leistungsphase 7 Mitwirkung bei der Vergabe. Im Zuge der Ausschreibung und der Vergabe werden die für den AG anfallenden Kosten festgelegt und bilden somit die letzte größere Stellschraube für Preiseinsparungen.
n diesem Kapitel werden die Abrechnungsvorschriften wichtiger ATV kurz, aber umfassend zusammengestellt. Einigen Abrechnungsbestimmungen für Einzelleistungen, die keine Nebenleistungen sind ((siehe DIN 18299 und Abschnitt 4 der jeweiligen ATV), sind mit aufgenommen worden; die ATV enthalten jedoch weitergehende Festlegungen über Nebenleistungen und Besondere Leistungen.
Im Anschluss folgen Hinweise zu den Toleranzen im Hochbau sowie im Straßenbau.
Boden, Baugrube, Verbau
(2024)
Die Lösung den Baugrund betreffender Fragestellungen beginnen i. d. R. mit der Durchführung von Baugrunderkundungen, um alle notwendigen Parameter zu erhalten, die für die Planung und Durchführung von Bauvorhaben notwendig sind. Im Folgenden werden die wichtigsten Erkundungen in Abhängigkeit der erforderlichen Güteklasse der Proben beschrieben und vorgestellt.
Die Arbeitsvorbereitung, als ein wesentliches Aufgabengebiet des Baubetriebswesens, ist von enormer Bedeutung für den Erfolg eines Bauprojektes. Die Arbeitsvorbereitung lässt sich zeitlich sowohl in der Angebotsphase (kalkulationsbegleitende Arbeitsvorbereitung), in der Vorbereitungsphase der Baustelle (von Auftragsvergabe bis Baubeginn) als auch baubegleitend einordnen.
Baustoffe
(2024)
Durch die Einführung von Building Information Modeling (BIM) sowohl projektspezifisch als auch in ganze Unternehmungen hat die Baubranche einen weitreichenden Veränderungsprozess angestoßen.
Building Information Modeling kann als eine Methode angesehen werden, um die Informationsasymmetrien zwischen den Projektbeteiligten so gering wie möglich zu halten.
Kein Bauvorhaben sollte realisiert werden, ohne dass es auf einer vertraglichen Grundlage zwischen Auftraggeber und Auftragnehmer fußt. Diese vertragliche Grundlage zu kennen ist essenziell, um dementsprechend handeln zu können. Denn nur wer seine eigenen Rechte und auch Pflichten kennt, kann sich auf diese berufen.
Schalung und Gerüste
(2024)
Systemschalungen und Systemgerüste haben den Baustellenbetrieb in vielen Bereichen sehr vereinfacht. Dennoch sind Kenntnisse in diesen Feldern für eine erfolgreiche und effektive Bauleitung unverzichtbar. In diesem Kapitel werden Hinweise und Empfehlungen für die Bemessung und Einsatz von Schalungen, Trag- und Arbeitsgerüsten für den Baustellenbetrieb gegeben.
Kalkulation
(2024)
Das Kapitel behandelt die Kosten- und Preisermittlung, die Kostenvorgabe und Kostenkontrolle.
Der Angebotspreis wird aufgeschlüsselt in die Einzelkosten der Teilleistungen, die Baustellengemeinkosten, die Allgemeinen Geschäftskosten und einen Zuschlag für Wagnis und Gewinn. Auf der Basis der Angebotskalkulation werden die Vorgaben für die Kostenkontrolle entwickelt.
Baumaschinen
(2024)
Ein neues tragendes, lagenweise aufgebautes Holzbau-Wandsystem und seine ökonomische und statische Entwicklung werden vorgestellt. Randbedingungen wie Nachhaltigkeit, Ressourceneffizienz und eine beanspruchungsadaptive Konstruktionsweise sind für diese innovative Bauteilentwicklung von zentraler Bedeutung. Eine wesentliche Herausforderung ist die Herstellung der Verbindung der Lagen untereinander zu einem bauphysikalisch und statisch leistungsfähigen Wandsystem. Die Tragfähigkeit und Steifigkeit verschiedener Verbindungsvarianten wurden ebenso wie die Eigenschaften der Wandelemente analytisch, numerisch und experimentell untersucht.
Deammonification for nitrogen removal in municipal wastewater in temperate and cold climate zones is currently limited to the side stream of municipal wastewater treatment plants (MWWTP). This study developed a conceptual model of a mainstream deammonification plant, designed for 30,000 P.E., considering possible solutions corresponding to the challenging mainstream conditions in Germany. In addition, the energy-saving potential, nitrogen elimination performance and construction-related costs of mainstream deammonification were compared to a conventional plant model, having a single-stage activated sludge process with upstream denitrification. The results revealed that an additional treatment step by combining chemical precipitation and ultra-fine screening is advantageous prior the mainstream deammonification. Hereby chemical oxygen demand (COD) can be reduced by 80% so that the COD:N ratio can be reduced from 12 to 2.5. Laboratory experiments testing mainstream conditions of temperature (8–20°C), pH (6–9) and COD:N ratio (1–6) showed an achievable volumetric nitrogen removal rate (VNRR) of at least 50 gN/(m3∙d) for various deammonifying sludges from side stream deammonification systems in the state of North Rhine-Westphalia, Germany, where m3 denotes reactor volume. Assuming a retained Norganic content of 0.0035 kgNorg./(P.E.∙d) from the daily loads of N at carbon removal stage and a VNRR of 50 gN/(m3∙d) under mainstream conditions, a resident-specific reactor volume of 0.115 m3/(P.E.) is required for mainstream deammonification. This is in the same order of magnitude as the conventional activated sludge process, i.e., 0.173 m3/(P.E.) for an MWWTP of size class of 4. The conventional plant model yielded a total specific electricity demand of 35 kWh/(P.E.∙a) for the operation of the whole MWWTP and an energy recovery potential of 15.8 kWh/(P.E.∙a) through anaerobic digestion. In contrast, the developed mainstream deammonification model plant would require only a 21.5 kWh/(P.E.∙a) energy demand and result in 24 kWh/(P.E.∙a) energy recovery potential, enabling the mainstream deammonification model plant to be self-sufficient. The retrofitting costs for the implementation of mainstream deammonification in existing conventional MWWTPs are nearly negligible as the existing units like activated sludge reactors, aerators and monitoring technology are reusable. However, the mainstream deammonification must meet the performance requirement of VNRR of about 50 gN/(m3∙d) in this case.
The present work aimed to study the mainstream feasibility of the deammonifying sludge of side stream of municipal wastewater treatment plant (MWWTP) in Kaster, Germany. For this purpose, the deammonifying sludge available at the side stream was investigated for nitrogen (N) removal with respect to the operational factors temperature (15–30°C), pH value (6.0–8.0) and chemical oxygen demand (COD)/N ratio (≤1.5–6.0). The highest and lowest N-removal rates of 0.13 and 0.045 kg/(m³ d) are achieved at 30 and 15°C, respectively. Different conditions of pH and COD/N ratios in the SBRs of Partial nitritation/anammox (PN/A) significantly influenced both the metabolic processes and associated N-removal rates. The scientific insights gained from the current work signifies the possibility of mainstream PN/A at WWTPs. The current study forms a solid basis of operational window for the upcoming semi-technical trails to be conducted prior to the full-scale mainstream PN/A at WWTP Kaster and WWTPs globally.
This study investigated the anaerobic digestion of an algal–bacterial biofilm grown in artificial wastewater in an Algal Turf Scrubber (ATS). The ATS system was located in a greenhouse (50°54′19ʺN, 6°24′55ʺE, Germany) and was exposed to seasonal conditions during the experiment period. The methane (CH4) potential of untreated algal–bacterial biofilm (UAB) and thermally pretreated biofilm (PAB) using different microbial inocula was determined by anaerobic batch fermentation. Methane productivity of UAB differed significantly between microbial inocula of digested wastepaper, a mixture of manure and maize silage, anaerobic sewage sludge, and percolated green waste. UAB using sewage sludge as inoculum showed the highest methane productivity. The share of methane in biogas was dependent on inoculum. Using PAB, a strong positive impact on methane productivity was identified for the digested wastepaper (116.4%) and a mixture of manure and maize silage (107.4%) inocula. By contrast, the methane yield was significantly reduced for the digested anaerobic sewage sludge (50.6%) and percolated green waste (43.5%) inocula. To further evaluate the potential of algal–bacterial biofilm for biogas production in wastewater treatment and biogas plants in a circular bioeconomy, scale-up calculations were conducted. It was found that a 0.116 km2 ATS would be required in an average municipal wastewater treatment plant which can be viewed as problematic in terms of space consumption. However, a substantial amount of energy surplus (4.7–12.5 MWh a−1) can be gained through the addition of algal–bacterial biomass to the anaerobic digester of a municipal wastewater treatment plant. Wastewater treatment and subsequent energy production through algae show dominancy over conventional technologies.
Das Ziel des INTERREG-Projektes „SHAREuregio“ (FKZ: 34.EFRE-0300134)
ist es, grenzüberschreitende Mobilität in der Euregio Rhein-Maas-Nord zu
ermöglichen und zu fördern. Dazu soll ein elektromobiles Car- und Bikesharing-
System entwickelt und in der Stadt Mönchengladbach, im Kreis Viersen
sowie in den Gemeinden Roermond und Venlo (beide NL) zusammen mit den
Partnern Wirtschaftsförderung Mönchengladbach, Wirtschaftsförderung für den
Kreis Viersen, NEW AG, Goodmoovs (NL), Greenflux (NL) und der FH Aachen
implementiert werden. Zunächst richtet sich das Angebot, bestehend aus 40
Elektroautos und 40 Elektrofahrrädern, an Unternehmen und wird nach einer
Erprobungsphase, mit einer größeren Anzahl an Fahrzeugen, auch für Privatpersonen
verfügbar gemacht werden. Die Fahrzeuge stehen bei den jeweiligen
Anwendungspartnern in Deutschland und den Niederlanden.
Im Rahmen dieses Projektes hat die FH Aachen „FlexSHARE“ entwickelt
– ein methodisches Framework zur innovativen Gestaltung urbaner Sharing-
Angebote. Das Framework ermöglicht es, anhand von messbaren Kenngrößen,
bedarfsgerechte und auf die Region abgestimmte Sharing-Systeme zu entwickeln.