Article
Refine
Year of publication
- 2024 (2)
- 2023 (2)
- 2022 (5)
- 2021 (5)
- 2020 (6)
- 2019 (7)
- 2018 (10)
- 2017 (5)
- 2016 (12)
- 2015 (7)
- 2014 (10)
- 2013 (9)
- 2012 (9)
- 2011 (20)
- 2010 (17)
- 2009 (16)
- 2008 (19)
- 2007 (21)
- 2006 (16)
- 2005 (13)
- 2004 (17)
- 2003 (6)
- 2002 (12)
- 2001 (10)
- 2000 (14)
- 1999 (17)
- 1998 (11)
- 1997 (11)
- 1996 (9)
- 1995 (11)
- 1994 (14)
- 1993 (9)
- 1992 (7)
- 1991 (3)
- 1990 (5)
- 1989 (5)
- 1988 (5)
- 1987 (2)
- 1986 (1)
- 1985 (6)
- 1984 (1)
- 1982 (1)
- 1981 (1)
- 1980 (4)
- 1979 (2)
- 1978 (3)
- 1976 (1)
- 1975 (1)
- 1974 (1)
Document Type
- Article (401) (remove)
Language
- English (401) (remove)
Keywords
- Hot S-parameter (2)
- MINLP (2)
- 3-D printing (1)
- Automated driving (1)
- Automotive application (1)
- Benchmark (1)
- Bloom’s Taxonomy (1)
- Booster Stations (1)
- Buffering Capacity (1)
- CAV (1)
- Chance Constraint (1)
- Circuit simulation (1)
- Competence Developing Games (1)
- Engineering Application (1)
- Experimental validation (1)
- Furnace (1)
- Fusion (1)
- Game-based learning (1)
- IP-based networks (1)
- IT security education (1)
Institute
- Fachbereich Elektrotechnik und Informationstechnik (401) (remove)
Logic-based robot control in highly dynamic domains / Ferrein, Alexander ; Lakemeyer, Gerhard
(2008)
Making a C2 information system platform independent by using internet and middleware technologies
(1999)
The join of a geographical situation display system and a platform independent C2 information system
(2000)
An experimental command and control information system based on Enterprise Java bean technology
(2002)
7T MR Safety
(2021)
This paper describes the realization of a novel neurocomputer which is based on the concepts of a coprocessor. In contrast to existing neurocomputers the main interest was the realization of a scalable, flexible system, which is capable of computing neural networks of arbitrary topology and scale, with full independence of special hardware from the software's point of view. On the other hand, computational power should be added, whenever needed and flexibly adapted to the requirements of the application. Hardware independence is achieved by a run time system which is capable of using all available computing power, including multiple host CPUs and an arbitrary number of neural coprocessors autonomously. The realization of arbitrary neural topologies is provided through the implementation of the elementary operations which can be found in most neural topologies.
The development and analysis of three waveguides for the exposure of small biological in vitro samples to mobile communication signals at 900 MHz (GSM, Global System for Mobile Communications), 1.8 GHz (GSM), and 2 GHz (UMTS, Universal Mobile Telecommunications System) is presented. The waveguides were based on a fin-line concept and the chamber containing the samples bathed in extracellular solution was placed onto two fins with a slot in between, where the exposure field concentrates. Measures were taken to allow for patch clamp recordings during radiofrequency (RF) exposure. The necessary power for the achievement of the maximum desired specific absorption rate (SAR) of 20 W/kg (average over the mass of the solution) was approximately Pin = 50 mW, Pin = 19 mW, and Pin = 18 mW for the 900 MHz, 1800 MHz, and 2 GHz devices, respectively. At 20 W/kg, a slight RF-induced temperature elevation in the solution of no more than 0.3 °C was detected, while no thermal offsets due to the electromagnetic exposure could be detected at the lower SAR settings (2, 0.2, and 0.02 W/kg). A deviation of 10% from the intended solution volume yielded a calculated SAR deviation of 8% from the desired value. A maximum ±10% variation in the local SAR could occur when the position of the patch clamp electrode was altered within the area where the cells to be investigated were located.
The potential of electronic markets in enabling innovative product bundles through flexible and sustainable partnerships is not yet fully exploited in the telecommunication industry. One reason is that bundling requires seamless de-assembling and re-assembling of business processes, whilst processes in telecommunication companies are often product-dependent and hard to virtualize. We propose a framework for the planning of the virtualization of processes, intended to assist the decision maker in prioritizing the processes to be virtualized: (a) we transfer the virtualization pre-requisites stated by the Process Virtualization Theory in the context of customer-oriented processes in the telecommunication industry and assess their importance in this context, (b) we derive IT-oriented requirements for the removal of virtualization barriers and highlight their demand on changes at different levels of the organization. We present a first evaluation of our approach in a case study and report on lessons learned and further steps to be performed.
As the potential of a next generation network (NGN) is recognised, telecommunication companies consider switching to it. Although the implementation of an NGN seems to be merely a modification of the network infrastructure, it may trigger or require changes in the whole company, because it builds upon the separation between service and transport, a flexible bundling of services to products and the streamlining of the IT infrastructure. We propose a holistic framework, structured into the layers ‘strategy’, ‘processes’ and ‘information systems’ and incorporate into each layer all concepts necessary for the implementation of an NGN, as well as the alignment of these concepts. As a first proof-of-concept for our framework we have performed a case study on the introduction of NGN in a large telecommunication company; we show that our framework captures all topics that are affected by an NGN implementation.
Automated driving is now possible in diverse road and traffic conditions. However, there are still situations that automated vehicles cannot handle safely and efficiently. In this case, a Transition of Control (ToC) is necessary so that the driver takes control of the driving. Executing a ToC requires the driver to get full situation awareness of the driving environment. If the driver fails to get back the control in a limited time, a Minimum Risk Maneuver (MRM) is executed to bring the vehicle into a safe state (e.g., decelerating to full stop). The execution of ToCs requires some time and can cause traffic disruption and safety risks that increase if several vehicles execute ToCs/MRMs at similar times and in the same area. This study proposes to use novel C-ITS traffic management measures where the infrastructure exploits V2X communications to assist Connected and Automated Vehicles (CAVs) in the execution of ToCs. The infrastructure can suggest a spatial distribution of ToCs, and inform vehicles of the locations where they could execute a safe stop in case of MRM. This paper reports the first field operational tests that validate the feasibility and quantify the benefits of the proposed infrastructure-assisted ToC and MRM management. The paper also presents the CAV and roadside infrastructure prototypes implemented and used in the trials. The conducted field trials demonstrate that infrastructure-assisted traffic management solutions can reduce safety risks and traffic disruptions.
Objective
This study assesses and quantifies impairment of postoperative magnetic resonance imaging (MRI) at 7 Tesla (T) after implantation of titanium cranial fixation plates (CFPs) for neurosurgical bone flap fixation.
Materials and methods
The study group comprised five patients who were intra-individually examined with 3 and 7 T MRI preoperatively and postoperatively (within 72 h/3 months) after implantation of CFPs. Acquired sequences included T₁-weighted magnetization-prepared rapid-acquisition gradient-echo (MPRAGE), T₂-weighted turbo-spin-echo (TSE) imaging, and susceptibility-weighted imaging (SWI). Two experienced neurosurgeons and a neuroradiologist rated image quality and the presence of artifacts in consensus reading.
Results
Minor artifacts occurred around the CFPs in MPRAGE and T2 TSE at both field strengths, with no significant differences between 3 and 7 T. In SWI, artifacts were accentuated in the early postoperative scans at both field strengths due to intracranial air and hemorrhagic remnants. After resorption, the brain tissue directly adjacent to skull bone could still be assessed. Image quality after 3 months was equal to the preoperative examinations at 3 and 7 T.
Conclusion
Image quality after CFP implantation was not significantly impaired in 7 T MRI, and artifacts were comparable to those in 3 T MRI.
This paper presents the latest prototype of the integrated emitter turn-off thyristor concept, which potentially ranks among thyristor high-power devices like the gate turn-off thyristor and the integrated gate-commutated thyristor (IGCT). Due to modifications of the external driver stage and mechanical press-pack design optimization, this prototype allows for full device characterization. The turn-off capability was increased to 1600 A with an active silicon area of 823mm2 . This leads to a transient peak power of 672.1kW/cm² . Within this paper, measurements and concept assessment are presented and a comparison to state-of-the-art IGCT devices is provided.