Refine
Year of publication
- 2024 (13)
- 2023 (5)
- 2022 (11)
- 2021 (13)
- 2020 (14)
- 2019 (28)
- 2018 (16)
- 2017 (14)
- 2016 (35)
- 2015 (27)
- 2014 (12)
- 2013 (17)
- 2012 (30)
- 2011 (24)
- 2010 (24)
- 2009 (38)
- 2008 (23)
- 2007 (41)
- 2006 (51)
- 2005 (18)
- 2004 (20)
- 2003 (20)
- 2002 (8)
- 2001 (9)
- 2000 (17)
- 1999 (13)
- 1998 (13)
- 1997 (5)
- 1996 (15)
- 1995 (13)
- 1994 (9)
- 1993 (11)
- 1992 (11)
- 1991 (7)
- 1990 (4)
- 1989 (4)
- 1988 (10)
- 1987 (7)
- 1986 (5)
- 1985 (8)
- 1984 (8)
- 1983 (4)
- 1982 (3)
- 1981 (3)
- 1980 (5)
- 1979 (5)
- 1978 (3)
- 1977 (2)
- 1976 (2)
- 1975 (2)
- 1974 (2)
- 1972 (1)
- 1971 (1)
- 1969 (1)
Document Type
- Article (330)
- Conference Proceeding (137)
- Book (118)
- Part of a Book (86)
- Report (19)
- Doctoral Thesis (6)
- Contribution to a Periodical (2)
- Course Material (2)
- Patent (2)
- Working Paper (2)
- Poster (1)
Keywords
- Kanalisation (4)
- metal structure (4)
- steel (4)
- Aachen / Fachhochschule Aachen / Fachbereich Bauingenieurwesen (3)
- Absolvententreffen (3)
- Alfha.net (3)
- Alumni (3)
- Fließgewässer (3)
- Geodatenbank (3)
- Geodatenhaltung (3)
- Geoinformationen (3)
- Geoinformationssystem (3)
- Kanalnetz (3)
- industrial research (3)
- iron and steel industry (3)
- materials technology (3)
- research report (3)
- Abwasser (2)
- Bauplanung (2)
- Bemessung (2)
Institute
- Fachbereich Bauingenieurwesen (705) (remove)
In the context of the Corona pandemic and its impact on teaching like digital lectures and exercises a new concept especially for freshmen in demanding courses of Smart Building Engineering became necessary. As there were hardly any face-to-face events at the university, the new teaching concept should enable a good start into engineering studies under pandemic conditions anyway and should also replace the written exam at the end. The students should become active themselves in small teams instead of listening passively to a lecture broadcast online with almost no personal contact. For this purpose, a role play was developed in which the freshmen had to work out a complete solution to the realistic problem of designing, construction planning and implementing a small guesthouse. Each student of the team had to take a certain role like architect, site manager, BIM-manager, electrician and the technitian for HVAC installations. Technical specifications must be complied with, as well as documentation, time planning and cost estimate. The final project folder had to contain technical documents like circuit diagrams for electrical components, circuit diagrams for water and heating, design calculations and components lists. On the other hand construction schedule, construction implementation plan, documentation of the construction progress and minutes of meetings between the various trades had to be submitted as well. In addition to the project folder, a model of the construction project must also be created either as a handmade model or as a digital 3D-model using Computer-aided design (CAD) software. The first steps in the field of Building information modelling (BIM) had also been taken by creating a digital model of the building showing the current planning status in real time as a digital twin. This project turned out to be an excellent training of important student competencies like teamwork, communication skills, and self -organisation and also increased motivation to work on complex technical questions. The aim of giving the student a first impression on the challenges and solutions in building projects with many different technical trades and their points of view was very well achieved and should be continued in the future.
The worldwide Corona pandemic has severely restricted student projects in the higher semesters of engineering courses. In order not to delay the graduation, a new concept had to be developed for projects under lockdown conditions. Therefore, unused rooms at the university should be digitally recorded in order to develop a new usage concept as laboratory rooms. An inventory of the actual state of the rooms was done first by taking photos and listing up all flaws and peculiarities. After that, a digital site measuring was done with a 360° laser scanner and these recorded scans were linked to a coherent point cloud and transferred to a software for planning technical building services and supporting Building Information Modelling (BIM). In order to better illustrate the difference between the actual and target state, two virtual reality models were created for realistic demonstration. During the project, the students had to go through the entire digital planning phases. Technical specifications had to be complied with, as well as documentation, time planning and cost estimate. This project turned out to be an excellent alternative to on-site practical training under lockdown conditions and increased the students’ motivation to deal with complex technical questions.
Robust estimators for free surface turbulence characterization: A stepped spillway application
(2020)
Robust estimators are parameters insensitive to the presence of outliers. However, they presume the shape of the variables’ probability density function. This study exemplifies the sensitivity of turbulent quantities to the use of classic and robust estimators and the presence of outliers in turbulent flow depth time series. A wide range of turbulence quantities was analysed based upon a stepped spillway case study, using flow depths sampled with Acoustic Displacement Meters as the flow variable of interest. The studied parameters include: the expected free surface level, the expected fluctuation intensity, the depth skewness, the autocorrelation timescales, the vertical velocity fluctuation intensity, the perturbations celerity and the one-dimensional free surface turbulence spectrum. Three levels of filtering were utilised prior to applying classic and robust estimators, showing that comparable robustness can be obtained either using classic estimators together with an intermediate filtering technique or using robust estimators instead, without any filtering technique.
Energy saving ordinances requires that buildings must be designed in such a way that the heat transfer surface including the joints is permanently air impermeable. The prefabricated roof and wall panels in lightweight steel constructions are airtight in the area of the steel covering layers. The sealing of the panel joints contributes to fulfil the comprehensive requirements for an airtight building envelope. To improve the airtightness of steel sandwich panels, additional sealing tapes can be installed in the panel joint. The influence of these sealing tapes was evaluated by measurements carried out by the RWTH Aachen University - Sustainable Metal Building Envelopes. Different installation situations were evaluated by carrying out airtightness tests for different joint distances. In addition, the influence on the heat transfer coefficient was also evaluated using the Finite Element Method (FEM). The combination of obtained air volume flow and transmission losses enables to create an "effective heat transfer coefficient" due to transmission and infiltration. This summarizes both effects in one value and is particularly helpful for approximate calculations on energy efficiency.
Die Versorgung von Neubauten soll möglichst weitgehend unabhängig von fossilen Energieträgern erfolgen. Erneuerbare Energien spielen dafür eine gewichtige Rolle. Eine gute Möglichkeit, erneuerbare Energien ohne viel zusätzlichen Aufwand nutzbar zu machen, ist, bereits vorhandenen Komponenten im Gebäude zusätzliche Funktionen zu geben. Hier kann bspw. die Fassade oder das Dach solarthermisch aktiviert oder durch Fotovoltaikmodule ergänzt werden. Auch Tiefgründungen können neben der statischen Funktion noch eine geothermische Funktion zur Aufnahme oder Abgabe von Wärme erhalten. Neben der Erzeugung bietet sich auch für die Verteilung der Wärme oder Kälte im Gebäude die Integration in Bauteile an. Hier kann bspw. der Boden durch eine Fußbodenheizung oder die Decke durch Deckenstrahlplatten aktiviert werden.
Im Rahmen der Veröffentlichung wird auf die thermische Aktivierung von Stahlkomponenten eingegangen. Es wird eine Lösung vorgestellt, die vorgehängte hinterlüftete Stahlfassade (VHF) solarthermisch zu aktivieren. Außerdem werden zwei Möglichkeiten zur geothermischen Aktivierung von Tiefgründungen mittels Stahlpfählen gezeigt. Zuletzt wird ein System zur thermischen Aktivierung von Stahltrapezprofilen an der Decke erläutert, welches Wärme zuführen oder bei Bedarf abführen kann.
Stahlbau 2
(2020)
Membrane contactors are a promising alternative for nitrogen removal and recovery from process water compared to other physicochemical and biological sidestream treatment processes. Münster wastewater treatment plant (WWTP) is the first municipal WWTP in Germany operating a full-scale membrane contactor system to improve the nitrogen elimination and recovery efficiency. Factors influencing the operation and membrane performance are investigated in an accompanying research project. Additional operational aspects of the applied membrane modules are investigated in detail using a bench-scale membrane contactor. First results of the full-scale application demonstrate a high nitrogen removal efficiency of >95%.
Different analytical approaches exist to describe the structural substance or wear reserve of sewer systems. The aim is to convert engineering assessments of often complex defect patterns into computational algorithms and determine a substance class for a sewer section or manhole. This analytically determined information is essential for strategic rehabilitation planning processes up to network level, as it corresponds to the most appropriate rehabilitation type and can thus provide decision-making support. Current calculation methods differ clearly from each other in parts, so that substance classes determined by the different approaches are only partially comparable with each other. The objective of the German R&D cooperation project ‘SubKanS’ is to develop a methodology for classifying the specific defect patterns resulting from the interaction of all the individual defects, and their severities and locations. The methodology takes into account the structural substance of sewer sections and manholes, based on real data and theoretical considerations analogous to the condition classification of individual defects. The result is a catalogue of defect patterns and characteristics, as well as associated structural substance classifications of sewer systems (substance classes). The methodology for sewer system substance classification is developed so that the classification of individual defects can be transferred into a substance class of the sewer section or manhole, eventually taking into account further information (e.g. pipe material, nominal diameter, etc.). The result is a validated methodology for automated sewer system substance classification.