Refine
Year of publication
- 2024 (2)
- 2023 (13)
- 2022 (32)
- 2021 (17)
- 2020 (25)
- 2019 (19)
- 2018 (15)
- 2017 (14)
- 2016 (10)
- 2015 (12)
- 2014 (22)
- 2013 (16)
- 2012 (3)
- 2011 (15)
- 2010 (21)
- 2009 (13)
- 2008 (17)
- 2007 (6)
- 2006 (12)
- 2005 (19)
- 2004 (25)
- 2003 (9)
- 2002 (21)
- 2001 (11)
- 2000 (14)
- 1999 (16)
- 1998 (17)
- 1997 (24)
- 1996 (23)
- 1995 (16)
- 1994 (15)
- 1993 (11)
- 1992 (8)
- 1991 (4)
- 1990 (3)
- 1989 (12)
- 1988 (11)
- 1987 (6)
- 1986 (7)
- 1985 (6)
- 1984 (4)
- 1983 (5)
- 1982 (3)
- 1981 (4)
- 1980 (3)
- 1979 (3)
- 1978 (2)
- 1977 (1)
- 1975 (2)
Institute
- Fachbereich Energietechnik (589) (remove)
Language
- English (589) (remove)
Document Type
- Article (361)
- Conference Proceeding (177)
- Part of a Book (25)
- Book (9)
- Conference: Meeting Abstract (7)
- Talk (3)
- Doctoral Thesis (2)
- Other (2)
- Conference Poster (1)
- Master's Thesis (1)
Keywords
- Blitzschutz (6)
- Earthquake (5)
- Diversity Management (4)
- Energy storage (4)
- Power plants (4)
- Seismic design (4)
- Associated liquids (3)
- Concentrated solar power (3)
- Elektromagnetischer Schutzschild (3)
- Hybrid energy system (3)
In IEC 61312-2 equations for the assessment of the magnetic fields inside structures due to a direct lightning strike are given. These equations are based on computer simulations for shields consisting of a single-layer steel grid of a given mesh width. Real constructions, however, contain at least two layers of reinforcement steel grids. The objective of this study was to experimentally determine the additional shielding effectiveness of a second reinforcement layer compared to a single-layer grid. To this end, simulated structures were set up in the high current laboratory. The structures consisted of cubic cages of 2 m side length with one or with two reinforcement grids, respectively. The structures were exposed to direct lightning currents representing the variety of anticipated lightning current waveforms. The magnetic fields and their derivatives at several positions inside the structure as well as the voltage between “floor” and “roof” in the center were determined for different current injection points. From these data the improvement of the shielding caused by a second reinforcement layer is derived.
Lightning protection design of a renewable energy hybrid-system without power mains connection
(2001)
Lightning protection design of a renewable energy hybrid-system without power mains connection
(2001)
In the year 2000 a direct lightning strike to the hybridsystem without power mains connection VATALI on the Greek island Crete results in the destruction and damage of some mechanical and electrical components. The hybrid-system VATALI was not lightning protected at that time. The hardware damage costs are approx. 60,000 €. The exposed site of the hybrid-system on top of a mountain was and still is the reason for a high risk of lightning strikes. Also in the future further lightning strikes have to be taken into consideration. In the paper a fundamental lightning protection design concept for renewable energy hybrid-systems without power mains connection and protection measures against direct strikes and overvoltages are shown in detail. The design concept was realized exemplarily for the hybrid-system VATALI. The hardware costs for the protection measures were about 15,000 €. About 50% of the costs are due to protection measures against direct strikes, 50% are due to overvoltage protection. Future extensions, new installations, or modifications have to be included into the lightning protection design concept of the hybrid-system.
Control of Aharonov-Bohm oscillations in a AlGaAs/GaAs ring by asymmetric and symmetric gate biasing
(2001)
Large industrial facilities and power plants often require a huge number fo information and control cables between the differnet structures. These I&C-cables can be routed in reinforced concrete cable ducts or in isolated buried cable runs. KTA 2206 is the German lightning protection standard for nuclear power plants. During the last several years considerable effort has been made to revise this standard. Despite the well established principles and design guidelines for the construction of the lightning protection system, this standard puts special emphasis on the coupling of transient overvoltages to I&C-cables.