Refine
Year of publication
Document Type
- Conference Proceeding (167) (remove)
Keywords
- Energy storage (4)
- Power plants (4)
- Associated liquids (3)
- Concentrated solar power (3)
- Hybrid energy system (3)
- Electricity generation (2)
- Solar thermal technologies (2)
- building information modelling (2)
- 3D printing (1)
- BIM (1)
- Camera system (1)
- Ceramics (1)
- Cloud passages (1)
- Control optimization (1)
- DNI forecast (1)
- DNI forecasting (1)
- Decision theory (1)
- Direct normal irradiance forecast (1)
- District data model (1)
- District energy planning platform (1)
Institute
- Solar-Institut Jülich (167) (remove)
Solar tower power plants
(2008)
Kraft-Wärme-Kälte-Kopplung im Leistungsbereich in 10kW mit periodisch arbeitender Sorptionsmaschine
(2009)
Air-sand heat exchanger
(2011)
The Passivhaus building standard is a concept developed for the realization of energy-efficient and economical buildings with a simultaneous high utilization comfort under European climate conditions. Major elements of the Passivhaus concept are a high thermal insulation of the external walls, the use of heat and/or solar shading glazing as well as an airtight building envelope in combination with energy-efficient technical building installations and heating or cooling generators, such as an efficient energy-recovery in the building air-conditioning. The objective of this research project is the inquiry to determine the parameters or constraints under which the Passivhaus concept can be implemented under the arid climate conditions in the Arabian Peninsula to achieve an energy-efficient and economical building with high utilization comfort. In cooperation between the Qatar Green Building Council (QGBC), Barwa Real Estate (BRE) and Kahramaa the first Passivhaus was constructed in Qatar and on the Arabian Peninsula in 2013. The Solar-Institut Jülich of Aachen University of Applied Science supports the Qatar Green Building Council with a dynamic building and equipment simulation of the Passivhaus and the neighbouring reference building. This includes simulation studies with different component configurations for the building envelope and different control strategies for heating or cooling systems as well as the air conditioning of buildings to find an energetic-economical optimum. Part of these analyses is the evaluation of the energy efficiency of the used energy recovery system in the Passivhaus air-conditioning and identification of possible energy-saving effects by the use of a bypass function integrated in the heat exchanger. In this way it is expected that on an annual basis the complete electricity demand of the building can be covered by the roof-integrated PV generator.
Retrofitting of existing parabolic trough collector power plants with molten salt tower systems
(2018)
Improved efficiency prediction of a molten salt receiver based on dynamic cloud passage simulation
(2019)
Modeling and upscaling of a pilot bayonettube reactor for indirect solar mixed methane reforming
(2020)
We present first results from a newly developed monitoring station for a closed loop geothermal heat pump test installation at our campus, consisting of helix coils and plate heat exchangers, as well as an ice-store system. There are more than 40 temperature sensors and several soil moisture content sensors distributed around the system, allowing a detailed monitoring under different operating conditions.In the view of the modern development of renewable energies along with the newly concepts known as Internet of Things and Industry 4.0 (high-tech strategy from the German government), we created a user-friendly web application, which will connect the things (sensors) with the open network (www). Besides other advantages, this allows a continuous remote monitoring of the data from the numerous sensors at an arbitrary sampling rate.Based on the recorded data, we will also present first results from numerical simulations, taking into account all relevant heat transport processes.The aim is to improve the understanding of these processes and their influence on the thermal behavior of shallow geothermal systems in the unsaturated zone. This will in turn facilitate the prediction of the performance of these systems and therefore yield an improvement in their dimensioning when designing a specific shallow geothermal installation.
Development of open educational resources for renewable energy and the energy transition process
(2021)
The dissemination of knowledge about renewable energies is understood as a social task with the highest topicality. The transfer of teaching content on renewable energies into digital open educational resources offers the opportunity to significantly accelerate the implementation of the energy transition. Thus, in the here presented project six German universities create open educational resources for the energy transition. These materials are available to the public on the internet under a free license. So far there has been no publicly accessible, editable media that cover entire learning units about renewable energies extensively and in high technical quality. Thus, in this project, the content that remains up-to-date for a longer period is appropriately prepared in terms of media didactics. The materials enable lecturers to provide students with in-depth training about technologies for the energy transition. In a particular way, the created material is also suitable for making the general public knowledgeable about the energy transition with scientifically based material.
Urban farming is an innovative and sustainable way of food production and is becoming more and more important in smart city and quarter concepts. It also enables the production of certain foods in places where they usually dare not produced, such as production of fish or shrimps in large cities far away from the coast. Unfortunately, it is not always possible to show students such concepts and systems in real life as part of courses: visits of such industry plants are sometimes not possible because of distance or are permitted by the operator for hygienic reasons. In order to give the students the opportunity of getting into contact with such an urban farming system and its complex operation, an industrial urban farming plant was set up on a significantly smaller scale. Therefore, all needed technical components like water aeriation, biological and mechanical filtration or water circulation have been replaced either by aquarium components or by self-designed parts also using a 3D-printer. Students from different courses like mechanical engineering, smart building engineering, biology, electrical engineering, automation technology and civil engineering were involved in this project. This “miniature industrial plant” was also able to start operation and has now been running for two years successfully. Due to Corona pandemic, home office and remote online lectures, the automation of this miniature plant should be brought to a higher level in future for providing a good control over the system and water quality remotely. The aim of giving the student a chance to get to know the operation of an urban farming plant was very well achieved and the students had lots of fun in “playing” and learning with it in a realistic way.
FEven though BIM (Building Information Modelling) is successfully implemented in most of the world, it is still in the early stages in Germany, since the stakeholders are sceptical of its reliability and efficiency. The purpose of this paper is to analyse the opportunities and obstacles to implementing BIM for prefabrication. Among all other advantages of BIM, prefabrication is chosen for this paper because it plays a vital role in creating an impact on the time and cost factors of a construction project. The project stakeholders and participants can explicitly observe the positive impact of prefabrication, which enables the breakthrough of the scepticism factor among the small-scale construction companies. The analysis consists of the development of a process workflow for implementing prefabrication in building construction followed by a practical approach, which was executed with two case studies. It was planned in such a way that, the first case study gives a first-hand experience for the workers at the site on the BIM model so that they can make much use of the created BIM model, which is a better representation compared to the traditional 2D plan. The main aim of the first case study is to create a belief in the implementation of BIM Models, which was succeeded by the execution of offshore prefabrication in the second case study. Based on the case studies, the time analysis was made and it is inferred that the implementation of BIM for prefabrication can reduce construction time, ensures minimal wastes, better accuracy, less problem-solving at the construction site. It was observed that this process requires more planning time, better communication between different disciplines, which was the major obstacle for successful implementation. This paper was carried out from the perspective of small and medium-sized mechanical contracting companies for the private building sector in Germany.