Refine
Year of publication
Document Type
- Conference Proceeding (227) (remove)
Language
- English (130)
- German (95)
- Multiple languages (1)
- Spanish (1)
Has Fulltext
- yes (227) (remove)
Keywords
- Biosensor (25)
- Blitzschutz (15)
- CAD (11)
- Finite-Elemente-Methode (11)
- civil engineering (11)
- Bauingenieurwesen (10)
- Lightning protection (9)
- Einspielen <Werkstoff> (6)
- Telekommunikationsmarkt (6)
- shakedown analysis (6)
- Graduiertentagung (5)
- Clusterion (4)
- Führung (4)
- Kanalisation (4)
- Leadership (4)
- Sonde (4)
- limit analysis (4)
- reinforced concrete (4)
- Aachen / Fachhochschule Aachen / Fachbereich Bauingenieurwesen (3)
- Absolvententreffen (3)
Institute
- Fachbereich Medizintechnik und Technomathematik (91)
- IfB - Institut für Bioengineering (38)
- Fachbereich Bauingenieurwesen (36)
- Fachbereich Energietechnik (33)
- Fachbereich Maschinenbau und Mechatronik (19)
- Fachbereich Elektrotechnik und Informationstechnik (16)
- Fachbereich Wirtschaftswissenschaften (15)
- Fachbereich Luft- und Raumfahrttechnik (11)
- INB - Institut für Nano- und Biotechnologien (11)
- FH Aachen (6)
- MASKOR Institut für Mobile Autonome Systeme und Kognitive Robotik (4)
- Solar-Institut Jülich (3)
- ZHQ - Bereich Hochschuldidaktik und Evaluation (2)
- Fachbereich Chemie und Biotechnologie (1)
- Fachbereich Gestaltung (1)
To give the exchange of goods and services between the European Union (EU) and the United States (U.S.) new momentum the two parties are currently negotiating the transatlantic free trade agreement Transatlantic Trade and Investment Partnership (TTIP). The aim is to create the largest free trade area in the world. The agreement, once entered into force, will oblige EU countries and the U.S. to further liberalize their markets.
The negotiations on TTIP include a chapter on Electronic Communications/ Telecommunications. The challenge therein will be securing commitments for market access to Electronic Communications services. At the same time, these commitments must reflect the legitimate need for consumer protection issues. The need to reduce Electronic Communications-related non-tariff barriers to trade between the Parties is due to the fact that these markets are heavily regulated. Without transnational rules as to regulations national governments can abuse these regulations to deter the market entry by new (foreign) suppliers. Thus the free trade agreement TTIP affects in many respects regulatory provisions on and access to Electronic Communications markets. The objective of this paper is therefore to examine to what extend the regulatory principles for Electronic Communications markets envisaged under TTIP will result in trade facilitation and regulatory convergence between the EU and the U.S.
As to this question the result of the analysis is that the chapter on Electronic Communications will be an important step towards facilitating trade in Electronic Communications services. At the same time some regulatory convergence will take place, but this convergence will not lead to a (full) harmonization of regulations. Rather the norm, also after TTIP negotiations will have been concluded successfully, will be mutual recognition of different regulatory regimes. Different regulations being the optimal policy response in different market settings will continue to exist. Moreover, it is very unlikely that such regulatory principles for the Electronic Communications sector are a vehicle for a race to the bottom in levels of consumer protection.
Dr.-Ing. Lothar Fuchs vom itwh Hannover mit 13 Seiten (S. 57-69) Beitrag zum 1. Aachener Softwaretag in der Wasserwirtschaft <1, 2007, Aachen> Zusammenfassung [des Autors] Die wesentlichen technischen Probleme der Kanalnetzbewirtschaftung sind gelöst. Der Markt bietet bewährte Messgeräte, Steuerungseinrichtungen, Datenübertragungs-, Regler- und Rechnersysteme, die sich für den Einsatz in der Stadtentwässerung eignen. Mit den heute existierenden Simulationsmodellen können die Auswirkungen von Bewirtschaftungssystemen abgeschätzt werden, bevor diese implementiert werden. Die für Bewirtschaftungssysteme notwendige Ausrüstung ist eine andere, als die traditionell in der Stadtentwässerung übliche. Sie erfordert in jedem Fall mehr und teureren Wartungsaufwand sowie anders ausgebildetes Personal. Bei einem Kostenvergleich mit konventionellen (d.h. ungesteuerten) Systemen muß die umfassende Information und Kontrolle des bewirtschafteten Systems berücksichtigt werden. Die permanente Information über den Betriebszustand sowie die in allen existierenden Bewirtschaftungssystemen erreichten Verminderungen von Regenentlastungen und (in geringerem Maße) hydraulischen Überlastungen lassen es geraten erscheinen, Kanalnetzbewirtschaftung nicht nur unter dem Gesichtspunkt der höheren Betriebskosten, sondern auch denen der möglich Einsparungen von Investitionen und der höheren Effizienz zu beurteilen. Analog lässt sich zeigen, dass bewirtschaftete Systeme kleiner ausgelegt werden können und dennoch die gleiche Effizienz besitzen wie größer dimensionierte, statisch wirkende Systeme.
GaAs-based Gunn diodes with graded AlGaAs hot electron injector heterostructures have been developed under the special needs in automotive applications. The fabrication of the Gunn diode chips was based on total substrate removal and processing of integrated Au heat sinks. Especially, the thermal and RF behavior of the diodes have been analyzed by DC, impedance and S-parameter measurements. The electrical investigations have revealed the functionality of the hot electron injector. An optimized layer structure could fulfill the requirements in adaptive cruise control (ACC) systems at 77 GHz with typical output power between 50 and 90 mW.
Table of contents 1. Introduction 2. Multi-level Technology Transfer Infrastructure 2.1 Level 1: University Education – Encourage the Idea of becoming an Entrepreneur 2.2 Level 2: Post Graduate Education – Improve your skills and focus it on a product family. 2.3 Level 3: Birth of a Company – Focus your skills on a product and a market segment. 2.4 Level 4: Ready to stand alone – Set up your own business 2.5 Level 5: Grow to be Strong – Develop your business 2.6 Level 6: Competitive and independent – Stay innovative. 3. Samples 3.1 Sample 1: Laser Processing and Consulting Centre, LBBZ 3.2 Sample 2: Prototyping Centre, CP 4. Funding - Waste money or even lost Money? 5. Conclusion
Physische Prototypen, also Anschauungs- und Funktionsmodelle nach den generativen oder Rapid Prototyping (RP) Verfahren haben sich in diesem Zusammenhang vor allem als Hilfsmittel zur effektiven Kommunikation und zur Evaluierung von Produkteigenschaften einen festen Platz in der Produktentstehung erworben. Die positiven Effekte der etablierten RP Verfahren sind unumstritten. Einfachere, schnellere und wirtschaftlichere Maschinen (Prototyper, Fabrikator), vor allem auch für die Büroumgebung, geben neue Impulse im Sinne der Optimierung der heutigen Verfahren. Eine neue Dimension verspricht die Option „Farbe“ der bisher fast ausschließlich monochromen Modelle. Ist Farbe nur „nice to have“ oder welchen Effekt haben farbige Modelle als Werkzeug von Konstrukteuren und Produktenwicklern? Welche Perspektiven bietet „Farbe“ darüber hinaus?
The Passivhaus building standard is a concept developed for the realization of energy-efficient and economical buildings with a simultaneous high utilization comfort under European climate conditions. Major elements of the Passivhaus concept are a high thermal insulation of the external walls, the use of heat and/or solar shading glazing as well as an airtight building envelope in combination with energy-efficient technical building installations and heating or cooling generators, such as an efficient energy-recovery in the building air-conditioning. The objective of this research project is the inquiry to determine the parameters or constraints under which the Passivhaus concept can be implemented under the arid climate conditions in the Arabian Peninsula to achieve an energy-efficient and economical building with high utilization comfort. In cooperation between the Qatar Green Building Council (QGBC), Barwa Real Estate (BRE) and Kahramaa the first Passivhaus was constructed in Qatar and on the Arabian Peninsula in 2013. The Solar-Institut Jülich of Aachen University of Applied Science supports the Qatar Green Building Council with a dynamic building and equipment simulation of the Passivhaus and the neighbouring reference building. This includes simulation studies with different component configurations for the building envelope and different control strategies for heating or cooling systems as well as the air conditioning of buildings to find an energetic-economical optimum. Part of these analyses is the evaluation of the energy efficiency of the used energy recovery system in the Passivhaus air-conditioning and identification of possible energy-saving effects by the use of a bypass function integrated in the heat exchanger. In this way it is expected that on an annual basis the complete electricity demand of the building can be covered by the roof-integrated PV generator.
IT-Sicherheit im Automobil
(2014)
Dipl.-Ing. Dirk Hecker von der Ingenieurgesellschaft Tuttahs & Meyer in Aachen. Vortrag gehalten beim 1. Aachener Softwaretag in der Wasserwirtschaft <1, 2007, Aachen> 27 S. (S. 28-54) Zusammenfassung [des Autors]: Nach den spektakulären Hochwasserereignissen an Rhein, Elbe und Donau hat die Deutsche Vereinigung für Wasserwirtschaft, Abwasser und Abfall e. V. (DWA) einen Fachausschuss zur Erstellung eines Merkblattes M 103 „Hochwasserschutz für Abwasseranlagen“ berufen. Das Merkblatt zeigt in den Kapiteln Konzeption, Planungsgrundsätze und Hochwassermanagement eine strukturierte Vorgehensweise zur bestmöglichen Vorsorge zum Schutz der Abwasseranlagen im Hochwasserfall. Entsprechend den Forderungen des im Jahr 2005 verabschiedeten Gesetzes zur Verbesserung des vorbeugenden Hochwasserschutzes, floss in das Wasserhaushaltsgesetz unter anderem die allgemeine Verpflichtung jedes potentiell vom Hochwasser Betroffenen ein, geeignete Schutzmaßnahmen zur Schadensminimierung zu treffen. Hierbei werden speziell die Wasserversorgung und die Abwasserbeseitigung erwähnt. Im DWA-M 103 wir detailliert dargestellt wie und mit welchem Aufwand die Abwasseranlagen zu überprüfen sind und wie hierzu ein Hochwasserschutzkonzept erstellt werden kann. Zusätzlich werden Hinweise für die Planung von Abwasseranlagen in hochwassergefährdeten Bereichen gegeben, die den störungsfreien Betrieb im Hochwasserfall gewährleisten sollen. Schlussendlich werden das Hochwassermanagement und der Betrieb dargestellt und hier wichtige Anregungen gegeben im Ernstfall ausreichend vorbereitet zu sein. Das DWA-M 103 richtet sich in erster Linie an die Betreiber und Planer von Abwasseranlagen. Jedoch werden hier auch, gerade durch die Vielzahl von Checklisten, Kommunen Denkanstöße und Anregungen für die Hochwasservorsorge/-schutz von öffentlichen Gebäuden und Einrichtungen gegeben.
Abstract of the authors: In many areas of computer science ontologies become more and more important. The use of ontologies for domain modeling often brings up the issue of ontology integration. The task of merging several ontologies, covering specific subdomains, into one united ontology has to be solved. Many approaches for ontology integration aim at automating the process of ontology alignment. However, a complete automation is not feasible, and user interaction is always required. Nevertheless, most ontology integration tools offer only very limited support for the interactive part of the integration process. In this paper, we present a novel approach for the interactive integration of ontologies. The result of the ontology integration is incrementally updated after each definition of a correspondence between ontology elements. The user is guided through the ontologies to be integrated. By restricting the possible user actions, the integrity of all defined correspondences is ensured by the tool we developed. We evaluated our tool by integrating different regulations concerning building design.
Abstracts of the ACHEMA 2000 - International Meeting on Chemical Engineering, Environmental Protection and Biotechnology, May 22 - 27, 2000. Frankfurt am Main. Achema 2000 : special edition / Linde. [Ed.: Linde AG. Red.: Volker R. Leski]. - Wiesbaden : Linde AG, 2000. - 56 p. : Ill., . - pp: 79 - 81
Geräuschminderung und Leichtbau in Leistungsgetrieben durch den Einsatz von Werkstoffverbunden
(2007)
Das Oberflächenabflussmodell von Keser und die Grenzwertmethode : Die Abflussbildung im Vergleich.
(2007)
Dipl.-Ing. Rudolf Herzog , Rehm Software Berg / Ravensburg. 9 S. (S. 94-102). Beitrag zum 1. Aachener Softwaretag in der Wasserwirtschaft a1, 2007, Aachen>. Zusammenfassung [des Autors] Die grundlegenden Ansätze der beiden Modelle sind ähnlich. Der hauptsächliche Unterschied liegt darin, dass die Grenzwertmethode die Angabe einer Bodenart erfordert, die ihrerseits wieder Probleme verursachen kann. Es kann nicht davon ausgegangen werden, dass die Bodenarten homogen anliegen. Die ersatzweise Vorgabe einer für alle Einzugsgebiete einheitlichen Bodenart hilft da nicht wirklich weiter. Es stellt sich vielmehr die Frage, ob der zusätzliche Aufwand eine signifikante Verbesserung des Ereignisses zur Folge hat. Der Vorteil der Grenzwertmethode liegt auf der Hand: Die Parameterwahl ermöglicht eine flexible Steuerung des Modells, in die Abflussbildung kann differenziert eingegriffen werden. Das NA-Geschehen kann weitgehend kalibriert werden. Es ist allerdings auch zu bedenken, dass die Flexibilität des Modells risikobehaftet ist - die Abflussbildung kann nach Belieben beeinflusst werden. Fazit: Flexibel in der Anwendung, bei NA-Messung empfehlenswert. Im Allgemeinen geringere Abflussmengen als Keser. Die Blackbox von Keser ist zwar nicht steuerbar, entzieht sich damit aber auch Wissensdefiziten und Manipulationseinflüssen. Über Parameter und deren Auswirkungen muss nicht spekuliert werden. Wenn mehrere Personen mit dem Modell von Keser arbeiten, ergeben sich im Gegensatz zur Grenzwertmethode zwangsweise dieselben Ergebnisse - gleiche geometrische Oberflächendaten vorausgesetzt. Außerdem kommt Keser ohne die Bodenart aus. Fazit: Bei BFG >20%, einfache Handhabung, geringer Aufwand. Gegenüber der Grenzwertmethode (mittlere Verhältnisse) jedoch etwas höhere Abflüsse. Das Programmpaket HYKAS der Fa. Rehm Software ermöglicht u.a. den Nachweis von Kanalnetzen und bietet in diesem Zusammenhang beide Modellansätze zur Auswahl an. Der Programmanwender kann damit eine am Datenbestand bzw. an den Vorgaben des Auftraggebers ausgerichtete Modellauswahl treffen. Die realitätsnahe Ermittlung der Oberflächenabflüsse ist kompliziert. Weitere Unwegsamkeiten warten nach der Abflussbildung bei der Abflusskonzentration auf: Es ist z.B. die Festlegung der Fließlänge auf der Oberfläche erforderlich... Es ist noch ein weiter Weg bis zur Kläranlage.
Dipl.-Ing. Hartmut Hoevel - Erftverband, Bergheim. 3 Seiten (S. 75-77). Beitrag zum 2. Aachener Softwaretag in der Wasserwirtschaft <2, 2009, Aachen> Die Erft ist ein linker Nebenfluss des Rheins. Der Fluss ist durch eingeleitetes Sümpfungswasser aus dem rheinischen Braunkohletagebau hinsichtlich der Wassermenge und der Temperatur stark belastet. Die vorgestellten Überlegungen betreffen die Fragen: 1. Wie soll die Erft im Jahr 2045, also nach dem voraussichtlichen Ende der Tagebauaktivitäten im Rheinischen Braunkohlerevier und damit einhergehender Beenigung der Sümpfungswassereinleitung, aussehen? 2. Wie schnell und auf welche Weise soll die Umgestaltung der Erft vonstatten gehen?
Mischwassereinleitungen in Gewässer nach BWK Merkblatt M3 - Vorteile des detaillierten Nachweises
(2009)
Dipl.-Ing. Brigitte Huber und Dr.-Ing. Gerd Demny - Wasserverband Eifel Rur, Düren. 16 Seiten ( S. 59-74). Beitrag zum 2. Aachener Softwaretag in der Wasserwirtschaft <2, 2009, Aachen> Zusammenfassung [der Autoren] Für das städtisch geprägte Einzugsgebiet des Broicher Baches sind ein vereinfachter und ein detaillierter Nachweis nach BWK-M3 durchgeführt worden. Dabei zeigt sich, dass die Methodik des vereinfachten Nachweises nicht geeignet ist, um eine realitätsnahe Abbildung der einleitungsgeprägten Abflüsse des Gewässers zu erhalten. Dies ist insbesondere auf die Vernachlässigung von Wellentranslation und -retention im Gerinne zurückzuführen. Die dadurch entstehende Fehleinschätzung der Abflussverhältnisse versperrt den Blick auf eine situationsgerechte Maßnahmenplanung. Der mit Hilfe eines NA-Modells geführte detaillierte Nachweis ist zwar in der Erstellung aufwändiger, zeichnet aber ein reales Bild der Abflusserhöhung durch Einleitungen. Mit Hilfe des Modells können die wesentlichen Einflüsse schnell lokalisiert und zielführende Maßnahmenvarianten identifiziert werden. In dem hier vorgestellten Beispiel des Broicher Baches können die ursprünglich identifizierten acht Maßnahmen auf eine reduziert werden. Das Gesamtvolumen der erforderlichen Rückhaltungen wird um die Hälfte verringert. Der Vergleich beider Nachweismethoden legt nach Ansicht der Autoren nahe, den vereinfachten Nachweis höchstens für eine erste Einschätzung des Maßnahmenbedarfs anzuwenden. Die Maßnahmenidentifikation und -dimensionierung sollte grundsätzlich mit der detaillierten Nachweismethode durchgeführt werden, die auf einem entsprechenden NA-Modell basiert. Dies gilt insbesondere für Gewässerstrecken, deren Abfluss durch mehrere, hintereinander liegende Einleitungsstellen geprägt ist.
Wireless CAN
(2018)
Das vorgestellte System zu Wireless CAN bietet die Möglichkeit, CAN kabellos zu übertragen. Beide vorgestellten und entwickelten Konzepte funktionieren korrekt und ermöglichen den Auf-bau von kabellosen CAN Schnittstellen. Durch den kleinen Aufbau kann diese Technologie auch für eingebettete Systeme verwendet werden. Zudem bietet dieser Ansatz die Möglichkeit, durch die Entwicklung von geeigneten ICs die Größe des Systems bis auf Bauteilgröße zu reduzieren, um eine noch bessere Integration in eingebettete Systeme zu ermöglichen. Dadurch wird die Technologie attraktiv für Einsatzgebiete, wo die oben aufgelisteten Vorteile zum Tragen kommen können. Diese Einsatzgebiete können sowohl im Automobil als auch im Industriebereich liegen.
"[...] Der erste Teil des Vortags konzentriert sich auf die bei Ericsson gemachten Erfahrungen. Welche Muster wurden identifiziert, für welche Tests wurden sie eingesetzt. Wie werden diese Muster verwendet, wie werden sie beschrieben und spezifiziert. Und schließlich, wie entsteht eine Art Standardisierung, in der das Wissen über diese Muster als Organisationswissen zur Verfügung steht.
Im zweiten Teil des Vortrags werden die bei Ericsson gemachten Erfahrungen verallgemeinert. Die bei Ericsson verwendeten Muster werden auf allgemeine Strukturen übertragen (z.B. Client-Server). Es wird gezeigt, wie die Zuordnung von Testverfahren auf Netzwerkmuster auch in anderen Domänen verwendet wird und welche Vorteile sich damit erzielen lassen."
Quelle: http://www.qs-tag.de/fileadmin/software-qs-tag/public/2007/abstract_jacobs.shtml
Electromechanical model of hiPSC-derived ventricular cardiomyocytes cocultured with fibroblasts
(2018)
The CellDrum provides an experimental setup to study the mechanical effects of fibroblasts co-cultured with hiPSC-derived ventricular cardiomyocytes. Multi-scale computational models based on the Finite Element Method are developed. Coupled electrical cardiomyocyte-fibroblast models (cell level) are embedded into reaction-diffusion equations (tissue level) which compute the propagation of the action potential in the cardiac tissue. Electromechanical coupling is realised by an excitation-contraction model (cell level) and the active stress arising during contraction is added to the passive stress in the force balance, which determines the tissue displacement (tissue level). Tissue parameters in the model can be identified experimentally to the specific sample.
Pandaboard, TurtleBot, Kinect und Co. : Low-Cost Hardware im Lehreinsatz für die mobile Robotik.
(2012)
Mit freundlicher Genehmigung der Autoren und des Oldenbourg Industrieverlags https://www.oldenbourg-industrieverlag.de/de/9783835633223-33223 erschienen als Beitrag im Tagungsband zur AALE-Tagung 2012. 9. Fachkonferenz 4.-5. Mai 2012, Aachen, Fachhochschule. ISBN 9783835633223 S 8-1 S. 229-238 Original-Abstract des Autors: "Die mobile Robotik wird durch den Einsatz von Low-Cost Hardware einem breiten Publikum zugänglich. Bis vor kurzem basierte eine erschwingliche Hardware meist auf Mikrocontrollern mit den entsprechenden Leistungseinschränkungen z.B. im Bereich der Bildverarbeitung. Die Wahrnehmung einer 3D-Umgebung und somit die Möglichkeit zur autonomen Navigation wurde mit relativ kostenintensiver Hardware, z.B. Stereo-Vision-Systemen und Laserscannern gelöst. Die zur Auswertung der Sensorik notwendige Rechenleistung stand - entweder aufgrund des Stromverbrauchs oder der Performance meist für mobile Plattformen (lokal) - nicht zur Verfügung. Durch Einsatz von leistungsfähigen Prozessoren aus dem Bereich der Mobilgeräte (Smartphones, Tablets) und neuartigen Sensoren des Consumer-Bereichs, wie der Kinect, können mobile Roboter kostengünstig für den Einsatz in der Lehre aufgebaut werden.
Entwicklung eines Kletterroboters zur Diagnose und Instandsetzung von Windenergieanlagen (SMART)
(2016)
Hydrophobic magnetic nanoparticles (NPs) consisting of undecanoate-capped magnetite (Fe3O4, average diameter ca. 5 nm) are used to control quantized electron transfer to surface-confined redox units and metal NPs. A two-phase system consisting of an aqueous electrolyte solution and a toluene phase that includes the suspended undecanoatecapped magnetic NPs is used to control the interfacial properties of the electrode surface. The attracted magnetic NPs form a hydrophobic layer on the electrode surface resulting in the change of the mechanisms of the surface-confined electrochemical processes. A quinone-monolayer modified Au electrode demonstrates an aqueous-type of the electrochemical process (2e-+2H+ redox mechanism) for the quinone units in the absence of the hydrophobic magnetic NPs, while the attraction of the magnetic NPs to the surface results in the stepwise single-electron transfer mechanism characteristic of a dry nonaqueous medium. Also, the attraction of the hydrophobic magnetic NPs to the Au electrode surface modified with Au NPs (ca. 1.4 nm) yields a microenvironment with a low dielectric constant that results in the single-electron quantum charging of the Au NPs.
Ein vorausschauendes Risikomanagement beinhaltet, Risiken für das Unternehmen zu kalkulieren. Es liefert Entscheidungsgrundlagen, um diese Risiken zu begrenzen und es macht transparent, welche Risiken sinnvollerweise über Versicherungen abgedeckt werden sollten. Beim Versicherungsmanagement ist jedoch zu bedenken, dass zur Erreichung bestimmter Ziele Versicherungen nicht immer geeignet sind (z.B. Erhaltung der Lieferfähigkeit). Eintrittswahrscheinlichkeiten bestimmter Risiken lassen sich durch Versicherungen nicht verändern. Bei Unternehmen, die mit umfangreichen elektronischen Einrichtungen produzieren oder Dienstleistungen erbringen (und das sind heutzutage wohl die meisten), muss auch das Risiko durch Blitzeinwirkungen besondere Berücksichtigung finden. Dabei ist zu beachten, dass der Schaden aufgrund der Nicht-Verfügbarkeit der elektronischen Einrichtungen und damit der Produktion bzw. der Dienstleistung und ggf. der Verlust von Daten den Hardware-Schaden an der betroffenen Anlage oft bei weitem übersteigt. Im Blitzschutz gewinnt innovatives Denken in Schadensrisiken langsam an Bedeutung. Risikoanalysen haben die Objektivierung und Quantifizierung der Gefährdung von baulichen Anlagen und ihrer Inhalte durch direkte und indirekte Blitzeinschläge zum Ziel. Seinen Niederschlag hat dieses neue Denken in der neuen deutschen Vornorm DIN V 0185-2 VDE V 0185 Teil 2 [1] gefunden. Die hier vorgegebene Risikoanalyse gewährleistet, dass ein für alle Beteiligten nachvollziehbares Blitzschutz-Konzept erstellt werden kann, das technisch und wirtschaftlich optimiert ist, d.h. bei möglichst geringem Aufwand den notwendigen Schutz gewährleisten kann. Die sich aus der Risikoanalyse ergebenden Schutzmaßnahmen sind dann in den weiteren Normenteilen der neuen Reihe VDE V 0185 [2, 3] detailliert beschrieben.
Alle Unternehmen sind vielfältigen Risiken ausgesetzt, die Finanz- und Betriebsbereiche einschließlich Dienstleistungen betreffen können. Die Firmen müssen üblicherweise Risiken eingehen, um im Wettbewerb bestehen zu können. Entscheidend ist, dass man sich über die Risiken bewusst ist, diese einschätzen und kontrollieren kann. Falsche Einschätzungen, Versäumnisse und Fehlentscheidungen können empfindliche finanzielle Schäden bis hin zum Totalverlust nach sich ziehen. Ein effektives Risikomanagement ist heute als wichtiger Sicherheitsfaktor anzusehen und sollte zur strategischen Unternehmensführung gehören. Ein vorausschauendes Risikomanagement beinhaltet, Risiken für das Unternehmen zu kalkulieren. Es liefert Entscheidungsgrundlagen, um diese Risiken zu begrenzen und es macht transparent, welche Risiken sinnvollerweise über Versicherungen abgedeckt werden sollten. Beim Versicherungsmanagement ist jedoch zu bedenken, dass zur Erreichung bestimmter Ziele Versicherungen nicht geeignet sind (z.B. Erhaltung der Lieferfähigkeit). Eintrittswahrscheinlichkeiten bestimmter Risiken lassen sich durch Versicherungen nicht verändern. Bei Unternehmen, die mit umfangreichen elektronischen Einrichtungen produzieren oder Dienstleistungen erbringen (und das sind heutzutage wohl die meisten), muss auch das Risiko durch Blitzeinwirkungen besondere Berücksichtigung finden. Dabei ist zu beachten, dass der Schaden aufgrund der Nicht-Verfügbarkeit der elektronischen Einrichtungen und damit der Produktion bzw. der Dienstleistung und ggf. der Verlust von Daten den Hardware-Schaden an der betroffenen Anlage oft bei weitem übersteigt. Im Blitzschutz gewinnt innovatives Denken in Schadensrisiken langsam an Bedeutung. Risikoanalysen haben die Objektivierung und Quantifizierung der Gefährdung von baulichen Anlagen und ihrer Inhalte durch direkte und indirekte Blitzeinschläge zum Ziel. Seinen Niederschlag hat dieses neue Denken in der neuen deutschen Norm DIN V 0185-2 VDE V 0185 Teil 2 gefunden. Die hier vorgegebene Risikoanalyse gewährleistet, dass ein für alle Beteiligten nachvollziehbares Blitzschutz-Konzept erstellt werden kann, das technisch und wirtschaftlich optimiert ist, d.h. bei möglichst geringem Aufwand den notwendigen Schutz gewährleisten kann. Die sich aus der Risikoanalyse ergebenden Schutzmaßnahmen sind dann in den weiteren Normenteilen der neuen Reihe VDE V 0185 detailliert beschrieben.
Die neue Vornorm VDE V 0185 Teil 2 „Risikomanagement: Abschätzung des Schadensrisikos für bauliche Anlagen“ [1] ist seit November 2002 gültig. Sie ermöglicht nicht nur die Ermittlung der Schutzklasse eines Blitzschutzsystems, sondern auch die Untersuchung zur Notwendigkeit anderer Schutzmaßnahmen gegen Blitzeinwirkungen (Überspannungsschutzgeräte in Unterverteilern und/oder an Endgeräten, Schirmung des Gebäudes und/oder interner Räume, Potentialsteuerung, Brandmelde- und Feuerlöscheinrichtungen, etc.) nach objektiven Kriterien und damit in einer für alle Beteiligten grundsätzlich nachvollziehbaren Art und Weise. Dass eine solche Analyse rel. komplex sein muss und der intensiven Beschäftigung bedarf, ist deshalb nicht verwunderlich. Die Komplexität des Verfahrens sollte allerdings nicht dazu führen, die Vornorm als Ganzes abzulehnen. Die Vornorm beruht auf dem Stand der Diskussion im internationalen Normengremium IEC TC81 WG9 Ende des Jahres 2000. Integriert wurden einige nationale Besonderheiten, die aus Sicht des zuständigen Normenkomitees DKE K251 erforderlich erschienen. In Deutschland konnten und können nun erste breite Erfahrungen in der Anwendung dieser Risikoanalyse gesammelt werden; in anderen Ländern ist dies noch nicht möglich. Diese Erfahrungen können dann, nach Diskussion im nationalen Rahmen, in die internationale Normenarbeit eingebracht werden. Im folgenden Beitrag sollen einige, seit Erscheinen der Vornorm oft wiederkehrende Fragen dargestellt und Lösungsvorschläge vorgestellt werden. Dabei wird auch auf die Tendenzen im internationalen Normengremium IEC TC81 WG9 eingegangen, d.h. auf den aktuellen Entwurf zur IEC 62305-2 [3]. Die Lösungsvorschläge werden begründet, sind allerdings weitestgehend subjektive Meinung des Autors. Für übliche bauliche Anlagen ist die Anwendung der Vornorm rel. einfach möglich. Auch für spezielle Fälle können die darin festgelegten Verfahren herangezogen werden; allerdings sind dann einige weiterführende Überlegungen notwendig, die der Planer von Blitzschutzsystemen durchführen muss. Anhand zweier Beispiele soll die Anwendung der VDE V 0185 Teil 2 auf solche speziellen Fälle dargestellt werden.
[Paper of the X International Symposium on Lightning Protection 9th - 13th November, 2009 - Curitiba, Brazil. 6 pages] The international standard IEC 62305-3, published in 2006, requires as an integral part of the lightning protection system (LPS) the consideration of a separation distance between the conductors of the LPS and metal and electrical installations inside the structure to be protected. IEC 62305-3 gives two different methods for this calculation: a standard, simplified approach and a more detailed approach, which differ especially regarding the treatment of the current sharing effect on the LPS conductors. Hence, different results for the separation distance are possible, leading to some discrepancies in the use of the standard. The standard approach defined in the main part (Clause 6.3) and in Annex C of the standard in some cases may lead to a severe oversizing of the required separation distance. The detailed approach described in Annex E naturally gives more correct results. However, a calculation of the current sharing amongst all parts of the air-termination and downconductor network is necessary, in many cases requiring the use of network analysis programs. In this paper simplified methods for the assessment of the current sharing are presented, which are easy to use as well as sufficiently adequate.
In the presented paper data collected from the field related to damage statistics of electrical and electronic apparatus in household are reported and investigated. These damages (total number approx. 74000 cases), registered by five German insurance companies in 2005 and 2006, were adviced by customers as caused by lightning overvoltages. With the use of stochastical methods it is possible, to reasses the collected data and to distinguish between cases, which are with high probability caused by lightning overvoltages, and those, which are not. If there was an indication for a direct strike, this case was excluded, so the focus was only on indirect lightning flashes, i.e. only flashes to ground near the structure and flashes to or nearby an incoming service line were investigated. The data from the field contain the location of damaged apparatus (residence of the policy holder) and the distances of the nearest cloud-to-ground stroke to the location of the damage registered by the German lightning location network BLIDS at the date of damage. The statistical data along with some complementary numerical simulations allow to verify the correspondence of the Standards rules used for IEC 62305-2 with the field data and to define some correction needs. The results could lead to a better understanding whether a damage reported to an insurance company is really caused by indirect lightning, or not.
In the paper the results obtained from experiments at a modelled reinforced building in case of a direct lightning strike are compared with calculations. The comparison includes peak values of the magnetic field Hmax, its derivative (dH/dt)max and of induced voltages umax in typical cable routings. The experiments are performed at a 1:6 scaled building and the results are extrapolated using the similarity relations theory. The calculations are based on the approximate formulae given in IEC 62305-4 and have to be supplemented by a rough estimation of the additional shielding effect of a second reinforcement layer. The comparison shows, that the measured peak values of the magnetic field and its derivative are mostly lower than the calculated. The induced voltages are in good agreement. Hence, calculations of the induced voltages based on IEC 62305-4 are a good method for lightning protection studies of buildings, where the reinforcement is used as a grid-like electromagnetic shield.
In the paper a lightning protection design concept for renewable energy hybrid-systems without power mains connection is described. Based on a risk analysis protection measures against direct strikes and overvoltages are shown in an overview. The design concept is realized exemplarily for the hybrid-system VATALI on the Greek island Crete. VATALI, not lightning protected at that time, was a victim of a lightning strike in the year 2000 causing destructions and damages of some mechanical and electrical components with costs of approx. 60.000 €. The hardware costs for the protection measures were about 15.000 €: about 50% of the costs are due to protection measures against direct strikes, 50% are due to overvoltage protection.
Lightning protection design of a renewable energy hybrid-system without power mains connection
(2001)
In the year 2000 a direct lightning strike to the hybridsystem without power mains connection VATALI on the Greek island Crete results in the destruction and damage of some mechanical and electrical components. The hybrid-system VATALI was not lightning protected at that time. The hardware damage costs are approx. 60,000 €. The exposed site of the hybrid-system on top of a mountain was and still is the reason for a high risk of lightning strikes. Also in the future further lightning strikes have to be taken into consideration. In the paper a fundamental lightning protection design concept for renewable energy hybrid-systems without power mains connection and protection measures against direct strikes and overvoltages are shown in detail. The design concept was realized exemplarily for the hybrid-system VATALI. The hardware costs for the protection measures were about 15,000 €. About 50% of the costs are due to protection measures against direct strikes, 50% are due to overvoltage protection. Future extensions, new installations, or modifications have to be included into the lightning protection design concept of the hybrid-system.
Bauliche Anlagen mit Stahlkonstruktionen (bzw. auch Stahlbetonskelett- Konstruktionen) und metallenen Wänden sind bereits in sehr großer Zahl errichtet. Dazu gehören kleinere bis größere Lagerhallen ebenso wie Einkaufszentren. Sie zeichnen sich durch große Flexibilität, einfache Planung, kurze Bauzeit und rel. geringe Kosten aus. Auch in der nahen Zukunft ist deshalb mit Planung und Errichtung weiterer solcher baulicher Anlagen zu rechnen. Abhängig von der Nutzung der Hallen sind auch mehr oder weniger umfangreiche elektrische und elektronische Systeme vorhanden, die wichtige Funktionen sicherstellen müssen. Der Blitzschutz für diese baulichen Anlagen sollte sich also nicht nur im „klassischen“ Gebäude-Blitzschutz nach DIN V 0185-3 VDE V 0185 Teil 3 [1] erschöpfen; ein Ergänzung hin zu einem sinnvollen Grundschutz der elektrischen und elektronischen Systeme nach DIN V 0185-4 VDE V 0185 Teil 4 [2] ist anzuraten. Im folgenden Beitrag wird ein Konzept vorgestellt, mit dem ein hochwertiger Blitzschutz sowohl der baulichen Anlage und der darin befindlichen Personen, als auch der elektrischen und elektronischen Systeme verwirklicht werden kann. Insbesondere bei großflächigen Hallen stellen sich dabei besondere Anforderungen. Das Konzept und die zugehörigen blitzschutz-technischen Maßnahmen können drei Hauptbereichen zugeordnet werden: - Äußerer Blitzschutz; - Innerer Blitzschutz; - weitergehende besondere Maßnahmen. Das Konzept sowie die Maßnahmen werden allgemein beschrieben und teilweise anhand einer ausgeführten Anlage mit Fotos beispielhaft dokumentiert.
Im Rahmen eines modernen Blitzschutzsystems für Stahlbeton-Bauten bietet es sich an, die Betonbewehrung zu benutzen: - Sie kann die Funktionen der Ableitungseinrichtungen und des Blitzschutz- Potentialausgleichs bei einem klassischen Gebäude-Blitzschutz übernehmen [1]; - Sie kann, ggf. bei entsprechender Ergänzung, als ein geschlossener Käfig ausgebildet werden und damit eine deutliche Reduzierung der Belastung elektrischer / elektronischer Systeme durch blitzinduzierte elektromagnetische Felder erbringen (LEMP-Schutz [2]). Die Nutzung der Bewehrung ist dabei grundsätzlich gleichermaßen bei Neubauten wie auch bei Ertüchtigungen möglich und sinnvoll. So stellt die Nutzung der Bewehrung beispielsweise im Bereich von Großkraftwerken eine wesentliche Ertüchtigungsmaßnahme für den Blitzschutz elektrischer und elektronischer Einrichtungen dar: - Einerseits wird der Blitzschutz-Potentialausgleich durch den Anschluss metallener Einrichtungen wie Elektronik-Schränke, Kabeltrag-Konstruktionen, Rohrleitungen, etc. an die Bewehrung deutlich verbessert. - Andererseits kann bei größeren Gebäuden die elektromagnetische Schirmwirkung durch die elektrische Überbrückung von vorhandenen Dehnfugen bei Stahlbetonbauten optimiert werden. Diese Dehnfugen sind teilweise nur unzureichend überbrückt, so dass bei Blitzeinschlag in das betreffende oder ein benachbartes Gebäude an Kabelstrecken, die über die Dehnfuge hinwegführen, rel. hohe Spannungen induziert werden können [2, 3]. Die sich um das gesamte Gebäude herumziehende oder zwischen zwei Gebäuden befindliche Dehnfuge muss deshalb im Abstand von maximal einigen Metern überbrückt werden. Im Falle von Blitzschutz-Ertüchtigungen in vorhandenen Gebäuden wird bisher an jeder geplanten Anschlussstelle die Bewehrung großflächig (∅ wenige 10 cm) freigelegt, dort ein elektrischer Anschluss zu dem Bewehrungsstab hergestellt, z.B. mittels eines Erdungsfestpunkts, und dann die Betonoberfläche wieder geschlossen. Je nach prognostizierter Strombelastung wird teilweise versucht, den über den Anschluss fließenden Strom bereits auf mehrere Bewehrungsstäbe zu verteilen. Dazu sind entweder die kreuzenden Stäbe zu verschweißen oder es sind direkt Anschlüsse an zwei Bewehrungsstäbe herzustellen. All dieses bedeutet einen hohen Aufwand bei der Freilegung der Bewehrung und auch wieder bei der Schließung der entstandenen Betonlöcher. Es soll deshalb hier untersucht werden, ob es beispielsweise zum Zwecke des Blitzschutz-Potentialausgleichs und auch zur Überbrückung von Dehnfugen ausreichend ist, den Anschluss an die Bewehrung nach einfachen Verfahren nur jeweils an einen Bewehrungsstab herzustellen. Damit würde der finanzielle und administrative Aufwand an Betonarbeiten deutlich reduziert. Die hier dargestellten Verfahren sind dabei insbesondere für den Einsatz bei Blitzschutz-Ertüchtigungen in bestehenden Gebäuden vorgesehen. Abschließend sollen deshalb die Möglichkeiten zur Prüfung korrekter Anschlüsse, die Grenzen der Verfahren sowie auch die Grenzen der Anwendbarkeit bei Neuanlagen diskutiert werden.
Blitzschutzkonzept für eine netz-autarke Hybridanlage am Beispiel der Anlage VATALI auf Kreta
(2001)
Netz-autarke Anlagen bestehen üblicherweise aus einer oder mehreren Photovoltaik- (PV-) Anlagen, ggf. auch Solarthermie- (ST-) Anlagen und einem oder mehreren kleineren Windgeneratoren (sie werden deshalb auch als Hybridanlagen bezeichnet) und werden vor allem in Gegenden mit sehr schlechter öffentlicher Energieversorgung eingesetzt, d.h. insbesondere in rel. dünn bewohnten Gebieten und in Entwicklungsländern. Der Blitzschutz von netz-autarken Hybridanlagen ist ein bislang noch vergleichsweise unzureichend bearbeitetes Fachgebiet. Für große Windenergie-Anlagen (WEA) wurde in den letzten Jahren eine Zahl von FuE-Projekten durchgeführt, zum Großteil finanziert durch die öffentliche Hand, zum kleineren Teil auch durch die Industrie, d.h. die WEAHersteller. Dabei wurden bestehende Defizite im Design der WEA festgestellt und Maßnahmen vorgeschlagen, die vor den mechanischen Zerstörungen insbesondere des Rotors und vor den Störungen und Zerstörungen an den elektrischen / elektronischen Systemen der WEA weitgehend Schutz bieten [1, 2, 3]. Der Stand-der- Normung ist im Entwurf DIN VDE 0127 Teil 24 „Blitzschutz für Windenergieanlagen“ (dt. Übersetzung des internationalen Drafts IEC 61400-24 „Wind turbine generator systems; Part 24: Lightning Protection“) dokumentiert [4]. Die Maßnahmen sind allerdings insbesondere für größere WEA vorgesehen; im Falle kleinerer WEA lassen sie sich nur bedingt umsetzen. Trotzdem sind auch kleinere WEA rel. stark blitzeinschlaggefährdet, wenn sie auf einer Bergkuppe o.ä. platziert werden. Für solche kleinere WEA, wie sie bei Hybridanlagen üblicherweise Verwendung finden, müssen die Blitzschutzmaßnahmen aus der DIN VDE 0127 Teil 24 angepasst werden. Für PV- und ST-Anlagen ist eine entsprechende Blitzschutz-Norm noch nicht in Sicht. Hier ist vor allem der Schutz gegen direkte Blitzeinschläge in die Anlage bzw. die Gebäude noch nicht ausreichend beachtet. Blitzfangeinrichtungen sind oft nicht vorgesehen. In aller Regel hat man dabei bisher eine Ausführungsform des Blitzschutzes realisiert, die primär einen Ferneinschlag berücksichtigt und die dabei entstehenden induzierten, rel. energieschwachen Überspannungen durch schwächere Schutzelemente wie Rückstromdioden, Bypassdioden und zum Teil thermisch überwachte Varistoren begrenzt [5, 6, 7]. Diese Schutzelemente können allerdings bei Naheinschlägen bzw. Direkteinschlägen überlastet und damit zerstört werden. Darüber hinaus können Nahoder Direkteinschläge auch zur Schwächung der elektrischen Festigkeit der PVModulisolierung führen. Die Folge davon sind lokale extreme Wärmeentwicklungen, die sogar ein Schmelzen von Glas (sekundärer Langzeiteffekt) hervorrufen könnten. Bei einem Blitzeinschlag in die netz-autarke Hybridanlage VATALI auf Kreta im Jahre 2000 wurden sowohl einige mechanische wie auch elektrische Komponenten der Anlage zerstört bzw. zum Teil schwer beschädigt. Die Anlage VATALI besaß zum Zeitpunkt des Blitzeinschlags keinen wirksamen Blitzschutz. Der Gesamtschaden der Hardware belief sich auf ca. 60.000,- EURO. Die exponierte Stellung der Anlage auf einer Bergspitze stellte und stellt nach wie vor ein enormes Blitzeinschlag-Risiko dar, so dass auch zukünftig mit Blitzeinwirkungen gerechnet werden muss. Die Anlage wurde inspiziert, blitzschutz-technische Erfordernisse definiert und daraus Ertüchtigungsmaßnahmen abgeleitet, die mit überschaubarem Aufwand realisierbar sind.
IASSE-2004 - 13th International Conference on Intelligent and Adaptive Systems and Software Engineering eds. W. Dosch, N. Debnath, pp. 245-250, ISCA, Cary, NC, 1-3 July 2004, Nice, France We introduce a UML-based model for conceptual design support in civil engineering. Therefore, we identify required extensions to standard UML. Class diagrams are used for elaborating building typespecific knowledge: Object diagrams, implicitly contained in the architect’s sketch, are validated against the defined knowledge. To enable the use of industrial, domain-specific tools, we provide an integrated conceptual design extension. The developed tool support is based on graph rewriting. With our approach architects are enabled to deal with semantic objects during early design phase, assisted by incremental consistency checks.